International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:212 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  [ Questions: Q4/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1858 ]  
 
2016-02-02 Intel Corporation   Configuration counters in L2 states (G.9701 Amd 1)     Q4/15  
[ 1856 ]  
 
2016-02-02 Intel Corporation   Comments on the draft G.9701 Amendment 1     Q4/15  
[ 1840 ]  
 
2016-02-02 Proximus PLC   G.fast: Proximus requirements for G.fast operation on coax and CAT5 wires up to at least 150 meters     Q4/15  
[ 1838 ]  
 
2016-02-02 Futurewei Technologies US R&D Center , Metanoia Technologies, Inc.   G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission     Q4/15  
[ 1817 ]  
 
2016-02-02 Broadcom Corporation , Sckipio Technologies S.I. Ltd.   G.fast: Reduction of number VF samples reporting formats     Q4/15  
[ 1816 ]  
 
2016-02-02 Broadcom Corporation , Sckipio Technologies S.I. Ltd.   G.fast: Clarification on byte order in SOC and EOC messages.     Q4/15  
[ 1812 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: G.9701 test parameters text improvements     Q4/15  
[ 1810 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: Various text updates to G.9701 Amd1 Low power mode     Q4/15  
[ 1809 ]  
 
2016-02-02 Broadcom Corporation   G.fast: Proposal to restrict upstream transmit power for 8dBm profile     Q4/15  
[ 1808 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter     Q4/15  
[ 1807 ]  
 
2016-02-02 Broadcom Corporation , Intel Corporation , Qualcomm, Inc.   G.vdsl: Mis-estimation of SNR during MEDLEY     Q4/15  
[ 1806 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   Future work on G.fast recommendations     Q4/15  
[ 1805 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   G.fast, Editorial Correction to Figure Z-2.1     Q4/15  
[ 1804 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: G.fast XLOG test parameter     Q4/15  
[ 1802 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2     Q4/15  
[ 1801 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam, G.fast: Clarification on Unavailable State for corrigendum     Q4/15  
[ 1800 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam: Test parameter update time stamps in G.997.2 Amd1     Q4/15  
[ 1799 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast, G.ploam: Corrigenda to G.9701 and G.997.2     Q4/15  
[ 1798 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.     Q4/15  
[ 1797 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam: Missing lom failure in G.997.1     Q4/15  
[ 1792 ]  
 
2016-02-02 Telecom Italia S.p.A.   G.vector: Considerations about Multi-Vendor Vectoring standardization     Q4/15  
[ 1791 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   G.fast: On data rate reporting     Q4/15  
[ 1787 ]  
 
2016-02-02 Intel Corporation   Proposal for TIGAV transmission method     Q4/15  
[ 1783 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   G.fast: Upstream Hlog reporting     Q4/15  
[ 1782 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   G.ploam, Capability reporting in G.997.1 and G.997.2     Q4/15  
[ 1774 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc) , Futurewei Technologies US R&D Center   On G.fast based solution for Coax application     Q4/15  
[ 1744 ]  
 
2016-02-02 Intel Corporation   On the details of TIGAV procedure     Q4/15  
[ 1743 ]  
 
2016-02-02 Intel Corporation   Proposed eoc settings for Annex Q when used with G.993.5     Q4/15  
[ 1742 ]  
 
2016-02-02 Intel Corporation   On the timeout of L2.1-Entry procedure (G.9701 Amd 1)     Q4/15  
[ 1740 ]  
 
2016-02-02 Intel Corporation   Proposed corrigendum to G.9701     Q4/15  
[ 1702 ]  
(Rev.1) 
2016-02-01 Huawei Technologies Co., Ltd. , Metanoia Technologies , Swisscom SA   G.fast Amendment 2: Maximum Bit Loading Revisited     Q4/15  
[ 1701 ]  
(Rev.1) 
2016-02-01 Huawei Technologies Co., Ltd.   G.fast: Exchange and determine the time out of initialization stages in handshake     Q4/15  
[ 1672 ]  
 
2016-02-01 ADTRAN , AT&T, Inc.   G.fast: Dynamic Bandwidth Allocation (DBA) for G.fast - control and management     Q4/15  
[ 1668 ]  
(Rev.1) 
2016-02-01 ADTRAN , AT&T, Inc. , CenturyLink , Sckipio Technologies S.I. Ltd.   G.fast: FTU-R software upgrade over eoc     Q4/15  
[ 1662 ]  
 
2016-02-01 ADTRAN , AT&T, Inc. , Broadcom Corporation , Qualcomm, Inc. , Sckipio Technologies S.I. Ltd.   G.fast, G.hs: G.994.1 tone sets for coax     Q4/15  
[ 1661 ]  
 
2016-02-01 ZTE Corporation   G.Fast: Requirements for operation on copper lines extended to include coaxial cables     Q4/15  
[ 1660 ]  
 
2016-02-01 ZTE Corporation   G.Fast: Requirements for Dynamic Bandwidth Allocation (DBA) in G.fast operation on coax     Q4/15  
[ 1567 ]  
 
2016-01-29 Qualcomm, Inc.   G.fast: Framework for Dynamic US/DS Time Assignment Mechanism     Q4/15  
[ 1565 ]  
 
2016-01-29 Swisscom SA   G.fast - specification of Impulse noise monitoring     Q4/15  
[ 1563 ]  
(Rev.1) 
2016-01-29 AT&T, Inc. , ADTRAN , Sckipio Technologies S.I. Ltd.   G.fast: requirements for the DBA TDD DS/US ratio limits     Q4/15  
[ 1562 ]  
 
2016-01-29 ADTRAN , AT&T, Inc.   G.fast coax cable configurations     Q4/15  
[ 1561 ]  
(Rev.1) 
2016-01-29 AT&T, Inc. , Orange , TELUS Communications   G.fast 212 MHz amendment     Q4/15  
[ 1550 ]  
 
2016-01-28 ADTRAN , AT&T, Inc. , Sckipio Technologies S.I. Ltd.   G.fast: Signalling of DBA updates over the RMC     Q4/15  
[ 1549 ]  
 
2016-01-28 ADTRAN , AT&T, Inc. , Sckipio Technologies S.I. Ltd.   G.fast: DBA proposed way for changing the TDD DS/US ratio during showtime     Q4/15  
[ 1526 ]  
 
2016-01-27 Swisscom SA   G.fast - Need for improved reporting of EFTR     Q4/15  
[ 1524 ]  
 
2016-01-22 Swisscom SA   G.fast - Need for seamless reconfiguration of TARSNRM     Q4/15  
[ 1499 ]  
 
2015-12-10 British Telecommunications Public Ltd. Co. (BT Plc)   Release of BT cable (20 pair) NEXT measurements for use in simulations     Q4/15  
[ 1496 ]  
 
2015-06-09 Lantiq Beteiligungs-GmbH & Co. KG   G.dpm: Proposal for text modifications in G.dpm draft Recommendation     Q4/15  
[ 1482 ]  
 
2015-06-09 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: Proposed text updates for G.9701 Amd 1     Q4/15  
[ 1481 ]  
 
2015-06-09 Lantiq Beteiligungs-GmbH & Co. KG   G.vdsl2: Proposed update for Annex Q profiles     Q4/15  
Results:212 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-5-25