International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2016-02-15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2016-02-15) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2016-02-15 to 2016-02-26

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Results:17 total items.
Contributions  [ Source: Orange ]  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1827 ]  
 
Transmission of non-G.8275.1 PTP messages     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-02-02
[ 1826 ]  
 
Extended SSM message of OTN     Huawei Technologies Co., Ltd. , China Mobile Communications Corporation , Orange   Q13/15, Q11/15   2016-02-02
[ 1814 ]  
 
Proposal precautions for the use of GNSS receivers     Orange   Q13/15   2016-02-02
[ 1813 ]  
 
Observed GPS UTC information malfunction - for information     Orange   Q13/15   2016-02-02
[ 1757 ]  
 
Clarifications and further considerations on WD16 of Pisa meeting     China Unicom , Orange   Q13/15   2016-02-02
[ 1749 ]  
 
G.8272.1 transient response     A1 Telekom Austria AG , ADVA Optical Networking , Deutsche Telekom AG , Microsemi Corporation , Orange   Q13/15   2016-02-02
[ 1748 ]  
 
G.8272.1 MTIE mask short term     A1 Telekom Austria AG , ADVA Optical Networking , Deutsche Telekom AG , Microsemi Corporation , Orange   Q13/15   2016-02-02
[ 1523 ]  
 
Follow-up on G.8275.2: Requirement for an Accurate T3 Value     Orange   Q13/15   2016-01-22
[ 1522 ]  
 
Summary on G.8266 for finalization.     Orange   Q13/15   2016-01-22
[ 1521 ]  
 
Clarification on the timing accuracy specification for the 1PPS measurement interface     Huawei Technologies Co., Ltd. , Orange , Telefon AB - LM Ericsson   Q13/15, Q11/15   2016-01-22
[ 1520 ]  
 
Editorial on ToD from the contribution WDPisa32     Orange   Q13/15   2016-01-22
[ 1519 ]  
 
Phase/time synchronization over Microwave networks     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-01-22
[ 1518 ]  
 
Additional information on frequencyTraceable Flag of G.8275.1     Orange   Q13/15   2016-01-22
[ 1517 ]  
 
Text modification under section 6.4 of G.8275.1     China Unicom , Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-01-22
[ 1516 ]  
 
PTP interfaces requirements for G.8266     Orange   Q13/15   2016-01-22
[ 1515 ]  
 
Proposal to study Synchronization over Ethernet in the Fronthaul (G.8271)     Orange   Q13/15   2016-01-22
[ 1514 ]  
 
Functional Block diagram for ePRTC     Orange   Q13/15   2016-01-22
Results:17 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-18