International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:474 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  [ Questions: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 2118 ]  
 
2016-09-06 ADVA Optical Networking , Orange   Additional table for phase/time requirements for cluster-based synchronization (G.8271).     Q13/15  
[ 2117 ]  
 
2016-09-06 Huawei Technologies Co., Ltd. , Orange   Interoperability between EEC and eEEC (G.8262.1 and G.8262 clocks).     Q13/15  
[ 2116 ]  
 
2016-09-06 Huawei Technologies Co., Ltd. , Orange   HRMs for cluster-based synchronization (G.8271.1).     Q13/15  
[ 2115 ]  
 
2016-09-06 Orange   Use case for G.8271.2     Q13/15  
[ 2114 ]  
 
2016-09-06 Orange   Preliminary fronthaul requirements for 5G.     Q13/15  
[ 2110 ]  
(Rev.1) 
2016-09-06 ZTE Corporation   Transport synchronization message in FlexO interface     Q13/15, Q11/15  
[ 2104 ]  
 
2016-09-06 NEC Corporation   Consideration on holdover state for T-BC     Q13/15  
[ 2103 ]  
 
2016-09-06 Microsemi Corporation   G.8272.1 edits     Q13/15  
[ 2102 ]  
 
2016-09-06 Microsemi Corporation   G.8272.1 Appendix D     Q13/15  
[ 2101 ]  
 
2016-09-06 Microsemi Corporation   G.8272.1 autonomous primary reference clock performance requirements     Q13/15  
[ 2099 ]  
(Rev.1) 
2016-09-06 China Mobile Communications Corporation   Analysis of the synchronization requirements of 5G and suggestion on new network reference model     Q13/15  
[ 2090 ]  
 
2016-09-06 ZTE Corporation   Attributes for SyncE extended SSM     Q14/15, Q13/15  
[ 2088 ]  
(Rev.1) 
2016-09-06 ZTE Corporation   Synchronization OAM     Q14/15, Q13/15  
[ 2081 ]  
 
2016-09-06 Huawei Technologies Co., Ltd. , Orange   APTS network limit of G.8271.2 and noise generation of G.8273.4     Q13/15  
[ 2079 ]  
 
2016-09-06 Huawei Technologies Co., Ltd. , Orange   Proposals for G.8266 clock with GNSS receiver and G.8272.1 scope     Q13/15  
[ 2077 ]  
 
2016-09-06 Huawei Technologies Co., Ltd. , Orange   SyncE clock ID of G.8264     Q13/15  
[ 2075 ]  
 
2016-09-06 Huawei Technologies Co., Ltd.   Sub-Nyquist Artefacts and Sampling Moiré Effects when Measuring PTP to PTP and PTP to 1 PPS Noise Transfer (G.8272.3, G.supp)     Q13/15  
[ 2074 ]  
 
2016-09-06 Huawei Technologies Co., Ltd.   Proposed notes for 7.3.1/G.8273.2 (PTP to PTP noise transfer) and C.2.3.1/G.8273.2 (PTP to 1PPS noise transfer)     Q13/15  
[ 2073 ]  
 
2016-09-06 Huawei Technologies Co., Ltd.   Miscellaneous Proposals for Revised Recommendation G.781     Q13/15  
[ 2072 ]  
 
2016-09-06 Huawei Technologies Co., Ltd.   Initial Simulation Results for Wander Accumulation in a Chain of eEECs (G.8262.1, G.supp)     Q13/15  
[ 2071 ]  
 
2016-09-06 Huawei Technologies Co., Ltd.   G.8275.2 - Deny service     Q13/15  
[ 2070 ]  
(Rev.1) 
2016-09-06 Huawei Technologies Co., Ltd.   Same path of SyncE frequency and PTP time     Q13/15  
[ 2068 ]  
 
2016-09-06 Huawei Technologies Co., Ltd.   Short-term phase transient and phase discontinuity of G.8266     Q13/15  
[ 2067 ]  
 
2016-09-06 Huawei Technologies Co., Ltd.   Wide-Band Jitter Accumulation Simulation Results for Transport of Higher-Rate Ethernet Clients over B100G OTN based on Multiple Replications     Q13/15  
[ 2054 ]  
 
2016-09-05 China Unicom   Proposal on new specifications of PRTC in G.8272     Q13/15  
[ 2051 ]  
 
2016-09-05 China Unicom   Proposal on "position maintenance" work pattern of PRTC GNSS receiver     Q13/15  
[ 2050 ]  
 
2016-09-05 China Unicom   1588 network performance monitoring mechanism     Q13/15  
[ 2042 ]  
 
2016-09-05 Cisco Systems, Inc.   Leap second behaviour on PTP clocks [G.8265.1, G.8275.1, G8275.2]     Q13/15  
[ 2034 ]  
 
2016-09-05 KDDI Corporation , Nippon Telegraph and Telephone Corporation (NTT)   Proposal of maintenance of G.781 Option III     Q13/15  
[ 2033 ]  
 
2016-09-05 Nippon Telegraph and Telephone Corporation (NTT)   Proposal of frequency and time holdover alarms (Sync OAM)     Q13/15  
[ 2032 ]  
 
2016-09-05 Nippon Telegraph and Telephone Corporation (NTT)   Proposal of monitoring methods for PTP backup path (Sync OAM)     Q13/15  
[ 1999 ]  
 
2016-09-05 Qulsar, Inc.   PDV Templates for Testing Partial Timing Support     Q13/15  
[ 1977 ]  
 
2016-09-04 RAD Data Communications, Ltd.   TC Noise Model Analysis     Q13/15  
[ 1976 ]  
+Corr.1 
2016-09-04 RAD Data Communications, Ltd.   Removing Unnecessary Sections in G.8273.3     Q13/15  
[ 1975 ]  
+Corr.1 
2016-09-04 RAD Data Communications, Ltd.   G.8261 Editorial Comments     Q13/15  
[ 1974 ]  
 
2016-09-04 RAD Data Communications, Ltd.   Testing G.8261 Scenarios against G.8271.2 Network Limits     Q13/15  
[ 1971 ]  
 
2016-09-03 Deutsche Telekom AG   Reference switching and eEEC specification (Part 2)     Q13/15  
[ 1966 ]  
 
2016-09-03 Microsemi Corporation   Proposed modifications to draft G.709.1 for PTP over FlexO OSMC     Q13/15, Q11/15  
[ 1954 ]  
 
2016-09-02 ZTE Corporation   Synchronization management model, comments on TD549/WP3 Rev.1     Q14/15, Q13/15  
[ 1937 ]  
 
2016-09-02 Telefon AB - LM Ericsson   Considerations on sync in fronthaul     Q13/15  
[ 1936 ]  
 
2016-09-02 Telefon AB - LM Ericsson   SyncE Master ID (G.8264)     Q13/15  
[ 1935 ]  
 
2016-09-02 Telefon AB - LM Ericsson   T-TSC Physical layer frequency to PTP noise transfer specification (G.8273.2)     Q13/15  
[ 1934 ]  
 
2016-09-02 Telefon AB - LM Ericsson   Enhanced SyncE Network Limits (G.8261) and Clock (G.8262.1)     Q13/15  
[ 1899 ]  
 
2016-08-31 Ciena Canada   Response on redundant model in TD549     Q13/15  
[ 1898 ]  
 
2016-08-31 Ciena Canada   G.8263 Amd. 2 - Typos     Q13/15  
[ 1896 ]  
(Rev.1) 
2016-08-31 Ciena Canada   G.8262.1 short term phase transient response for parameter C     Q13/15  
[ 1892 ]  
 
2016-08-31 Integrated Device Technology (IDT)   G.8275.2 - Deny of service requests     Q13/15  
[ 1891 ]  
(Rev.1) 
2016-08-31 Integrated Device Technology (IDT)   G.8275.1 T-BC phase/time traceability information     Q13/15  
[ 1886 ]  
 
2016-08-31 Qulsar, Inc.   Regarding Packet-Based Clock Model in G.8273.4     Q13/15  
[ 1885 ]  
 
2016-08-31 Qulsar, Inc.   Regarding Functional Model in G.8273.4     Q13/15  
Results:474 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-10-1