International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:119 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  [ Questions: Q10/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1711 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   Proposed text changes for the ETY_TT and ETY/ETH_A description     Q10/15  
[ 1710 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   Comments on draft text G.8121     Q10/15  
[ 1709 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   Comments on draft text G.8121.1     Q10/15  
[ 1708 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   Comments on draft text G.8113.1     Q10/15  
[ 1666 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   FlexE atomic functional model     Q11/15, Q10/15  
[ 1665 ]  
 
2016-02-01 Huawei Technologies Co., Ltd.   Introduction of FlexE related atomic functions and Characteristic Information naming     Q11/15, Q10/15  
[ 1644 ]  
(Rev.1) 
2016-02-01 NEC Corporation   Comments on the YANG data model for Ethernet Ring Protection     Q14/15, Q10/15  
[ 1631 ]  
 
2016-02-01 China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation   Proposal to study MPLS-TP service information model pruning and refactoring     Q14/15, Q10/15  
[ 1603 ]  
(Rev.1) 
2016-02-01 FiberHome Technologies Group   The requirement of Yang module in MPLS-TP  
C-1603 Rev.1 adds Q14/15 as a destination Question. There is no change to the content of the Contribution.
 
Q14/15, Q10/15  
[ 1592 ]  
(Rev.1-2) 
2016-02-01 Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation   Propose SG15 to start pre-research project on IMT2020 Mobile back haul and front haul network     Q6/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15  
[ 1587 ]  
 
2016-02-01 Fujitsu Limited   Counter processes text for G.8121.1     Q10/15  
[ 1586 ]  
 
2016-02-01 Fujitsu Limited   Comments on G.8121     Q10/15  
[ 1585 ]  
 
2016-02-01 Fujitsu Limited   Terminology for traffic shaping function     Q3/15, Q14/15, Q10/15  
[ 1477 ]  
 
2015-06-09 Alcatel-Lucent USA Inc.   Use of SDL in Q10/15 Recommendations     Q10/15  
[ 1470 ]  
 
2015-06-09 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Review comments on draft G.8113.1     Q10/15  
[ 1442 ]  
 
2015-06-09 Alcatel-Lucent USA Inc. , China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Default Protection Switching Type for MPLS-TP linear protection     Q9/15, Q14/15, Q10/15  
[ 1441 ]  
 
2015-06-09 Huawei Technologies Co., Ltd.   Review comments on draft G.8013     Q10/15  
[ 1439 ]  
 
2015-06-09 Huawei Technologies Co., Ltd.   Comments about cFOP for ring protection in G.8021     Q9/15, Q10/15  
[ 1436 ]  
 
2015-06-09 Alcatel-Lucent USA Inc. , Huawei Technologies Co., Ltd.   Proposed updates to the Server MEP definition in G.8001     Q3/15, Q10/15  
[ 1419 ]  
 
2015-06-09 ZTE Corporation   SD Requirements for MPLS-TP     Q10/15  
[ 1410 ]  
 
2015-06-09 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Comments on protection switching description in G.8121     Q9/15, Q14/15, Q10/15  
[ 1386 ]  
 
2015-06-09 FiberHome Technologies Group   Consideration of MCC in G.8021     Q10/15  
[ 1281 ]  
 
2015-06-08 Korea (Rep. of)   Comments on G.8121     Q10/15  
[ 1237 ]  
 
2015-06-08 Fujitsu Limited   Consideration on OAM PDU Generation/Reception process in G.8121     Q14/15, Q10/15  
[ 1236 ]  
 
2015-06-08 Fujitsu Limited   Proposed clause 8.8.6 (Proactive DM) for G.8121.1     Q10/15  
[ 1235 ]  
 
2015-06-08 Fujitsu Limited   Proposed clause 8.8.4 and 8.8.5 (Proactive and on-demand LM) for G.8121.1     Q10/15  
[ 1234 ]  
 
2015-06-08 Fujitsu Limited   Proposed solution to Living List SP#28 (LL and SAT PDU) in G.8013/Y.1731     Q10/15  
[ 1233 ]  
 
2015-06-08 Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation   Proposals to G.8113.1 on adding new OAM functions and mechanism for Bandwidth Notification and Expected Defect     Q10/15  
[ 1183 ]  
 
2015-06-03 Altera Newfoundland Technology Centre (Altera NTC)   ETYn_AI versus PCS coding inconsistency in G.8021     Q12/15, Q11/15, Q10/15  
[ 1148 ]  
 
2014-11-11 Alcatel-Lucent USA Inc.   Proposal to use VSM for Bandwidth Notification     Q10/15  
[ 1077 ]  
 
2014-11-11 Cisco Systems, Inc.   Clarification regarding G.8121 series Study Point 12     Q14/15, Q10/15  
[ 1074 ]  
 
2014-11-11 Cisco Systems, Inc.   Clarifications for G.8121 series Study Point 10     Q14/15, Q10/15  
[ 1072 ]  
 
2014-11-11 Cisco Systems, Inc.   Editorial Issues in Gsup.ethpm     Q14/15, Q10/15  
[ 1071 ]  
 
2014-11-11 Cisco Systems, Inc.   Additional content for Gsup.ethpm     Q14/15, Q10/15  
[ 1070 ]  
 
2014-11-11 Cisco Systems, Inc.   Structure of Gsup.ethpm     Q14/15, Q10/15  
[ 1069 ]  
 
2014-11-11 Cisco Systems, Inc.   Clarifications on Expected Defects in G.8021     Q10/15  
[ 1068 ]  
 
2014-11-11 Cisco Systems, Inc.   Clarifications on Bandwidth Notifications in G.8021     Q10/15  
[ 1067 ]  
 
2014-11-11 Cisco Systems, Inc.   Editorial corrections in G.8013 clause 2     Q10/15  
[ 1066 ]  
 
2014-11-11 Cisco Systems, Inc.   Use of MCC for EDM PDUs     Q10/15  
[ 1065 ]  
 
2014-11-11 Cisco Systems, Inc.   Adding reference to MEF46 in G.8013     Q10/15  
[ 1064 ]  
 
2014-11-11 Cisco Systems, Inc.   Status of references to MEF IAs in G.8011     Q10/15  
[ 1060 ]  
 
2014-11-11 Huawei Technologies Co. Ltd.   Editorial Comments to the current text for BNM in draft G.8021     Q10/15  
[ 1058 ]  
 
2014-11-11 Huawei Technologies Co. Ltd.   Editorial Comments to the current text for BNM in draft G.8013     Q10/15  
[ 1057 ]  
 
2014-11-11 Huawei Technologies Co. Ltd.   Support of the DiffServ Uniform Model in G.8121     Q10/15  
[ 1056 ]  
 
2014-11-11 Huawei Technologies Co. Ltd.   Need for P/CoS information for 1DM Sink processing in G.8021 and G.8121     Q14/15, Q10/15  
[ 1055 ]  
 
2014-11-11 Huawei Technologies Co. Ltd.   Editorial Comments to MEP compound functions notes in G.8121, G.8152, G.8021 and G.8052     Q14/15, Q10/15  
[ 1054 ]  
 
2014-11-11 Huawei Technologies Co. Ltd.   Comments about dFOP and cFOP definitions in G.8121 and G.8021     Q10/15  
[ 975 ]  
 
2014-11-10 NEC Corporation   Proposed text for Expected Defect Process in G.8021     Q10/15  
[ 974 ]  
 
2014-11-10 NEC Corporation   Referencing method of MEF documents in G.8011v4     Q10/15  
[ 927 ]  
 
2014-11-10 China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal on Sync Management and OAM     Q14/15, Q13/15, Q10/15  
Results:119 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-6-25