Contributions
[ AI/Question: Q4/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 772 ]
|
G.fast: On Reverse Power Feeding system noise requirements
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-11 |
|
[ 767 ]
|
G.vdsl2, G.inp: Stability issues and mitigation of non-stationary noise in LPM
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-03-11 |
|
[ 766 ]
|
G.fast: Additional requirements to address specifics of RPF noise
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-03-11 |
|
[ 764 ]
|
G.vdsl: New 998ADE17 Band Plan for VDSL2
|
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-03-11 |
|
[ 763 ]
|
G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2
|
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-03-11 |
|
[ 762 ]
|
G.fast: On TIGA and SRA
|
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-03-11 |
|
[ 756 ]
|
Proposal of a new study item: "Plant solutions for FTTdp (Fiber To The distribution point) architecture"
|
Italy
|
Q4/15, Q16/15
|
2014-03-11 |
|
[ 751 ]
|
G.fast: Proposed Liaison to ETSI TM6 on RPF Noise
|
Alcatel-Lucent France
|
Q4/15
|
2014-03-11 |
|
[ 750 ]
(Rev.1) |
VDSL2 and G.FAST need a flexible protection mechanism against time varying noise.
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-11 |
|
[ 749 ]
|
G.fast: Data rate impact and requirements of Reverse Power Feeding systems
|
Alcatel-Lucent France
|
Q4/15
|
2014-03-11 |
|
[ 748 ]
|
G.inp: G.vdsl: VDSL2 Low Power Mode: Mandatory support of Virtual Noise
|
Alcatel-Lucent France
|
Q4/15
|
2014-03-11 |
|
[ 746 ]
|
G.fast: DTU's mapping and ACK bit-map structure (section 9.5)
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2014-03-11 |
|
[ 745 ]
|
G.fast: Alcatel-Lucent TAP comments on G.9700 (ex G.fast-PSD)
|
Alcatel-Lucent France
|
Q4/15
|
2014-03-11 |
|
[ 665 ]
|
G.fast: On the scope of G.fast Amendment 1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-10 |
|
[ 664 ]
|
G.fast: On standardisation of advanced UPBO methods for vectored G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-10 |
|
[ 607 ]
|
IPR statement.
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2014-03-10 |
|
[ 578 ]
|
G.fast: Comments on link-state transition
|
ZTE Corporation
|
Q4/15
|
2014-03-10 |
|
[ 511 ]
|
G.inp: Comparison of L2.1 power reduction methods
|
TQ DELTA. LLC
|
Q4/15
|
2014-03-07 |
|
[ 509 ]
|
G.hn, G.vdsl, G.fast : Objectives and Tools for PLC to DSL Interference Mitigation
|
Metanoia Technologies, Inc.
|
Q4/15, Q18/15
|
2014-03-07 |
|
[ 490 ]
|
IPR: Ikanos Communications on IPR declarations on G.9700 and G.9701.
|
Ikanos Communications
|
Q4/15
|
2014-03-07 |
|
[ 480 ]
|
G.inp: Proposed edits to help complete the VDSL LPM Amendment
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
Ikanos Communications
|
Q4/15
|
2014-03-07 |
|
[ 466 ]
|
Considerations on DS/US adjustment for the VDSL2
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q4/15
|
2014-03-07 |
|
[ 439 ]
(Rev.1) |
[FAST] Proposal for improvements to draft text for G.fast-psd
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 438 ]
|
Extended RAM and Retransmission in VDSL2 on Vector Capable Hardware
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 437 ]
|
VDSL2 FTTdp annex
|
Orange
|
Q4/15
|
2013-06-18 |
|
[ 436 ]
|
[FAST] On Aggregate Transmitter Power
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 434 ]
|
[FAST] On Power Budget
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 431 ]
(Rev.1) |
[FAST] On VHF background noise assumptions for G.FAST
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 419 ]
|
G.fast: Discontinuous operation is not always the way to minimize power
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-18 |
|
[ 413 ]
|
[FAST] Low Power Mode Requirements for G.FAST
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 410 ]
|
G.fast: OLR procedures during G.fast initialization
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 406 ]
|
G.fast: DRA primitives and interface requirements at the gamma reference point
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 405 ]
|
G.fast: Energy Efficiency-performance trade-offs
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 404 ]
|
G.fast: Vectoring Backchannel Encapsulation
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 398 ]
|
G.fast: On Line Reconfiguration for Precoder Gain Scaling: working text figures
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 378 ]
|
G.fast: Alternative samples report by FTU-R for downstream crosstalk estimation
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-18 |
|
[ 375 ]
|
G.vdsl2, G.inp: Considerations related to VDSL2 low power mode
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 373 ]
|
G.993.5: Initialization using extended O-P-VECTOR 1
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 339 ]
|
G.fast: Operations and maintenance (OAM)
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 338 ]
|
G.fast: G.fast performance over KPN cable
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 337 ]
(Rev.1) |
G.fast: Proposal for early stages of initialization
|
Lantiq Beteiligungs-GmbH & Co. KG
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-18 |
|
[ 336 ]
|
G.vdsl2: Proposed corrigendum to G.993.2
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 335 ]
|
G.fast: Proposal for G.994.1 tones to be used in G.fast
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 334 ]
|
G.fast: Update of the working text for PMD section
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 333 ]
(Rev.1) |
G.fast: Update of the working text for PMS-TC section
|
Lantiq Beteiligungs-GmbH & Co. KG
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-18 |
|
[ 332 ]
(Rev.1) |
G.lt: MELT accuracy for a multi-component measurement
|
Deutsche Telekom AG
,
Lantiq Beteiligungs-GmbH & Co. KG
,
Telecom Italia S.p.A.
|
Q4/15
|
2013-06-18 |
|
[ 307 ]
|
G.fast: Proposal for discontinuous operation
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 306 ]
|
G.fast: Proposal for Representation of Reported Error Samples
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 305 ]
|
G.fast: DTUs acknowledgment working text
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 304 ]
|
G.fast: Fast OLR behaviour under impulsive noise environment
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
Results:256 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):