International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:47 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: Huawei Technologies Co. Ltd ]  [ Questions: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 958 ]  
 
2014-11-10 Huawei Technologies Co. Ltd.   Variable temperature test of G.8273     Q13/15  
[ 957 ]  
 
2014-11-10 Huawei Technologies Co. Ltd.   T-BC High-Frequency Noise (Jitter) Generation Results Based on Multiple Replications of Simulations     Q13/15  
[ 956 ]  
 
2014-11-10 Huawei Technologies Co. Ltd.   SyncE transient test of G.8273     Q13/15  
[ 955 ]  
 
2014-11-10 Huawei Technologies Co. Ltd. , Orange   Proposal of Cs-GNSS Ensembler clock     Q13/15  
[ 954 ]  
 
2014-11-10 Huawei Technologies Co. Ltd.   Proposal for G.8273.2     Q13/15  
[ 953 ]  
 
2014-11-10 Huawei Technologies Co. Ltd. , Orange   Noise transfer test of G.8273.2     Q13/15  
[ 952 ]  
 
2014-11-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Measurement accuracy of PRTC     Q13/15  
[ 951 ]  
 
2014-11-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   High-Level Time Synchronization Functional Model based on Media-Independent and Media-Dependent Layers     Q13/15  
[ 927 ]  
 
2014-11-10 China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal on Sync Management and OAM     Q14/15, Q13/15, Q10/15  
[ 926 ]  
 
2014-11-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Proposal for OTN synchronization     Q13/15  
[ 923 ]  
 
2014-11-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Proposal on defining the sync layer functions of OTN and extending G.781     Q13/15, Q11/15  
[ 919 ]  
 
2014-11-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Clock Management and Information Model     Q14/15, Q13/15  
[ 747 ]  
 
2014-03-11 Huawei Technologies Co. Ltd.   Information on Upcoming New Work on B100G OTN     Q13/15, Q11/15  
[ 737 ]  
 
2014-03-11 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures     Q13/15, Q11/15  
[ 736 ]  
 
2014-03-11 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance     Q13/15, Q11/15  
[ 735 ]  
 
2014-03-11 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal on Synchronization OAM in packet networks     Q13/15, Q10/15  
[ 687 ]  
 
2014-03-11 Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Consideration for 1588 over OTN by ESC     Q13/15, Q11/15  
[ 685 ]  
 
2014-03-11 Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Test and analysis about PTP over OTN by transparent mode     Q13/15, Q11/15  
[ 639 ]  
(Rev.1) 
2014-03-10 Huawei Technologies Co. Ltd.   Synchronization over OTN network     Q13/15, Q11/15  
[ 638 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   Test error of PRTC of G.8272     Q13/15  
[ 637 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   Proposals for G.8275.1     Q13/15  
[ 636 ]  
(Rev.1) 
2014-03-10 Huawei Technologies Co. Ltd. , Orange   Effect of lower network limit on PTP slave clock     Q13/15  
[ 635 ]  
 
2014-03-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   SyncE transient measurement method for G.8273.2     Q13/15  
[ 634 ]  
 
2014-03-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Consideration of second-order filtering of T-BC for output transient due to SyncE rearrangement, plus several corrections for Appendix II/G.8273.2     Q13/15  
[ 633 ]  
 
2014-03-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Physical layer frequency to PTP noise transfer gain peaking in G.8273.2     Q13/15  
Results:47 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-12-27