International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  TD-WP1 (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  [ 2013-07-01 ]  2013-02-01 

Results:88 total items.
Result page:  1 - 2  - Next Next
Temporary Documents  (WP1)  [ Questions: Q4/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 190-WP1 ]  
 
2013-07-11 G.hn Ad Hoc Convener   G.hs Report of G.fast Handshake Tones Ad Hoc     Q4/15  
[ 187-WP1 ]  
 
2013-07-11 Editor G.fast   G.fast: Compromise proposal on early stages of G.fast initialization     Q4/15  
[ 182-WP1 ]  
 
2013-07-10 Ad-hoc convenor   G.vdsl: Ad-Hoc report on Low-Power Modes (LPM)     Q4/15  
[ 181-WP1 ]  
 
2013-07-09 Rapporteur Q15/15   Draft LS/o on updates to the list of IoT-related Questions     Q4/15, Q18/15, Q15/15, Q1/15  
[ 179-WP1 ]  
 
2013-07-09 Ad-Hoc convenor   G.fast-PSD: Adhoc report - details of PSD mask specification     Q4/15  
[ 177-WP1 ]  
 
2013-07-09 Ad-hoc convener   G.fast-PSD: Adhoc report on PSD definition and notching mask (NM) definition     Q4/15  
[ 172-WP1 ]  
(Rev.1-5) 
2013-07-01 Rapporteur Q1/15   Living list of CIT activities related to technologies based on ITU-T Recommendations from WP1/15     Q4/15, Q2/15, Q18/15, Q15/15, Q1/15  
[ 166-WP1 ]  
 
2013-06-26 ETSI ATTM TM6   LS/i on VDSL2 Band Plans [from ETSI ATTM TM6]     Q4/15  
[ 155-WP1 ]  
 
2013-06-20 Chairman WP1/15   WP1/15 status of Recommendations     Q4/15, Q2/15, Q18/15, Q15/15, Q1/15  
[ 154-WP1 ]  
 
2013-06-20 Chairman WP1/15   WP1/15 Liaison Statements     Q4/15, Q2/15, Q18/15, Q15/15, Q1/15  
[ 153-WP1 ]  
+Add.1 
2013-06-20 Chairman WP1/15   WP1/15 interim activities     Q4/15, Q2/15, Q18/15, Q15/15, Q1/15  
[ 152-WP1 ]  
 
2013-06-20 Chairman WP1/15   WP1/15 texts for Approval, Determination, Consent and Agreement     Q4/15, Q2/15, Q18/15, Q1515, Q1/15  
[ 151-WP1 ]  
 
2013-06-20 Chairman WP1/15   WP1/15 meeting report (July 2013)     Q4/15, Q2/15, Q18/15, Q15/15, Q1/15  
[ 150-WP1 ]  
(Rev.1-2) 
2013-06-20 Chairman WP1/15   Agenda of the WP1/15 Meeting (July 2013)     Q4/15, Q2/15, Q18/15, Q15/15, Q1/15  
[ 147-WP1 ]  
(Rev.1) 
2013-06-19 Editor G.996.2   G.996.2 (G.lt): Issues list     Q4/15  
[ 146-WP1 ]  
(Rev.1) 
2013-06-19 Editor G.998.3   G.998.3 (G.bond): Issues List - STM Bonding     Q4/15  
[ 145-WP1 ]  
(Rev.1) 
2013-06-19 Editor G.998.2   G.998.2 (G.bond): Issues list - Ethernet Bonding     Q4/15  
[ 144-WP1 ]  
(Rev.1) 
2013-06-19 Editor G.998.1   G.998.1 (G.bond): Issues list - ATM Bonding     Q4/15  
[ 143-WP1 ]  
(Rev.1) 
2013-06-19 Editor G.999.1   G.999.1 (G.int): Issues list - Link/PHY Interface     Q4/15  
[ 142-WP1 ]  
 
2013-06-19 Rapporteur Q4/15   Report of the Q4/15 meeting (Geneva, July 2013)     Q4/15  
[ 141-WP1 ]  
 
2013-06-19 Rapporteur Q4/15   Agenda of the Q4/15 meeting (Geneva, July 2013)     Q4/15  
[ 137-WP1 ]  
(Rev.1) 
2013-06-18 Editor G.994.1   G.hs: Issues list     Q4/15  
[ 136-WP1 ]  
(Rev.1) 
2013-06-18 Editor G.997.1   G.ploam: Issues list     Q4/15  
[ 129-WP1 ]  
(Rev.1) 
2013-06-18 Editor G.fast   G.fast: Issues list     Q4/15  
[ 128-WP1 ]  
 
2013-06-18 Editor G.fast   G.fast: Updated draft, version 6.0     Q4/15  
[ 110-WP1 ]  
 
2013-06-14 Rapporteur Q4/15   Report of Q4/15 meeting (18-22 March 2013)     Q4/15  
[ 109-WP1 ]  
 
2013-06-14 Rapporteur Q4/15   Report of Q4/15 meeting (13-17 May 2013)     Q4/15  
[ 108-WP1 ]  
 
2013-06-14 Rapporteur Q4/15   Report of Q4/15 teleconference (8 April 2013)     Q4/15  
[ 107-WP1 ]  
 
2013-06-14 Rapporteur Q4/15   Report of Q4/15 teleconference (10 April 2013)     Q4/15  
[ 106-WP1 ]  
 
2013-06-14 Rapporteur Q4/15   Report of Q4/15 teleconference (21 February 2013)     Q4/15  
[ 105-WP1 ]  
 
2013-06-14 Rapporteur Q4/15   Report of Q4/15 teleconference (23 May 2013)     Q4/15  
[ 104-WP1 ]  
(Rev.1) 
2013-06-14 Editor G.998.4   G.inp: Issues list     Q4/15  
[ 103-WP1 ]  
(Rev.1) 
2013-06-14 Editor G.993.2   G.vdsl: Issues list     Q4/15  
[ 102-WP1 ]  
(Rev.1) 
2013-06-14 Editor G.992.3   G.adsl: Issues list     Q4/15  
[ 101-WP1 ]  
(Rev.1) 
2013-06-14 Editor G.993.5   G.vector: Issues list     Q4/15  
[ 100-WP1 ]  
 
2013-06-14 ITU-R WP1A   LS/i on coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast [from ITU-R WP1A]     Q4/15, Q18/15, Q15/15, Q1/15  
[ 98-WP1 ]  
 
2013-06-07 BBF   LS/i on Copper Transmission Models for Testing above 30 MHz [from Broadband Forum]     Q4/15  
[ 96-WP1 ]  
 
2013-06-03 ITU-R SG5   LS/i on coexistence of wired and wireless communications systems - Revision of Recommendation ITU-T K.60 [from ITU-R SG5]     Q4/15, Q18/15, Q15/15, Q1/15  
[ 94-WP1 ]  
 
2013-06-03 ITU-R SG5   LS/i on coexistence of wired and wireless communications systems - Further developments on Recommendation ITU-T G.fast [from ITU-R SG5]     Q4/15, Q2/15, Q1/15  
[ 86-WP1 ]  
(Rev.1) 
2013-05-29 Rapporteur Q4/15   LS/o/r on pre-published Amendment 3 to Recommendation ITU-T G.993.2 (2011) and Amendment 2 to Recommendation ITU T G.997.1 (2012) (BBF-LS004) [to Broadband Forum]     Q4/15  
[ 82-WP1 ]  
 
2013-05-13 Rapporteur Q2/15   LS/o regarding G.fast transceiver awareness of QoS queues occupancy [to Broadband Forum]     Q4/15, Q2/15  
[ 81-WP1 ]  
 
2013-05-13 BBF   LS/i on G.Fast and FTTdp [from Broadband Forum]     Q4/15, Q2/15  
[ 80-WP1 ]  
 
2013-05-10 ITU-R WP6A   LS/i on considerations on wired telecommunications systems being developed under G.fast and J.hinoc [from ITU-R WP6A to ITU-R WP1A]     Q4/15, Q18/15, Q15/15  
[ 70-WP1 ]  
 
2013-04-18 ETSI TC ATTM TM6   LS/i on Reverse Powering from ETSI TC ATTM TM6 to ITU-T Q4/15     Q4/15  
[ 69-WP1 ]  
 
2013-04-18 ETSI TC ATTM TM6   LS/i/r on the Development of MIMO Channel Model for G.fast from ESI TC ATTM TM6 to Q4/15 (reply to LSO-007)     Q4/15  
[ 66-WP1 ]  
 
2013-03-28 Rapporteur Q4/15   LS/o: Liaison to Broadband Forum regarding micro-interruptions     Q4/15  
[ 65-WP1 ]  
 
2013-03-28 Rapporteur Q4/15   LS/o: Liaison to the Broadband Forum regarding accuracy of the ITU-T G.992.3 SATN test parameter     Q4/15  
[ 64-WP1 ]  
 
2013-03-28 Rapporteur Q4/15   LS/o: Liaison regarding G.fast transceiver awareness of QoS queues occupancy     Q4/15, Q2/15  
[ 63-WP1 ]  
 
2013-03-28 Rapporteur Q4/15   LS/o: Upstream flow control in G.fast     Q4/15, Q2/15  
[ 62-WP1 ]  
 
2013-03-28 Rapporteur Q4/15   LS/o: Liaison to ETSI ATTM TM6 regarding ITU-T G.993.2 Annex B     Q4/15  
Results:88 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-6-1