International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:298 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Next Next
Contributions  [ Questions: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1120 ]  
 
2014-11-11 Microsemi   Combining two-way flows [G.8260]     Q13/15  
[ 1119 ]  
 
2014-11-11 Vitesse Semiconductor Corporation   Improving EEC     Q13/15  
[ 1117 ]  
 
2014-11-11 Microsemi   Structure of Appendix on Metrics [G.8260]     Q13/15  
[ 1115 ]  
 
2014-11-11 Nokia Solutions and Networks Gmbh & Co. KG   Partial timing support metrics in a network containing BCs, G.8260     Q13/15  
[ 1114 ]  
 
2014-11-11 Nokia Solutions and Networks Gmbh & Co. KG   Network limit for assisted partial timing support in G.8271.2     Q13/15  
[ 1113 ]  
 
2014-11-11 Calnex Solutions Limited   G.8271.2: Potential Indoor Deployment Budget     Q13/15  
[ 1107 ]  
 
2014-11-11 ADVA Optical Networking   G.8275.1 & G.8275.2 : Mapping between ClockClass and Quality level     Q13/15  
[ 1106 ]  
 
2014-11-11 ADVA Optical Networking , Calnex Solutions Limited   G.8275.2: Requirement for an Accurate T3 Value     Q13/15  
[ 1105 ]  
 
2014-11-11 ADVA Optical Networking   G.8275.2 : A-BMCA     Q13/15  
[ 1103 ]  
 
2014-11-11 Calnex Solutions Limited   G.8272: PRTC Testing using GNSS Simulators     Q13/15  
[ 1102 ]  
 
2014-11-11 ADVA Optical Networking   8271.2 : HRM & PDV Network Limits for Partial Timing Support     Q13/15  
[ 1078 ]  
 
2014-11-11 Calnex Solutions Limited   G.8262: Option II Wander Transfer     Q13/15  
[ 1075 ]  
 
2014-11-11 Calnex Solutions Limited , China Unicom   Correction to G.8260, Figure 9     Q13/15  
[ 1063 ]  
 
2014-11-11 Orange   G8266:T-GM Scope Defintion     Q13/15  
[ 1041 ]  
 
2014-11-11 Rakon Limited   Clarifications on G.8262     Q13/15  
[ 1031 ]  
 
2014-11-11 Rakon Limited   Proposal for EECv2 specifications     Q13/15  
[ 1018 ]  
 
2014-11-11 China Unicom   Conclusions of "PTP only" and "SyncE+PTP" network test     Q13/15  
[ 1007 ]  
 
2014-11-11 Juniper Networks , PMC-Sierra, Inc.   PTP Timestamping on a Multi-Lane Interface     Q13/15, Q11/15  
[ 998 ]  
 
2014-11-10 Calnex Solutions Limited , Vitesse Semiconductor Corporation   T-TC-P Constant time error and noise generation [G.8273.3]     Q13/15  
[ 997 ]  
 
2014-11-10 Vitesse Semiconductor Corporation   T-TC Summary and Scope [G.8273.3]     Q13/15  
[ 996 ]  
 
2014-11-10 Vitesse Semiconductor Corporation   Proposed structure of G.8273.3 [G.8273.3]     Q13/15  
[ 994 ]  
 
2014-11-10 Calnex Solutions Limited , Orange , Vitesse Semiconductor Corporation   Measurement Setup for Systems with Telecom Transparent Clocks (T-TC) [G.8273]     Q13/15  
[ 990 ]  
 
2014-11-10 Orange   Time_information_message_ToD_Protocol_modification     Q13/15  
[ 989 ]  
 
2014-11-10 Orange   Time_event_message_ToD_Protocol_modification_Part_II     Q13/15  
[ 988 ]  
 
2014-11-10 Orange   Time_event_message_ToD_Protocol_modification     Q13/15  
Results:298 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2015-7-1