International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:1495 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 1348 ]  
 
2015-06-08 Futurewei Technologies US R&D Center   G.fast: MIMO Processing versus FEXT Cancellation     Q4/15  
[ 1347 ]  
 
2015-06-08 ZTE Corporation   Information model for the NE synchronization functions     Q14/15, Q13/15  
[ 1346 ]  
 
2015-06-08 Corning Incorporated   G.654 revision proposal incorporating a large Aeff fibre for terrestrial networks     Q5/15  
[ 1345 ]  
 
2015-06-08 Corning Incorporated   Comments and revision proposal for link design attenuation     Q5/15  
[ 1344 ]  
 
2015-06-08 Corning Incorporated   Methodology for establishing a chromatic dispersion envelope for G.652 fibres     Q5/15  
[ 1343 ]  
 
2015-06-08 Corning Incorporated , OFS Fitel, LLC   Comments and revision proposal for G.652     Q5/15  
[ 1342 ]  
 
2015-06-08 OFS Fitel, LLC   Further progress on G.657 fibre     Q5/15  
[ 1341 ]  
 
2015-06-08 OFS Fitel, LLC   Attributes for G.654 Fibre     Q5/15  
[ 1340 ]  
 
2015-06-08 Futurewei Technologies US R&D Center   G.fast: Additional retransmission parameters exchanged during initialization     Q4/15  
[ 1339 ]  
 
2015-06-08 Futurewei Technologies US R&D Center   G.fast: Test Parameter Xlin     Q4/15  
[ 1338 ]  
 
2015-06-08 Futurewei Technologies US R&D Center , Lantiq Beteiligungs-GmbH & Co. KG   G.fast: Proposed items for G.9701 corrigendum     Q4/15  
[ 1337 ]  
 
2015-06-08 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.fast (Amd 1): Proposed Active Line Noise (ALN) Definition     Q4/15  
[ 1336 ]  
(Rev.1-3) 
2015-06-08 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.fast (Amd 1): Proposed Quiet Line Noise (QLN) definition edits     Q4/15  
[ 1335 ]  
 
2015-06-08 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.fast (Amd 1): Proposed Line Attenuation (LATN) informative appendix     Q4/15  
[ 1334 ]  
 
2015-06-08 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.fast (Amd 2): A Comparison of Linear and Non-Linear Precoders     Q4/15  
[ 1333 ]  
 
2015-06-08 China Unicom   Suggestions for TOD interface     Q13/15  
[ 1332 ]  
 
2015-06-08 China Unicom   Test plan and test items for PRTC     Q13/15  
[ 1331 ]  
 
2015-06-08 China Unicom   Considerations for T-BC in G.8275.1     Q13/15  
[ 1330 ]  
 
2015-06-08 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Proposals for Revised SyncE Transient Mask for G.8273.2 and for adding SyncE Transient Test Setup Figure to G.8273     Q13/15  
[ 1329 ]  
 
2015-06-08 China Mobile Communications Corporation , FiberHome Technologies Group   Consideration of network management in SDN     Q14/15, Q12/15  
[ 1328 ]  
 
2015-06-08 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   PRTC+ simulation result     Q13/15  
[ 1327 ]  
 
2015-06-08 China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , Orange   Rationale and Proposal for New Recommendation G.781.1 on Time Synchronization Layer Functions and Model for Time Synchronization Transport     Q13/15  
[ 1326 ]  
 
2015-06-08 China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , Orange   Proposed Template for New Recommendation G.781.1 on Time Synchronization Layer Functions and Initial Summary Description of Atomic Functions     Q13/15  
[ 1325 ]  
 
2015-06-08 China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , Orange   LTE-A wireless synchronization requirements     Q13/15  
[ 1324 ]  
 
2015-06-08 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Network limit and metrics of APTS and PTS     Q13/15  
Results:1495 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2015-06-24