International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:474 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  [ Questions: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1717 ]  
 
2016-02-01 Microsemi Corporation   Transporting CPRI Options 8-10 over OTN     Q13/15, Q11/15  
[ 1678 ]  
 
2016-02-01 ZTE Corporation   Information model for the NE synchronization functions     Q14/15, Q13/15  
[ 1677 ]  
 
2016-02-01 Calnex Solutions Limited , Nokia Solutions and Networks GmbH & Co. KG   G.8260: Difference between Two-Way Offset and Two-Way Time Error     Q13/15  
[ 1676 ]  
 
2016-02-01 Calnex Solutions Limited   G.8271: Editorial corrections     Q13/15  
[ 1675 ]  
 
2016-02-01 Calnex Solutions Limited , Coriant GmbH & Co. KG , Nokia Solutions and Networks GmbH & Co. KG   G.8275.1: T-TSC clockClass and holdover     Q13/15  
[ 1654 ]  
 
2016-02-01 China Mobile Communications Corporation   Proposal on synchronization information model     Q14/15, Q13/15  
[ 1653 ]  
 
2016-02-01 Nippon Telegraph and Telephone Corporation (NTT)   Method of time variation detection in T-BC (G.8273.2)     Q13/15  
[ 1652 ]  
 
2016-02-01 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   The planning and monitoring of the synchronization paths     Q13/15  
[ 1651 ]  
 
2016-02-01 Nippon Telegraph and Telephone Corporation (NTT)   ePRTC and T-GM function model (G.8272.1)     Q13/15  
[ 1650 ]  
 
2016-02-01 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Measurement methods of message delay time for time synchronization     Q13/15  
[ 1649 ]  
(Rev.1) 
2016-02-01 Nippon Telegraph and Telephone Corporation (NTT)   Transporting CPRI clients with different clock sources  
C-1649 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
Q13/15, Q11/15  
[ 1648 ]  
 
2016-02-01 China Mobile Communications Corporation   Proposal to include time synchronization defects and performance monitoring functions in G.781.1     Q13/15  
[ 1647 ]  
 
2016-02-01 China Mobile Communications Corporation   Proposal to include frequency synchronization defects and performance monitoring functions in G.781     Q13/15  
[ 1646 ]  
 
2016-02-01 China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Considerations on the selection of ePRTC/PRTC T-GMs by alternate BMCA     Q13/15  
[ 1645 ]  
 
2016-02-01 Huawei Technologies Co., Ltd. , Telefon AB - LM Ericsson   Addressing Editor's note in G.8264     Q13/15  
[ 1642 ]  
 
2016-02-01 Microsemi Corporation , Telefon AB - LM Ericsson   Editing improvements in G.8275.2 clause 6.7.5, Clock attribute clockAccuracy     Q13/15  
[ 1640 ]  
 
2016-02-01 Telefon AB - LM Ericsson   Improving performance in Partial Timing Support     Q13/15  
[ 1639 ]  
 
2016-02-01 Telefon AB - LM Ericsson   Comments on latest draft of G.8275.2 (and G.8265.1)     Q13/15  
[ 1637 ]  
 
2016-02-01 Telefon AB - LM Ericsson   Clarifications on T-TSC in G.8275.1     Q13/15  
[ 1636 ]  
 
2016-02-01 Telefon AB - LM Ericsson   Clarification on requirements in G.8271     Q13/15  
[ 1634 ]  
 
2016-02-01 Telefon AB - LM Ericsson   Comments on latest draft of G.8271     Q13/15  
[ 1633 ]  
 
2016-02-01 China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Proposal to indicate the type of ePRTC/PRTC in the PTP messages     Q13/15  
[ 1620 ]  
 
2016-02-01 China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Performance monitoring in Sync OAM     Q13/15  
[ 1615 ]  
(Rev.1) 
2016-02-01 ZTE Corporation   Consideration and proposal on PTP event message in FlexO IrDI  
C-1615 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
Q13/15, Q11/15  
[ 1611 ]  
(Rev.1) 
2016-02-01 IP Light   Frequency error test results - CPRI over ODU2r  
C-1611 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
Q13/15, Q11/15  
[ 1592 ]  
(Rev.1-2) 
2016-02-01 Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation   Propose SG15 to start pre-research project on IMT2020 Mobile back haul and front haul network     Q6/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15  
[ 1553 ]  
 
2016-01-29 Microsemi Corporation   RMS Frequency Offset of CPRI Clients Asynchronously Mapped to and Demapped from OTN     Q13/15, Q11/15  
[ 1552 ]  
 
2016-01-29 Microsemi Corporation   PTP Timestamping on Multilane OTN Interfaces     Q13/15, Q11/15  
[ 1543 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 Functional Model     Q13/15  
[ 1542 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 Clause 9     Q13/15  
[ 1541 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 Clause 8.2     Q13/15  
[ 1540 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 Clause 6.3.1     Q13/15  
[ 1539 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 Clause 6.2     Q13/15  
[ 1538 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 Clause 6.1     Q13/15  
[ 1537 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 Clause 6     Q13/15  
[ 1536 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 scope     Q13/15  
[ 1535 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8275.2 Support interoperability with equipment deployed per ITU-T G.8265.1     Q13/15  
[ 1534 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8275.2 Table 1     Q13/15  
[ 1533 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8275.2 data set members     Q13/15  
[ 1532 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8275.1 twoStepFlag range for a Telecom Time Slave Clock     Q13/15  
[ 1531 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8265.1 twoStepFlag range for a Slave only clock     Q13/15  
[ 1523 ]  
 
2016-01-22 Orange   Follow-up on G.8275.2: Requirement for an Accurate T3 Value     Q13/15  
[ 1522 ]  
 
2016-01-22 Orange   Summary on G.8266 for finalization.     Q13/15  
[ 1521 ]  
 
2016-01-22 Huawei Technologies Co., Ltd. , Orange , Telefon AB - LM Ericsson   Clarification on the timing accuracy specification for the 1PPS measurement interface     Q13/15, Q11/15  
[ 1520 ]  
 
2016-01-22 Orange   Editorial on ToD from the contribution WDPisa32     Q13/15  
[ 1519 ]  
 
2016-01-22 Huawei Technologies Co., Ltd. , Orange   Phase/time synchronization over Microwave networks     Q13/15  
[ 1518 ]  
 
2016-01-22 Orange   Additional information on frequencyTraceable Flag of G.8275.1     Q13/15  
[ 1517 ]  
 
2016-01-22 China Unicom , Huawei Technologies Co., Ltd. , Orange   Text modification under section 6.4 of G.8275.1     Q13/15  
[ 1516 ]  
 
2016-01-22 Orange   PTP interfaces requirements for G.8266     Q13/15  
[ 1515 ]  
 
2016-01-22 Orange   Proposal to study Synchronization over Ethernet in the Fronthaul (G.8271)     Q13/15  
Results:474 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-9-28