Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1138 ]
|
Clause 17.2: Calibration
|
Verizon Communication Corporation
,
ZTE Corporation
|
Q2/15
|
2014-11-11 |
|
[ 1137 ]
|
Revised proposal for G.695 application code C4S1 9D1F
|
Finisar Corporation
|
Q6/15
|
2014-11-11 |
|
[ 1136 ]
|
Proposed Editorial Modification to Rec. G.959.1
|
Finisar Corporation
|
Q6/15
|
2014-11-11 |
|
[ 1135 ]
|
Clause 17.4: ONU wavelength locking
|
Telecom Italia S.p.A.
,
Verizon Communication Corporation
|
Q2/15
|
2014-11-11 |
|
[ 1134 ]
|
Revised proposed parameter values for G.959.1 application code 4L1-9D1F
|
Finisar Corporation
|
Q6/15
|
2014-11-11 |
|
[ 1133 ]
|
Clause 17.1: Announcement
|
Futurewei Technologies US R&D Center
,
Verizon Communication Corporation
,
ZTE Corporation
|
Q2/15
|
2014-11-11 |
|
[ 1132 ]
|
Comments on options in the CPRI Option 7 Breakout Report
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-11-11 |
|
[ 1131 ]
|
Using GFP-T to map CPRI clients into OTU2c
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-11-11 |
|
[ 1130 ]
|
Recommendations for providing a ODUC identifier in ODUCn
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-11-11 |
|
[ 1128 ]
|
G.fast: On the low power mode link-state transitions (Amd1)
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-11-11 |
|
[ 1127 ]
|
Cesium time holdover
|
Microsemi
|
Q13/15
|
2014-11-11 |
|
[ 1126 ]
|
Standardized OTN Link Degradation Parameter for OTN Links with FEC
|
Xtera Communications, Inc.
|
Q11/15
|
2014-11-11 |
|
[ 1125 ]
|
PRTC ensemble (GNSS + Cs) architecture and technology
|
Microsemi
|
Q13/15
|
2014-11-11 |
|
[ 1124 ]
|
Downstream WNE-PSD in NGPON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-11-11 |
|
[ 1123 ]
|
PMD Parameters for Low Loss Budget ODNs
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-11-11 |
|
[ 1122 ]
|
Packet-Filtered Offset Time Error [G.8260]
|
Microsemi
|
Q13/15
|
2014-11-11 |
|
[ 1121 ]
|
8 Channel TWDM in NGPON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-11-11 |
|
[ 1120 ]
|
Combining two-way flows [G.8260]
|
Microsemi
|
Q13/15
|
2014-11-11 |
|
[ 1119 ]
|
Improving EEC
|
Vitesse Semiconductor Corporation
|
Q13/15
|
2014-11-11 |
|
[ 1117 ]
|
Structure of Appendix on Metrics [G.8260]
|
Microsemi
|
Q13/15
|
2014-11-11 |
|
[ 1116 ]
|
Upstream wavelength plan in NGPON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-11-11 |
|
[ 1115 ]
|
Partial timing support metrics in a network containing BCs, G.8260
|
Nokia Solutions and Networks Gmbh & Co. KG
|
Q13/15
|
2014-11-11 |
|
[ 1114 ]
|
Network limit for assisted partial timing support in G.8271.2
|
Nokia Solutions and Networks Gmbh & Co. KG
|
Q13/15
|
2014-11-11 |
|
[ 1113 ]
|
G.8271.2: Potential Indoor Deployment Budget
|
Calnex Solutions Limited
|
Q13/15
|
2014-11-11 |
|
[ 1112 ]
|
G.989.3 rogue scenarios as hooks for G.Sup49
|
Vodafone Group Services Ltd.
|
Q2/15
|
2014-11-11 |
|
[ 1111 ]
|
Comment on Inter-OLT duplex modes of type B protection in G.989.1Amd1
|
FiberHome Technologies Group
|
Q2/15
|
2014-11-11 |
|
[ 1110 ]
|
G.9700 Out of band noise requirements
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-11-11 |
|
[ 1109 ]
|
Comment on Intra-OLT duplex modes of type B protection in G.989.1Amd1
|
FiberHome Technologies Group
|
Q2/15
|
2014-11-11 |
|
[ 1108 ]
|
G.VDSL: Immunity of VDSL2 to out of band interference from G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-11-11 |
|
[ 1107 ]
|
G.8275.1 & G.8275.2 : Mapping between ClockClass and Quality level
|
ADVA Optical Networking
|
Q13/15
|
2014-11-11 |
|
[ 1106 ]
|
G.8275.2: Requirement for an Accurate T3 Value
|
ADVA Optical Networking
,
Calnex Solutions Limited
|
Q13/15
|
2014-11-11 |
|
[ 1105 ]
|
G.8275.2 : A-BMCA
|
ADVA Optical Networking
|
Q13/15
|
2014-11-11 |
|
[ 1103 ]
|
G.8272: PRTC Testing using GNSS Simulators
|
Calnex Solutions Limited
|
Q13/15
|
2014-11-11 |
|
[ 1102 ]
|
8271.2 : HRM & PDV Network Limits for Partial Timing Support
|
ADVA Optical Networking
|
Q13/15
|
2014-11-11 |
|
[ 1101 ]
|
G.hn: Unloaded Supported sub-carriers LFSR seeds
|
Marvell Semiconductor Inc.
|
Q18/15
|
2014-11-11 |
|
[ 1100 ]
|
Filter Architectures for wavelength-filtered ODN
|
ADVA Optical Networking
,
Coriant GmbH & Co. KG
|
Q2/15
|
2014-11-11 |
|
[ 1099 ]
|
G.hs, G.fast: Handshake tones for G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-11-11 |
|
[ 1098 ]
|
G.989.3 CT resilience and PtP ONU silent start
|
Vodafone Group Services Ltd.
|
Q2/15
|
2014-11-11 |
|
[ 1097 ]
|
G.hn: Alignment of G.9963 to the latest changes in G.9961
|
Marvell Semiconductor Inc.
|
Q18/15
|
2014-11-11 |
|
[ 1096 ]
|
G.hn: Update of the versioning and capabilities exchange mechanism
|
Marvell Semiconductor Inc.
|
Q18/15
|
2014-11-11 |
|
[ 1095 ]
|
G.9979 homework 2: Test vectors
|
Marvell Semiconductor Inc.
|
Q18/15
|
2014-11-11 |
|
[ 1094 ]
|
G.9979 LCC homework 1
|
Marvell Semiconductor Inc.
|
Q18/15
|
2014-11-11 |
|
[ 1093 ]
|
Request to consent OTUCn/ODUCn specification
No file provided
|
Deutsche Telekom AG Standardization
|
Q11/15
|
2014-11-11 |
|
[ 1092 ]
|
Proposal for simplified B100G interfaces of packet switches
No file provided
|
Deutsche Telekom AG Standardization
|
Q11/15
|
2014-11-11 |
|
[ 1091 ]
|
Proposed Annex A of Rec. A.1 for optical fibre cables for direct surface application with its Draft ITU-T Recommendation
|
Global Plan Inc.
|
Q16/15
|
2014-11-11 |
|
[ 1090 ]
|
Withdrawn
Duplicate of C-1091
|
N/A
|
|
2014-11-11 |
|
[ 1089 ]
|
FEC for B100G IrDI
|
Applied Micro Circuits Corporation (AMCC)
|
Q11/15
|
2014-11-11 |
|
[ 1088 ]
|
Transparent transport for PtP WDM to meet mobile fronthaul jitter requirements
|
ADVA Optical Networking
,
Coriant GmbH & Co. KG
|
Q2/15
|
2014-11-11 |
|
[ 1087 ]
|
Performance monitoring, supervision and defects management for PtP WDM
|
ADVA Optical Networking
,
Coriant GmbH & Co. KG
|
Q2/15
|
2014-11-11 |
|
[ 1086 ]
|
Wavelength refreshing for PtP WDM
|
ADVA Optical Networking
,
Coriant GmbH & Co. KG
|
Q2/15
|
2014-11-11 |
Results:2210 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):