International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:98 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
Contributions  [ Questions: Q12/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1454 ]  
 
2015-06-09 Alcatel-Lucent International , Alcatel-Lucent USA Inc. , Cisco Systems, Inc. , Deutsche Telekom AG   Optical Power Monitors for the G.698.2 Application in Support of Access Link Power Monitoring and Power Control     Q6/15, Q14/15, Q12/15  
[ 1449 ]  
 
2015-06-09 Coriant GmbH & Co. KG   Comments on draft G.asdtn (TD 318)     Q14/15, Q12/15  
[ 1434 ]  
 
2015-06-09 Electronics and Telecommunications Research Institute (ETRI) , Coriant GmbH & Co. KG , FiberHome Technologies Group , SK Telecom   New term and update of availability enhancement techniques     Q14/15, Q12/15  
[ 1428 ]  
 
2015-06-09 Nippon Telegraph and Telephone Corporation (NTT)   Proposal of update for multi-layer control aspects in G.asdtn     Q14/15, Q12/15  
[ 1426 ]  
 
2015-06-09 FiberHome Technologies Group   Discussion of the protection types that can be supported by controller based protection in SDTN     Q14/15, Q12/15  
[ 1409 ]  
 
2015-06-09 China Mobile Communications Corporation   Consideration of Network virtualization in G.asdtn     Q14/15, Q12/15  
[ 1406 ]  
 
2015-06-09 China Mobile Communications Corporation   Transport Resource Allocation     Q12/15  
[ 1381 ]  
 
2015-06-09 China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT)   Proposal on synchronization information model     Q14/15, Q13/15, Q12/15  
[ 1373 ]  
 
2015-06-09 Alcatel-Lucent Shanghai Bell   CC calling on HCC     Q12/15  
[ 1360 ]  
 
2015-06-09 Alcatel-Lucent Shanghai Bell   Considerations re management of SDN control  
No file provided
 
Q14/15, Q12/15  
[ 1329 ]  
 
2015-06-08 China Mobile Communications Corporation , FiberHome Technologies Group   Consideration of network management in SDN     Q14/15, Q12/15  
[ 1317 ]  
 
2015-06-08 Huawei Technologies Co., Ltd.   Considerations on Centralized Recovery     Q9/15, Q14/15, Q12/15  
[ 1301 ]  
 
2015-06-08 Xtera Communications, Inc.   SDN Approach for Optical Networks     Q14/15, Q12/15  
[ 1300 ]  
 
2015-06-08 FiberHome Technologies Group   Proposals to architecture components classification and clarification of G.800     Q12/15  
[ 1296 ]  
 
2015-06-08 FiberHome Technologies Group   Functional requirements for SDN CPI and M-CPI in G.asdtn     Q14/15, Q12/15  
[ 1241 ]  
 
2015-06-08 Ministry of Industry and Information Technology (MIIT)   Proposals to clause 11 about the management aspects of controller in G.asdtn     Q14/15, Q12/15  
[ 1240 ]  
 
2015-06-08 Ministry of Industry and Information Technology (MIIT)   Proposals on clause 8.4 of G.asdtn about control components interactions sequence arrangement     Q12/15  
[ 1239 ]  
(Rev.1-2) 
2015-06-08 Ministry of Industry and Information Technology (MIIT)   Proposals to Clause 8.3 of G.asdtn     Q14/15, Q12/15  
[ 1211 ]  
 
2015-06-05 ZTE Corporation   Alarm processing in G.asdtn and G.gim     Q14/15, Q12/15  
[ 1188 ]  
 
2015-06-03 Ciena Canada   G.asdtn - NCC interactions     Q14/15, Q12/15  
[ 1187 ]  
 
2015-06-03 Ciena Canada   G.cca - Identifiers clause     Q14/15, Q12/15  
[ 1186 ]  
 
2015-06-03 Ciena Canada   G.cca - Connection Controller Component     Q14/15, Q12/15  
[ 1183 ]  
 
2015-06-03 Altera Newfoundland Technology Centre (Altera NTC)   ETYn_AI versus PCS coding inconsistency in G.8021     Q12/15, Q11/15, Q10/15  
[ 1177 ]  
(Rev.1) 
2015-06-03 Orange , Telefónica, S.A. , Verizon Communication Corporation , ZTE Corporation   Packet OAM in SLPS Networks     Q12/15  
[ 1176 ]  
(Rev.1) 
2015-06-03 Orange , Portugal Telecom , Telefónica, S.A. , Verizon Communication Corporation , ZTE Corporation   Re-ordering in SLPS Networks     Q12/15  
Results:98 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2015-7-7