International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:2210 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 1538 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 Clause 6.1     Q13/15  
[ 1537 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 Clause 6     Q13/15  
[ 1536 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8272.1 scope     Q13/15  
[ 1535 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8275.2 Support interoperability with equipment deployed per ITU-T G.8265.1     Q13/15  
[ 1534 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8275.2 Table 1     Q13/15  
[ 1533 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8275.2 data set members     Q13/15  
[ 1532 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8275.1 twoStepFlag range for a Telecom Time Slave Clock     Q13/15  
[ 1531 ]  
 
2016-01-28 Integrated Device Technology (IDT)   G.8265.1 twoStepFlag range for a Slave only clock     Q13/15  
[ 1530 ]  
 
2016-01-28 KDDI Corporation   Considerations on new Ethernet signals over OTN     Q11/15  
[ 1529 ]  
 
2016-01-28 Telecom Italia S.p.A.   Process for contributing     Q9/15  
[ 1528 ]  
 
2016-01-27 ADVA Optical Networking   Analysis of cross gain modulation caused by pilot tones     Q6/15  
[ 1527 ]  
 
2016-01-27 Coriant GmbH & Co. KG , Keysight Technologies Deutschland GmbH   Method for Carrier Phase Recovery     Q6/15  
[ 1526 ]  
 
2016-01-27 Swisscom SA   G.fast - Need for improved reporting of EFTR     Q4/15  
[ 1525 ]  
 
2016-01-27 Nippon Telegraph and Telephone Corporation (NTT)   Proposal of Cooperation Interface enabling Low-latency Services     Q2/15  
[ 1524 ]  
 
2016-01-22 Swisscom SA   G.fast - Need for seamless reconfiguration of TARSNRM     Q4/15  
[ 1523 ]  
 
2016-01-22 Orange   Follow-up on G.8275.2: Requirement for an Accurate T3 Value     Q13/15  
[ 1522 ]  
 
2016-01-22 Orange   Summary on G.8266 for finalization.     Q13/15  
[ 1521 ]  
 
2016-01-22 Huawei Technologies Co., Ltd. , Orange , Telefon AB - LM Ericsson   Clarification on the timing accuracy specification for the 1PPS measurement interface     Q13/15, Q11/15  
[ 1520 ]  
 
2016-01-22 Orange   Editorial on ToD from the contribution WDPisa32     Q13/15  
[ 1519 ]  
 
2016-01-22 Huawei Technologies Co., Ltd. , Orange   Phase/time synchronization over Microwave networks     Q13/15  
[ 1518 ]  
 
2016-01-22 Orange   Additional information on frequencyTraceable Flag of G.8275.1     Q13/15  
[ 1517 ]  
 
2016-01-22 China Unicom , Huawei Technologies Co., Ltd. , Orange   Text modification under section 6.4 of G.8275.1     Q13/15  
[ 1516 ]  
 
2016-01-22 Orange   PTP interfaces requirements for G.8266     Q13/15  
[ 1515 ]  
 
2016-01-22 Orange   Proposal to study Synchronization over Ethernet in the Fronthaul (G.8271)     Q13/15  
[ 1514 ]  
 
2016-01-22 Orange   Functional Block diagram for ePRTC     Q13/15  
[ 1513 ]  
 
2016-01-21 N/A   Withdrawn by submitter     N/A  
[ 1512 ]  
 
2016-01-21 N/A   Withdrawn by submitter     N/A  
[ 1511 ]  
 
2016-01-21 N/A   Withdrawn by submitter     N/A  
[ 1510 ]  
 
2016-01-21 N/A   Withdrawn by submitter     N/A  
[ 1509 ]  
 
2016-01-21 N/A   Withdrawn by submitter     N/A  
[ 1508 ]  
 
2016-01-21 N/A   Withdrawn by submitter     N/A  
[ 1507 ]  
 
2016-01-21 N/A   Withdrawn by submitter     N/A  
[ 1506 ]  
(Rev.1-2) 
2016-01-20 Acacia Communications, Inc , China Telecommunications Corporation , Orange , Telecom Italia S.p.A.   Metro 100G WDM interface for optical transport networks     Q6/15  
[ 1505 ]  
 
2016-01-20 India , Ministry of Communications and Information Technology   Comments of DoT on revision of Recommendation G.652 and G.657     Q5/15  
[ 1504 ]  
 
2016-01-16 Finisar Corporation   Additional DML Measurements for the 4L1-9D1F code     Q6/15  
[ 1503 ]  
 
2016-01-16 Finisar Corporation   4L1-9D1F code - Maximum Channel Power Difference Proposal     Q6/15  
[ 1502 ]  
 
2016-01-16 Finisar Corporation   EML Measurements supporting the 4L1-9D1F application code     Q6/15  
[ 1501 ]  
(Rev.1) 
2016-01-15 Huawei Technologies Co., Ltd. , Orange , Portugal Telecom , Telefónica S.A. , Verizon Communication Corporation   Standardization of optical switching (photonic sub-lambda switching): what for?  
C-1501 Rev.1 corrects the Source information. There is no change to the content of the Contribution.
 
Q12/15  
[ 1500 ]  
(Rev.1) 
2016-01-13 Ministère de la Communication et des Technologies de l'Information, Benin   Technical Report of Optical Fibres, Cables and Systems (TR-OFCS)     Q12/15  
[ 1499 ]  
 
2015-12-10 British Telecommunications Public Ltd. Co. (BT Plc)   Release of BT cable (20 pair) NEXT measurements for use in simulations     Q4/15  
[ 1498 ]  
 
2015-06-09 Microsemi   Holdover Performance of T-BC with Physical Layer Assistance [G.8273.2]     Q13/15  
[ 1497 ]  
 
2015-06-09 Microsemi   Rewording Holdover section [G.8273.2]     Q13/15  
[ 1496 ]  
 
2015-06-09 Lantiq Beteiligungs-GmbH & Co. KG   G.dpm: Proposal for text modifications in G.dpm draft Recommendation     Q4/15  
[ 1495 ]  
 
2015-06-09 Microsemi   Noise Generation T-TC [G.8273.3]     Q13/15  
[ 1494 ]  
 
2015-06-09 Microsemi   Use of SyncE to backup GNSS [G.8275, G.8262.1]     Q13/15  
[ 1493 ]  
 
2015-06-09 Microsemi   Backup PTP Connections in Partial On-Path Support Networks [G.8275, G.8275.2]     Q13/15  
[ 1492 ]  
 
2015-06-09 Microsemi   TLV to carry timestamp interface information [G.8275.2]     Q13/15  
[ 1491 ]  
 
2015-06-09 Microsemi   Definition of 2x1Way FPP for Partial On-Path Support [G.8260, G.8271.2]     Q13/15  
[ 1490 ]  
 
2015-06-09 British Telecommunications Public Ltd. Co. (BT Plc)   Annex C in 989.2 Amd1     Q2/15  
[ 1489 ]  
 
2015-06-09 Electronics and Telecommunications Research Institute (ETRI)   Comments to G.989.3 Draft 20150601     Q2/15  
Results:2210 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-09-13