International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2014-03-24 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2014-03-24) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2014-03-24 to 2014-04-04

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Results:80 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 771 ]  
 
2014-03-11 Nokia Solutions and Networks Gmbh & Co. KG   Document describing migration from other PTP profiles to G.8275.1     Q13/15  
[ 770 ]  
 
2014-03-11 Nokia Solutions and Networks Gmbh & Co. KG   Updates to G.8263 Testing     Q13/15  
[ 759 ]  
 
2014-03-11 British Telecommunications Public Ltd. Co. (BT Plc)   Access budget within E2E Time/phase HRM     Q13/15  
[ 747 ]  
 
2014-03-11 Huawei Technologies Co. Ltd.   Information on Upcoming New Work on B100G OTN     Q13/15, Q11/15  
[ 737 ]  
 
2014-03-11 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures     Q13/15, Q11/15  
[ 736 ]  
 
2014-03-11 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance     Q13/15, Q11/15  
[ 735 ]  
 
2014-03-11 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal on Synchronization OAM in packet networks     Q13/15, Q10/15  
[ 734 ]  
 
2014-03-11 China   Proposal for clockClass definition     Q13/15  
[ 731 ]  
 
2014-03-11 Iometrix, Inc.   Update of the table listing the ITU-T Recommendations suitable for conformity/interoperability testing     Q13/15  
[ 730 ]  
 
2014-03-11 Iometrix, Inc.   C&I pilot project for Synchronous Ethernet technology     Q13/15  
[ 729 ]  
 
2014-03-11 Iometrix, Inc.   Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - request for unicast transmission of multiple types of PTP messages using Signaling messages     Q13/15  
[ 728 ]  
 
2014-03-11 Iometrix, Inc. , Orange   Guidance on the usage of the methods for PDV tolerance testing in G.8263     Q13/15  
[ 727 ]  
 
2014-03-11 Iometrix, Inc. , Orange   PTP GM performance specification in ITU-T     Q13/15  
[ 726 ]  
 
2014-03-11 Iometrix, Inc.   Notion of Quality Level of local clock in G.8265.1 during master selection     Q13/15  
[ 725 ]  
 
2014-03-11 Iometrix, Inc.   Review of G.8275.1 Latest Draft     Q13/15  
[ 724 ]  
 
2014-03-11 Iometrix, Inc.   Use of G.8265.1 telecom profile for Assisted Partial Timing Support     Q13/15  
[ 722 ]  
 
2014-03-11 Iometrix, Inc.   Clarification of PTP unicast communication for G.8275.1, G.8275.2 and G.8265.1 - modification of frequencyTraceable flag, timeTraceable flag, and clockClass     Q13/15  
[ 721 ]  
 
2014-03-11 Iometrix, Inc.   Comments on methods 1 and 2 for PDV tolerance testing in G.8263     Q13/15  
[ 720 ]  
 
2014-03-11 Iometrix, Inc.   Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - use of all 1's for targetPortIdentity     Q13/15  
[ 701 ]  
 
2014-03-11 ZTE Corporation , Ministry of Industry and Information Technology (MIIT)   Transparent clock model of 1588 over OTN     Q13/15, Q11/15  
[ 700 ]  
 
2014-03-11 China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Requirement of 1588 Transparent Clock function in OTN     Q13/15, Q11/15  
[ 699 ]  
 
2014-03-11 N/A   Withdrawn by submitter     Q13/15  
[ 687 ]  
 
2014-03-11 Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Consideration for 1588 over OTN by ESC     Q13/15, Q11/15  
[ 686 ]  
 
2014-03-11 Calnex Solutions Limited , China Unicom   Suggestions for time interface connection between OTN and Package Switching / Transport Network     Q13/15, Q11/15  
[ 685 ]  
 
2014-03-11 Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Test and analysis about PTP over OTN by transparent mode     Q13/15, Q11/15  
[ 680 ]  
 
2014-03-11 Ministry of Industry and Information Technology (MIIT) , China Telecommunications Corporation , China Unicom   Considerations for PTP over OTN network     Q13/15  
[ 660 ]  
 
2014-03-10 Alcatel-Lucent USA Inc.   G.8275.1: Frequency based ClockClasses for Option II and III networks     Q13/15  
[ 647 ]  
 
2014-03-10 Microsemi   PDV Templates for testing Partial-Timing Support     Q13/15  
[ 646 ]  
 
2014-03-10 Microsemi   Key Performance Indices for APTSC     Q13/15  
[ 645 ]  
 
2014-03-10 Ixia , Microsemi   Explanations regarding Time-Stability Metrics     Q13/15  
[ 644 ]  
 
2014-03-10 Ixia , Microsemi   Use of MATIE on Time Error     Q13/15  
[ 643 ]  
 
2014-03-10 Calnex Solutions Limited   G.8273.2: Measurement Appendix     Q13/15  
[ 642 ]  
 
2014-03-10 Ixia , Microsemi   Time Error Deviation (TEDEV)     Q13/15  
[ 641 ]  
 
2014-03-10 Calnex Solutions Limited   G.8273.2: Holdover     Q13/15  
[ 640 ]  
 
2014-03-10 Ixia , Microsemi   Maximum Absolute Average Time Error (MAATE)     Q13/15  
[ 639 ]  
(Rev.1) 
2014-03-10 Huawei Technologies Co. Ltd.   Synchronization over OTN network     Q13/15, Q11/15  
[ 638 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   Test error of PRTC of G.8272     Q13/15  
[ 637 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   Proposals for G.8275.1     Q13/15  
[ 636 ]  
(Rev.1) 
2014-03-10 Huawei Technologies Co. Ltd. , Orange   Effect of lower network limit on PTP slave clock     Q13/15  
[ 635 ]  
 
2014-03-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   SyncE transient measurement method for G.8273.2     Q13/15  
[ 634 ]  
 
2014-03-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Consideration of second-order filtering of T-BC for output transient due to SyncE rearrangement, plus several corrections for Appendix II/G.8273.2     Q13/15  
[ 633 ]  
 
2014-03-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Physical layer frequency to PTP noise transfer gain peaking in G.8273.2     Q13/15  
[ 632 ]  
 
2014-03-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Initial Results for Dynamic Time Error MTIE and TDEV at G.8271.1 Reference Point C     Q13/15  
[ 631 ]  
 
2014-03-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Proposal on 21 hops of G.8271.1     Q13/15  
[ 627 ]  
 
2014-03-10 Microsemi   G.8263 Appendix I - Flicker/gamma equation formatting fixes     Q13/15  
[ 626 ]  
 
2014-03-10 Microsemi   G8263 Appendix I - TDEV illustrating flicker load     Q13/15  
[ 625 ]  
 
2014-03-10 Microsemi   Two-way metric Offset Max     Q13/15  
[ 624 ]  
 
2014-03-10 Microsemi   Framework for Temperature Performance     Q13/15  
[ 609 ]  
 
2014-03-10 Deutsche Telekom AG   NE Phase/Time Synchronization Supply Management     Q14/15, Q13/15  
[ 601 ]  
 
2014-03-10 Vitesse Semiconductor Corporation   T-BC Performance with/without SyncE [G.8273.2]     Q13/15  
Results:80 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-12-4