International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:301 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  [ Questions: Q11/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1926 ]  
 
2016-09-02 Fujitsu Limited   Interface definition for OTN     Q12/15, Q11/15  
[ 1923 ]  
 
2016-09-02 KDDI Corporation   Consideration on IaDI FlexO     Q11/15  
[ 1918 ]  
 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Proposal to start a new project to specify CPRI over OTN phase 2     Q11/15  
[ 1917 ]  
(Rev.1-2) 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd. , Intel Corporation , IP Light , Xilinx Incorporation   CPRI over OTN phase II extension     Q11/15  
[ 1915 ]  
 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   100G/B100G multi-vendor FlexO based SOTUm interface family     Q11/15  
[ 1914 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Proposed corrections to Table 8-1/G.874 and 7-1/G.806     Q14/15, Q11/15  
[ 1913 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   OTN connections and protected connections     Q9/15, Q12/15, Q11/15  
[ 1912 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Atomic function specification text proposal of FlexE     Q11/15, Q10/15  
[ 1911 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   FlexE and xGE interoperability update     Q11/15  
[ 1910 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Atomic function specification text proposal of the interworking between ETCx and ETCflex     Q11/15  
[ 1909 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Atomic function specification text proposal of mapping a 64b/66b PCS coded signal into OPUflex     Q11/15  
[ 1908 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   ETC Naming Proposal     Q11/15, Q10/15  
[ 1907 ]  
 
2016-09-01 Huawei Technologies Co., Ltd.   Comments on the open issues with the ETY_TT description in G.8021     Q11/15, Q10/15  
[ 1903 ]  
 
2016-08-31 Coriant GmbH & Co. KG   Proposed appendix to G.798 related to media layer protection     Q11/15  
[ 1901 ]  
 
2016-08-31 Coriant GmbH & Co. KG   Modelling media layer protection using the new G.872 model     Q9/15, Q12/15, Q11/15  
[ 1877 ]  
 
2016-08-30 Ciena Canada   FlexO IaDI and G.709.2     Q12/15, Q11/15  
[ 1876 ]  
 
2016-08-30 Ciena Canada   CPRI over OTN start of new recommendation     Q11/15  
[ 1875 ]  
 
2016-08-30 Ciena Canada   OTUCn/ODUCn GCC considerations for parallel implementations     Q11/15  
[ 1862 ]  
 
2016-02-02 Microsemi Corporation   Comment on the packet mapping text in draft G.709 clause 17.10     Q11/15  
[ 1860 ]  
 
2016-02-02 Inphi Corporation   FlexE Aware mapping justification encoding for method 6B     Q11/15  
[ 1837 ]  
 
2016-02-02 Microsemi Corporation   Proposed definition and text for ODUCn GMP ?CnD CRC-9 overhead in G.709     Q11/15  
[ 1826 ]  
 
2016-02-02 Huawei Technologies Co., Ltd. , China Mobile Communications Corporation , Orange   Extended SSM message of OTN     Q13/15, Q11/15  
[ 1823 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   New Simulation Results for RMS Frequency Offset for Transport of a CPRI Client over OTN     Q13/15, Q11/15  
[ 1822 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN - Computational Considerations     Q13/15, Q11/15  
[ 1821 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   Consideration of CPRI clock transport over OTN     Q13/15, Q11/15  
[ 1796 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   Considerations on the evolution of Module Framer and DSP Framer Interfaces (MFI/DFI)     Q11/15  
[ 1794 ]  
 
2016-02-02 China Unicom , Huawei Technologies Co., Ltd.   Cascaded and nested protection     Q9/15, Q11/15  
[ 1747 ]  
 
2016-02-02 Microsemi Corporation   Heterogeneous CPRI multiplexing using GFP     Q13/15, Q11/15  
[ 1746 ]  
 
2016-02-02 Microsemi Corporation   Recommendation for Mapping a FlexE Sub-Group into an ODUflex     Q13/15, Q11/15  
[ 1734 ]  
 
2016-02-02 Inphi Corporation   FlexO frame & sub-frame alignment and markers     Q11/15  
[ 1731 ]  
 
2016-02-02 Inphi Corporation   400GBASE-R mapping into OPUflex     Q11/15  
[ 1724 ]  
 
2016-02-01 Coriant GmbH & Co. KG , Microsemi Corporation   Using Standard GFP-T to map CPRI clients into an ODU Carrier - Proposed addition to the draft CPRI-over-OTN Supplement     Q13/15, Q11/15  
[ 1717 ]  
 
2016-02-01 Microsemi Corporation   Transporting CPRI Options 8-10 over OTN     Q13/15, Q11/15  
[ 1674 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   Comment on draft G.872 Edition 4     Q12/15, Q11/15  
[ 1673 ]  
 
2016-02-01 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   FlexO atomic functional model     Q11/15  
[ 1671 ]  
 
2016-02-01 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Considerations of interconnection between FlexE and xGE     Q11/15  
[ 1670 ]  
(Rev.1-2) 
2016-02-01 Huawei Technologies Co., Ltd.   FlexE aware mapping method 6B text proposal     Q11/15  
[ 1669 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   FlexE into ODUflex atomic functional model     Q11/15  
[ 1667 ]  
 
2016-02-01 Fujitsu Limited   Consideration and proposed text on block definition for error performance     Q11/15  
[ 1666 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   FlexE atomic functional model     Q11/15, Q10/15  
[ 1665 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   Introduction of FlexE related atomic functions and Characteristic Information naming     Q11/15, Q10/15  
[ 1657 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   Proposal to specify Module Framer Interfaces and DSP Framer Interfaces in a new G.709 supplement     Q11/15  
[ 1649 ]  
(Rev.1) 
2016-02-01 Nippon Telegraph and Telephone Corporation (NTT)   Transporting CPRI clients with different clock sources  
C-1649 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
Q13/15, Q11/15  
[ 1628 ]  
 
2016-02-01 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Proposal to study OTN data plane pruning and refactoring     Q11/15  
[ 1627 ]  
 
2016-02-01 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   CPRI over OTN phase 2 extension     Q11/15  
[ 1626 ]  
 
2016-02-01 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Transparency of mapping of CPRI into OTN phase 2     Q11/15  
[ 1624 ]  
 
2016-02-01 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   CPRI over OTN phase 2 application update     Q11/15  
[ 1615 ]  
(Rev.1) 
2016-02-01 ZTE Corporation   Consideration and proposal on PTP event message in FlexO IrDI  
C-1615 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
Q13/15, Q11/15  
[ 1614 ]  
 
2016-02-01 ZTE Corporation   Consideration and proposal on overhead format of FlexO     Q11/15  
[ 1612 ]  
 
2016-02-01 ZTE Corporation   Considerations on overhead of FlexE aware client mapping method     Q11/15  
Results:301 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-9-27