International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:256 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  [ AI/Question: Q4/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 772 ]  
 
G.fast: On Reverse Power Feeding system noise requirements     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 767 ]  
 
G.vdsl2, G.inp: Stability issues and mitigation of non-stationary noise in LPM     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 766 ]  
 
G.fast: Additional requirements to address specifics of RPF noise     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 764 ]  
 
G.vdsl: New 998ADE17 Band Plan for VDSL2     China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 763 ]  
 
G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2     Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 762 ]  
 
G.fast: On TIGA and SRA     Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 756 ]  
 
Proposal of a new study item: "Plant solutions for FTTdp (Fiber To The distribution point) architecture"     Italy   Q4/15, Q16/15   2014-03-11
[ 751 ]  
 
G.fast: Proposed Liaison to ETSI TM6 on RPF Noise     Alcatel-Lucent France   Q4/15   2014-03-11
[ 750 ]  
(Rev.1) 
VDSL2 and G.FAST need a flexible protection mechanism against time varying noise.     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 749 ]  
 
G.fast: Data rate impact and requirements of Reverse Power Feeding systems     Alcatel-Lucent France   Q4/15   2014-03-11
[ 748 ]  
 
G.inp: G.vdsl: VDSL2 Low Power Mode: Mandatory support of Virtual Noise     Alcatel-Lucent France   Q4/15   2014-03-11
[ 746 ]  
 
G.fast: DTU's mapping and ACK bit-map structure (section 9.5)     Sckipio Technologies S.I. Ltd.   Q4/15   2014-03-11
[ 745 ]  
 
G.fast: Alcatel-Lucent TAP comments on G.9700 (ex G.fast-PSD)     Alcatel-Lucent France   Q4/15   2014-03-11
[ 665 ]  
 
G.fast: On the scope of G.fast Amendment 1     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-10
[ 664 ]  
 
G.fast: On standardisation of advanced UPBO methods for vectored G.fast     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-10
[ 607 ]  
 
IPR statement.     Sckipio Technologies S.I. Ltd.   Q4/15   2014-03-10
[ 578 ]  
 
G.fast: Comments on link-state transition     ZTE Corporation   Q4/15   2014-03-10
[ 511 ]  
 
G.inp: Comparison of L2.1 power reduction methods     TQ DELTA. LLC   Q4/15   2014-03-07
[ 509 ]  
 
G.hn, G.vdsl, G.fast : Objectives and Tools for PLC to DSL Interference Mitigation     Metanoia Technologies, Inc.   Q4/15, Q18/15   2014-03-07
[ 490 ]  
 
IPR: Ikanos Communications on IPR declarations on G.9700 and G.9701.     Ikanos Communications   Q4/15   2014-03-07
[ 480 ]  
 
G.inp: Proposed edits to help complete the VDSL LPM Amendment     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , Ikanos Communications   Q4/15   2014-03-07
[ 466 ]  
 
Considerations on DS/US adjustment for the VDSL2     China Unicom , Huawei Technologies Co. Ltd.   Q4/15   2014-03-07
[ 439 ]  
(Rev.1) 
[FAST] Proposal for improvements to draft text for G.fast-psd     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 438 ]  
 
Extended RAM and Retransmission in VDSL2 on Vector Capable Hardware     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 437 ]  
 
VDSL2 FTTdp annex     Orange   Q4/15   2013-06-18
[ 436 ]  
 
[FAST] On Aggregate Transmitter Power     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 434 ]  
 
[FAST] On Power Budget     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 431 ]  
(Rev.1) 
[FAST] On VHF background noise assumptions for G.FAST     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 419 ]  
 
G.fast: Discontinuous operation is not always the way to minimize power     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-18
[ 413 ]  
 
[FAST] Low Power Mode Requirements for G.FAST     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 410 ]  
 
G.fast: OLR procedures during G.fast initialization     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2013-06-18
[ 406 ]  
 
G.fast: DRA primitives and interface requirements at the gamma reference point     Alcatel-Lucent Bell N.V.   Q4/15   2013-06-18
[ 405 ]  
 
G.fast: Energy Efficiency-performance trade-offs     Alcatel-Lucent Bell N.V.   Q4/15   2013-06-18
[ 404 ]  
 
G.fast: Vectoring Backchannel Encapsulation     Alcatel-Lucent Bell N.V.   Q4/15   2013-06-18
[ 398 ]  
 
G.fast: On Line Reconfiguration for Precoder Gain Scaling: working text figures     Alcatel-Lucent Bell N.V.   Q4/15   2013-06-18
[ 378 ]  
 
G.fast: Alternative samples report by FTU-R for downstream crosstalk estimation     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-18
[ 375 ]  
 
G.vdsl2, G.inp: Considerations related to VDSL2 low power mode     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2013-06-18
[ 373 ]  
 
G.993.5: Initialization using extended O-P-VECTOR 1     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2013-06-18
[ 339 ]  
 
G.fast: Operations and maintenance (OAM)     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2013-06-18
[ 338 ]  
 
G.fast: G.fast performance over KPN cable     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2013-06-18
[ 337 ]  
(Rev.1) 
G.fast: Proposal for early stages of initialization     Lantiq Beteiligungs-GmbH & Co. KG , Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-18
[ 336 ]  
 
G.vdsl2: Proposed corrigendum to G.993.2     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2013-06-18
[ 335 ]  
 
G.fast: Proposal for G.994.1 tones to be used in G.fast     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2013-06-18
[ 334 ]  
 
G.fast: Update of the working text for PMD section     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2013-06-18
[ 333 ]  
(Rev.1) 
G.fast: Update of the working text for PMS-TC section     Lantiq Beteiligungs-GmbH & Co. KG , Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-18
[ 332 ]  
(Rev.1) 
G.lt: MELT accuracy for a multi-component measurement     Deutsche Telekom AG , Lantiq Beteiligungs-GmbH & Co. KG , Telecom Italia S.p.A.   Q4/15   2013-06-18
[ 307 ]  
 
G.fast: Proposal for discontinuous operation     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-17
[ 306 ]  
 
G.fast: Proposal for Representation of Reported Error Samples     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-17
[ 305 ]  
 
G.fast: DTUs acknowledgment working text     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-17
[ 304 ]  
 
G.fast: Fast OLR behaviour under impulsive noise environment     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-17
Results:256 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-18