International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  TD-WP1 (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  [ 2013-07-01 ]  2013-02-01 

Results:190 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Temporary Documents  (WP1)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 65-WP1 ]  
 
LS/o: Liaison to the Broadband Forum regarding accuracy of the ITU-T G.992.3 SATN test parameter     Rapporteur Q4/15   Q4/15   2013-03-28
[ 64-WP1 ]  
 
LS/o: Liaison regarding G.fast transceiver awareness of QoS queues occupancy     Rapporteur Q4/15   Q4/15, Q2/15   2013-03-28
[ 63-WP1 ]  
 
LS/o: Upstream flow control in G.fast     Rapporteur Q4/15   Q4/15, Q2/15   2013-03-28
[ 62-WP1 ]  
 
LS/o: Liaison to ETSI ATTM TM6 regarding ITU-T G.993.2 Annex B     Rapporteur Q4/15   Q4/15   2013-03-28
[ 61-WP1 ]  
 
LS/o: Reply to the comments about G.epon     Rapporteur Q2/15   Q2/15   2013-03-13
[ 60-WP1 ]  
 
LS/o: Proposal for new ITU-T implementers' guide for tests for G.epon     Rapporteur Q2/15   Q2/15   2013-03-13
[ 59-WP1 ]  
 
LS/i: Liaison to ITU-T Q4/15 regarding VDSL2 LPM requirements     BBF   Q4/15   2013-03-11
[ 58-WP1 ]  
 
LS/i: On Cable Modelling above 30 MHz - Response to your liaison COM 15 - LS 007 - E     BBF   Q4/15   2013-03-11
[ 57-WP1 ]  
 
LS/i: G.vector operation in the presence of micro-interruptions     BBF   Q4/15   2013-03-11
[ 56-WP1 ]  
 
LS/i: Query on Accuracy of SATN for G.992.3     BBF   Q4/15   2013-03-11
[ 55-WP1 ]  
 
LS/i: Management of 'G.fast' and 'Fiber to the DP' (FTTdp) architectures     BBF   Q4/15   2013-03-11
[ 54-WP1 ]  
 
LS/i: Liaison to ITU-T SG15 Q4 regarding Data Gathering     BBF   Q4/15   2013-03-11
[ 53-WP1 ]  
 
LS/i: TTC JJ-300.11: G3-PLC based standard     TTC   Q4/15, Q2/15, Q18/15, Q15/15, Q1/15   2013-03-01
[ 52-WP1 ]  
(Rev.1) 
LS/i/r: Reply to Request to fill a) living list table of technologies suitable for testing and b) list of possible pilot projects for conformity assessment against ITU-T Recommendations     ITU-T SG11   1/15   2013-03-01
[ 51-WP1 ]  
 
LS/o: Liaison regarding normalized CRC definition in ITU-T G.993.2 and CRC-8 in ITU-T G.997.1     Rapporteur Q4/15   Q4/15   2013-03-01
[ 50-WP1 ]  
 
LS/o: Liaison regarding requirement for fast re-train of VDSL2 (ITU-T G.993.2)     Rapporteur Q4/15   Q4/15   2013-03-01
[ 49-WP1 ]  
 
LS/o/r: Reply to Liaison from CISPR/I regarding ongoing work in ITU-T SG15     Rapporteur Q18/15   Q18/15   2013-02-22
[ 48-WP1 ]  
 
LS/i/r: Response to "New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan. (Ref: COM 15 - LS 410) "     ITU-T SG2   Q1/15   2013-02-19
[ 47-WP1 ]  
 
LS/i: Reply LS to ITU-R WP 1A and WPs 5A, 5B and 5C on impact from wired telecommunication (including PLT) on radiocommunication systems     ITU-T SG9   Q4/15, Q2/15, Q18/15, Q15/15, Q1/15   2013-02-04
[ 46-WP1 ]  
 
LS/i/r: Reply LS to SG 15 on ANT standardization plan     ITU-T SG9   Q1/15   2013-02-04
[ 45-WP1 ]  
 
LS/i: Reply Liaison from ITU-T SG15 (Call for Information (CFI): Information about Certification and Interoperability Testing (CIT) activities for Access and Home Networks     ITU-T SG9   Q4/15, Q2/15, Q18/15, Q15/15, Q1/15   2013-02-04
[ 44-WP1 ]  
(Rev.1) 
LS/o: oLS to BBF regarding fast retrain for G.FAST     Rapporteur Q4/15   Q4/15   2013-02-01
[ 43-WP1 ]  
 
LS/o: oLS to BBF, ETSI/ATTM/TM6 & ATIS COAST-NAI on development of MIMO Channel Model for G.fast     Rapporteur Q4/15   Q4/15   2013-02-01
[ 42-WP1 ]  
 
LS/i/r: Reply LS to ITU-T SG 15 on new versions of the Access Network Transport (ANT) Standardization Plan and Work Plan     ITU-T SG16   Q1/15   2013-02-01
[ 41-WP1 ]  
 
G.hn: Updated Issues List for continuing work on G.hn     Editor G.hn   Q18/15   2013-02-01
[ 40-WP1 ]  
 
Report of the Q4/15 meeting (Geneva, 28 January - 1 February 2013)     Rapporteur Q4/15   Q4/15   2013-02-01
[ 39-WP1 ]  
 
Updated Issues List for G.fast     Editor G.fast   Q18/15   2013-02-01
[ 38-WP1 ]  
 
Report of the Q4/15 teleconference (17 January 2013)     Rapporteur Q4/15   Q4/15   2013-01-30
[ 37-WP1 ]  
 
Report of the Q4/15 teleconference (11 December 2012)     Rapporteur Q4/15   Q4/15   2013-01-30
[ 36-WP1 ]  
 
Report of the Q4a/15 meeting (Chengdu, 5-9 November 2012)     Rapporteur Q4/15   Q4/15   2013-01-30
[ 35-WP1 ]  
 
LS/o/r: Liaison Reply to TTC on Narrow band PLC specifications for Japan     Rapporteur Q15/15   Q15/15   2013-01-27
[ 34-WP1 ]  
 
Report of the WP1/15 meeting (Geneva, 1 February 2013)     Chairman WP1/15   Q4/15, Q2/15, Q18/15, Q15/15, Q1/15   2013-01-24
[ 33-WP1 ]  
 
WP1/15 texts for Consent, Determination and Agreement on 1 February 2013     Chairman WP1/15   Q4/15, Q2/15, Q18/15, Q15/15, Q1/15   2013-01-24
[ 32-WP1 ]  
 
Agenda for WP1/15 meeting (Geneva, 1 February 2013)     Chairman WP1/15   Q4/15, Q2/15, Q18/15, Q15/15, Q1/15   2013-01-24
[ 31-WP1 ]  
 
Issues list for G.prime (G.9904)     Rapporteur Q15/15   Q15/15   2013-01-23
[ 30-WP1 ]  
 
Issues list for G.g3 (G.9903)     Rapporteur Q15/15   Q15/15   2013-01-23
[ 29-WP1 ]  
 
Issues list for G.hnem (G.9902)     Rapporteur Q15/15   Q15/15   2013-01-23
[ 28-WP1 ]  
 
Issues list for G.psd (G.9901)     Rapporteur Q15/15   Q15/15   2013-01-23
[ 27-WP1 ]  
 
Report of Q15/15 meeting (Dallas, 21-25 January 2013)     Rapporteur Q15/15   Q15/15   2013-01-23
[ 26-WP1 ]  
 
Report of Q15/15 teleconference (20 November 2012)     Rapporteur Q15/15   Q15/15   2013-01-23
[ 25-WP1 ]  
 
LS/o: Liaison to CENELEC TC 13 on ITU-T G.990x Recommendations     Rappporteur Q15/15   Q15/15   2013-01-21
[ 24-WP1 ]  
(Rev.1) 
LS/i: Coexistence specifications in G.9903 (G3) and G.9904 (PRIME)     SGIP PAP15   Q15/15   2013-01-16
[ 23-WP1 ]  
 
LS/i: G3-PLC based Narrow band PLC specifications in Japan     TTC   Q15/15   2013-01-16
[ 22-WP1 ]  
 
LS/i: Access Network Transport (ANT) Standardization Plan and Work Plan     CENELEC/TC 215   Q1/15   2013-01-15
[ 21-WP1 ]  
 
LS/i: Status of G.fast     BBF   Q4/15   2013-01-03
[ 20-WP1 ]  
 
LS/i: Liaison to ITU-T SG15 Q4a regarding normalized CRC definition in G.993.2 and CRC-8 in G.997.1     BBF   Q4/15   2012-12-19
[ 19-WP1 ]  
 
LS/i: Liaison to ITU-T SG15 Q4a regarding G.996.2 testing of UER     BBF   Q4/15   2012-12-19
[ 18-WP1 ]  
 
LS/i: Liaison to ITU-T SG15 Q4a/15 regarding MELT testing     BBF   Q4/15   2012-12-19
[ 17-WP1 ]  
 
LS/i: Requirement for fast re-train of VDSL2 (G.993.2) and G.fast technologies     BBF   Q4/15   2012-12-19
[ 16-WP1 ]  
 
LS/i: Impact from wired telecommunication (including PLT) on radiocommunication systems     ITU-R SG5   Q4/15, Q18/15, Q15/15, Q1/15   2012-12-19
Results:190 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26