International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:189 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  [ Questions: Q6/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1318 ]  
 
2015-06-08 Huawei Technologies Co., Ltd.   EVM measurements and investigations for draft revised G.698.2     Q6/15  
[ 1315 ]  
 
2015-06-08 Telecom Italia S.p.A.   Flexible Optical Transceivers design and development in ICT PANTHER project     Q6/15  
[ 1299 ]  
 
2015-06-08 Prysmian SpA   CHROMATIC DISPERSION COEFFICIENT SPECIFICATION FOR G.652 & G.657.A FIBRES     Q6/15, Q5/15  
[ 1297 ]  
 
2015-06-08 Prysmian SpA   Prysmian Group view on revision of ITU-T Recs. G.652 and G.657     Q6/15, Q5/15  
[ 1294 ]  
 
2015-06-08 Prysmian SpA   Proposal for deletion of Recommendation ITU-T G.651.1     Q6/15, Q5/15  
[ 1287 ]  
 
2015-06-08 Fujitsu Limited   Measurement data of TIA for APD based receiver and the simulation results of receiver sensitivity in G.959.1     Q6/15  
[ 1285 ]  
 
2015-06-08 Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT)   Proposal of parameters for G.654.E fibre category     Q6/15, Q5/15  
[ 1266 ]  
 
2015-06-08 China Unicom , ZTE Corporation   Proposals about the Super-Nyquist DWDM in G.sup39     Q6/15  
[ 1265 ]  
 
2015-06-08 China Unicom , Ministry of Industry and Information Technology (MIIT) (CATR) , ZTE Corporation   To add multi-dimensional modulation format in G.sup.39     Q6/15  
[ 1264 ]  
 
2015-06-08 China Unicom , Ministry of Industry and Information Technology (MIIT) (CATR) , ZTE Corporation   To add a note to OSNR in G.697     Q6/15  
[ 1232 ]  
 
2015-06-08 Ministry of Industry and Information Technology (MIIT) , China Telecommunications Corporation , ZTE Corporation   Proposal for speed up long-haul high bitrate WDM systems Recommendation study     Q6/15  
[ 1230 ]  
 
2015-06-08 Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation , ZTE Corporation   Updated proposal for alternative in-band OSNR measurement technique in G.697     Q6/15  
[ 1229 ]  
 
2015-06-08 Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Measurement results and consideration on EVM related parameters     Q6/15  
[ 1223 ]  
 
2015-06-07 China Unicom , ZTE Corporation   Proposal to speed up the revision of G.698.2     Q6/15  
[ 1222 ]  
 
2015-06-07 China Unicom   Proposal to discuss application code considering the span distance and link loss in G.metro     Q6/15  
[ 1221 ]  
 
2015-06-07 ADVA Optical Networking , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , FiberHome Technologies Group , Telefon AB - LM Ericsson , ZTE Corporation   The consideration of communication channel of G.metro     Q6/15  
[ 1220 ]  
 
2015-06-07 China Unicom   Considerations on the revision of G.654 for terrestrial application     Q6/15, Q5/15  
[ 1219 ]  
 
2015-06-07 China Unicom , ADVA Optical Networking , Alcatel-Lucent International , Coriant GmbH & Co. KG , Deutsche Telekom AG , Fraunhofer-Institut für Nachrichtentechnik Heinrich-Hertz-Institut , Keysight Technologies Deutschland GmbH , Orange   Measurements on EVM and OSNR  
TSB NOTE - This Contribution was reposted on 24 June 2015 to correct a display issue in some versions of Word. There are no content changes in the replacement file.
 
Q6/15  
[ 1215 ]  
 
2015-06-07 Finisar Corporation , Telefon AB - LM Ericsson   Considerations on physical layer parameters for G.metro     Q6/15  
[ 1205 ]  
 
2015-06-05 SOFTBANK MOBILE Corp.   Proposal of channel frequency plans for G.metro     Q6/15  
[ 1182 ]  
 
2015-06-03 Ciena Canada   Proposed changes to G.959.1     Q6/15  
[ 1175 ]  
 
2015-06-01 Finisar Corporation   DML Measurements supporting the 4L1-9D1F application code     Q6/15  
[ 1174 ]  
 
2015-06-01 Finisar Corporation   Thoughts on the Tuning State Machine for G.metro     Q6/15  
[ 1173 ]  
 
2015-06-01 Finisar Corporation   EML Measurements supporting the 4L1-9D1F application code     Q6/15  
[ 1152 ]  
 
2014-11-11 Electronics and Telecommunications Research Institute (ETRI) , Transmode Systems AB   Crosstalk model and mux/demux measurements for determination of TEE tuning requirements     Q6/15  
Results:189 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-2-13