International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2014-03-24 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2014-03-24) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2014-03-24 to 2014-04-04

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Results:337 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 627 ]  
 
2014-03-10 Microsemi   G.8263 Appendix I - Flicker/gamma equation formatting fixes     Q13/15  
[ 626 ]  
 
2014-03-10 Microsemi   G8263 Appendix I - TDEV illustrating flicker load     Q13/15  
[ 625 ]  
 
2014-03-10 Microsemi   Two-way metric Offset Max     Q13/15  
[ 624 ]  
 
2014-03-10 Microsemi   Framework for Temperature Performance     Q13/15  
[ 623 ]  
(Rev.1) 
2014-03-10 Huawei Technologies Co. Ltd.   1-stage and 2-stage Re-definition in ODU SMP     Q9/15  
[ 622 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   Message Encoding Set Update for ODU SMP     Q9/15  
[ 621 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   1-stage ODU SMP Protocol     Q9/15  
[ 620 ]  
(Rev.1) 
2014-03-10 Huawei Technologies Co. Ltd.   APS Mechanisms in ODU SMP     Q9/15  
[ 619 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   Proposed functional models in MDSP     Q9/15  
[ 618 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   Interconnection solution for Ethernet linear protection in MDSP     Q9/15  
[ 617 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   Discussion on the scope of potential G.metro Recommendation     Q6/15  
[ 616 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   Discussion on the minimum SMSR for 100G applications in G.698.2     Q6/15  
[ 615 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   Proposal of power budget update in G.973     Q8/15  
[ 614 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   G.hn: Proposal for seamless domain merging procedure     Q18/15  
[ 613 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   G.hn: Proposal for handover procedure of SC function     Q18/15  
[ 612 ]  
 
2014-03-10 Huawei Technologies Co. Ltd.   G.hn: Text proposal for SC re-establishment procedure in G.hn     Q18/15  
[ 611 ]  
 
2014-03-10 Alcatel-Lucent France   Spectral excursion for 100Gb/s DP-QPSK modulation format in G.698.2     Q6/15  
[ 610 ]  
 
2014-03-10 Deutsche Telekom AG   Draft New Recommendation G.8152: Protocol-neutral management information model for the MPLS-TP network element, version 0.08     Q14/15  
[ 609 ]  
 
2014-03-10 Deutsche Telekom AG   NE Phase/Time Synchronization Supply Management     Q14/15, Q13/15  
[ 608 ]  
 
2014-03-10 Deutsche Telekom AG   Comments to Recommendation G.8121 (11/2013)     Q14/15, Q10/15  
[ 607 ]  
 
2014-03-10 Sckipio Technologies S.I. Ltd.   IPR statement.     Q4/15  
[ 606 ]  
 
2014-03-10 Deutsche Telekom AG   Threshold Profile Management for OTN     Q14/15  
[ 605 ]  
 
2014-03-10 Deutsche Telekom AG   Proposed corrections to the performance management functions in G.874 Amd 2     Q14/15  
[ 604 ]  
 
2014-03-10 China Unicom   Considerations on control plane derived from G.8080 for G.ODUSMP     Q9/15  
[ 603 ]  
 
2014-03-10 China Unicom   Proposal on fundamental visor and virtualization in soft-defined transport network     Q14/15, Q12/15  
[ 602 ]  
 
2014-03-10 Futurewei Technologies US R&D Center   Reusing PON-ID as TWDM channel ID     Q2/15  
[ 601 ]  
 
2014-03-10 Vitesse Semiconductor Corporation   T-BC Performance with/without SyncE [G.8273.2]     Q13/15  
[ 600 ]  
 
2014-03-10 Futurewei Technologies US R&D Center   Comments to Feb 2014 Q2 interim document "D33_G.989.3-Tuning-States-20140218-VZ-ZTE-HIT-MIT-OKI-NTT_r2"     Q2/15  
[ 599 ]  
 
2014-03-10 Calnex Solutions Limited   G.8273.2: T-TSC Specification     Q13/15  
[ 598 ]  
 
2014-03-10 Calnex Solutions Limited   G.8273.2: 1pps Performance Requirements     Q13/15  
[ 597 ]  
 
2014-03-10 Calnex Solutions Limited   G.8273.2: Noise Generation     Q13/15  
[ 596 ]  
 
2014-03-10 Calnex Solutions Limited   G.8273 Annex A Equations     Q13/15  
[ 595 ]  
 
2014-03-10 Calnex Solutions Limited   G.8271.1: MTIE Limit for Dynamic Time Error     Q13/15  
[ 594 ]  
 
2014-03-10 Calnex Solutions Limited   G.8262: Jitter for Multilane, 40G and 100G Interfaces     Q13/15  
[ 593 ]  
 
2014-03-10 Calnex Solutions Limited   G.8260: Definitions of Dynamic Time Error and Maximum Time Error     Q13/15  
[ 592 ]  
 
2014-03-10 Vitesse Semiconductor Corporation   T-BC Time/phase noise generation [G.8273.2, G.8271.1]     Q13/15  
[ 591 ]  
 
2014-03-10 Fujitsu Limited   Proposal of a text of non-linear effects compensation in G.sup39     Q6/15  
[ 590 ]  
 
2014-03-10 Xilinx Incorporation   Symbol Braided FEC for OTU4 & Beyond 100G Multi Vendor IaDI & Beyond 100G IrDI (Blacklink)     Q6/15, Q11/15  
[ 589 ]  
 
2014-03-10 Finisar Corporation   Proposed enhancements to G.671 and G.672 to accommodate flexible grid elements     Q7/15  
[ 588 ]  
 
2014-03-10 Marvell Semiconductor Inc.   G.hn: MPDU priority when including fragments of LLC frames     Q18/15  
[ 587 ]  
 
2014-03-10 Finisar Corporation   Initial measurement data for the proposed 4L1-9D1F EML application code in G.959.1     Q6/15  
[ 586 ]  
 
2014-03-10 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Proposal for time synchronization requirements     Q2/15, Q13/15  
[ 585 ]  
 
2014-03-10 Broadcom Corporation , ZTE Corporation   Considerations of Error decorrelator for 100G and beyond FEC     Q11/15  
[ 584 ]  
 
2014-03-10 China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal about SMSR parameter for advanced modulation formats in ITU-T G.698.2     Q6/15  
[ 583 ]  
 
2014-03-10 ZTE Corporation , Ministry of Industry and Information Technology (MIIT)   Consideration about Spectral Excursion in G.698.2     Q6/15  
[ 582 ]  
 
2014-03-10 KDDI Corporation   Proposal on B100G OTN mapping and multiplexing structure     Q11/15  
[ 581 ]  
 
2014-03-10 China Unicom , ZTE Corporation   Considerations about the EVM     Q6/15  
[ 580 ]  
 
2014-03-10 ZTE Corporation   Consideration about a requirement for consistency of switching action in G.mdsp     Q9/15  
[ 579 ]  
 
2014-03-10 ZTE Corporation   A proposed protection mechanism for a failure use case in G.MDSP     Q9/15  
[ 578 ]  
 
2014-03-10 ZTE Corporation   G.fast: Comments on link-state transition     Q4/15  
Results:337 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-9-29