International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:474 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  [ Questions: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 2051 ]  
 
2016-09-05 China Unicom   Proposal on "position maintenance" work pattern of PRTC GNSS receiver     Q13/15  
[ 2050 ]  
 
2016-09-05 China Unicom   1588 network performance monitoring mechanism     Q13/15  
[ 2042 ]  
 
2016-09-05 Cisco Systems, Inc.   Leap second behaviour on PTP clocks [G.8265.1, G.8275.1, G8275.2]     Q13/15  
[ 2034 ]  
 
2016-09-05 KDDI Corporation , Nippon Telegraph and Telephone Corporation (NTT)   Proposal of maintenance of G.781 Option III     Q13/15  
[ 2033 ]  
 
2016-09-05 Nippon Telegraph and Telephone Corporation (NTT)   Proposal of frequency and time holdover alarms (Sync OAM)     Q13/15  
[ 2032 ]  
 
2016-09-05 Nippon Telegraph and Telephone Corporation (NTT)   Proposal of monitoring methods for PTP backup path (Sync OAM)     Q13/15  
[ 1999 ]  
 
2016-09-05 Qulsar, Inc.   PDV Templates for Testing Partial Timing Support     Q13/15  
[ 1977 ]  
 
2016-09-04 RAD Data Communications, Ltd.   TC Noise Model Analysis     Q13/15  
[ 1976 ]  
+Corr.1 
2016-09-04 RAD Data Communications, Ltd.   Removing Unnecessary Sections in G.8273.3     Q13/15  
[ 1975 ]  
+Corr.1 
2016-09-04 RAD Data Communications, Ltd.   G.8261 Editorial Comments     Q13/15  
[ 1974 ]  
 
2016-09-04 RAD Data Communications, Ltd.   Testing G.8261 Scenarios against G.8271.2 Network Limits     Q13/15  
[ 1971 ]  
 
2016-09-03 Deutsche Telekom AG   Reference switching and eEEC specification (Part 2)     Q13/15  
[ 1966 ]  
 
2016-09-03 Microsemi Corporation   Proposed modifications to draft G.709.1 for PTP over FlexO OSMC     Q13/15, Q11/15  
[ 1954 ]  
 
2016-09-02 ZTE Corporation   Synchronization management model, comments on TD549/WP3 Rev.1     Q14/15, Q13/15  
[ 1937 ]  
 
2016-09-02 Telefon AB - LM Ericsson   Considerations on sync in fronthaul     Q13/15  
[ 1936 ]  
 
2016-09-02 Telefon AB - LM Ericsson   SyncE Master ID (G.8264)     Q13/15  
[ 1935 ]  
 
2016-09-02 Telefon AB - LM Ericsson   T-TSC Physical layer frequency to PTP noise transfer specification (G.8273.2)     Q13/15  
[ 1934 ]  
 
2016-09-02 Telefon AB - LM Ericsson   Enhanced SyncE Network Limits (G.8261) and Clock (G.8262.1)     Q13/15  
[ 1899 ]  
 
2016-08-31 Ciena Canada   Response on redundant model in TD549     Q13/15  
[ 1898 ]  
 
2016-08-31 Ciena Canada   G.8263 Amd. 2 - Typos     Q13/15  
[ 1896 ]  
(Rev.1) 
2016-08-31 Ciena Canada   G.8262.1 short term phase transient response for parameter C     Q13/15  
[ 1892 ]  
 
2016-08-31 Integrated Device Technology (IDT)   G.8275.2 - Deny of service requests     Q13/15  
[ 1891 ]  
(Rev.1) 
2016-08-31 Integrated Device Technology (IDT)   G.8275.1 T-BC phase/time traceability information     Q13/15  
[ 1886 ]  
 
2016-08-31 Qulsar, Inc.   Regarding Packet-Based Clock Model in G.8273.4     Q13/15  
[ 1885 ]  
 
2016-08-31 Qulsar, Inc.   Regarding Functional Model in G.8273.4     Q13/15  
[ 1884 ]  
 
2016-08-31 Qulsar, Inc. , Silicon Laboratories, Inc.   Proposed text in G.8273.2 - Part 2     Q13/15  
[ 1883 ]  
 
2016-08-31 Qulsar, Inc. , Silicon Laboratories, Inc.   Proposed text in G.8273.2 - Part 1     Q13/15  
[ 1867 ]  
 
2016-02-02 Microsemi Corporation   Defining Two Network Limits for PTS/APTS [G.8271.2]     Q13/15  
[ 1866 ]  
 
2016-02-02 Microsemi Corporation   Number of T-BC-P/T-RC-P hops in PTS/APTS Network [G.8271.2]     Q13/15  
[ 1865 ]  
 
2016-02-02 Nokia Solutions and Networks GmbH & Co. KG   Matching definitions in G.8260 with the current definition of time error sequence     Q13/15  
[ 1864 ]  
 
2016-02-02 Microsemi Corporation   eEEC Option 1 extends EEC Option 2 [G.8262.1, G.8262]     Q13/15  
[ 1863 ]  
 
2016-02-02 Microsemi Corporation   Harmonized Virtual PTP Port [G.8275.1, G.8275.2, G.8271]     Q13/15  
[ 1859 ]  
 
2016-02-02 Microsemi Corporation   General Edits [G.8275.2]     Q13/15  
[ 1857 ]  
 
2016-02-02 Microsemi Corporation   T-TSC-P & T-TSC-A Holdover clockClass [G.8275.2]     Q13/15  
[ 1855 ]  
 
2016-02-02 Microsemi Corporation   T-TSC-P & T-TSC-A clockClass [G.8275.2]     Q13/15  
[ 1854 ]  
 
2016-02-02 Microsemi Corporation   interfaceBitPeriod of Interface Rate TLV [G.8275.2]     Q13/15  
[ 1853 ]  
 
2016-02-02 Microsemi Corporation   Static Unicast Permitted [G.8275.2]     Q13/15  
[ 1852 ]  
 
2016-02-02 Microsemi Corporation   Note on masterOnly & UMT [G.8275.2]     Q13/15  
[ 1851 ]  
 
2016-02-02 Microsemi Corporation   Interface Rate TLV an Optional Annex [G.8275.2]     Q13/15  
[ 1850 ]  
 
2016-02-02 Microsemi Corporation   Deny Service Requests [G.8275.2]     Q13/15  
[ 1848 ]  
 
2016-02-02 Microsemi Corporation   Path Trace as Optional Annex [G.8275.1]     Q13/15  
[ 1847 ]  
 
2016-02-02 Microsemi Corporation   Max Steps Removed an Optional Annex [G.8275.1]     Q13/15  
[ 1846 ]  
 
2016-02-02 Microsemi Corporation   General edits to Amd [G.8275.1]     Q13/15  
[ 1845 ]  
 
2016-02-02 Microsemi Corporation   Indicating Acquiring state or Synchronization Certain [G.8275.1, G.8275.2]     Q13/15  
[ 1843 ]  
 
2016-02-02 Microsemi Corporation   Merging T-TSC-A, T-BC-P & T-TSC-P Model [G.8273.4]     Q13/15  
[ 1842 ]  
 
2016-02-02 Microsemi Corporation   Static Unicast Permitted [G.8265.1]     Q13/15  
[ 1841 ]  
 
2016-02-02 Microsemi Corporation   Parameter C Exceptions [G.8262.1]     Q13/15  
[ 1829 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   GPON Time Error Transfer performance and interface mapping     Q13/15  
[ 1828 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   Transport / Access Time Phase HRM     Q13/15  
[ 1827 ]  
 
2016-02-02 China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , Orange   Transmission of non-G.8275.1 PTP messages     Q13/15  
Results:474 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-9-27