International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:87 total items.
Result page:   -  1 - 2  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 313 ]  
 
Further discussion regarding definition of "floor" in time-transfer application     Ixia , Symmetricom   Q13/15   2013-06-18
[ 312 ]  
 
Discussion regarding definition of "floor" in time-transfer application     Ixia , Symmetricom   Q13/15   2013-06-18
[ 311 ]  
 
Analysis of Cluster-width and packet-selection window interaction     Ixia   Q13/15   2013-06-18
[ 310 ]  
 
Normal operation of telecom-grade network elements for supporting packet-based timing     Ixia   Q13/15   2013-06-18
[ 309 ]  
 
Figures for measurement of combined (PRTC+T-GM)     Ixia   Q13/15   2013-06-18
[ 308 ]  
 
Network Limit at Reference points C and D in G.8271.1     Ixia   Q13/15   2013-06-18
[ 302 ]  
 
G.8275.1: Clarification on the contents of Announce Messages     Juniper Networks   Q13/15   2013-06-17
[ 301 ]  
 
G.8273.2: Packet Selection for T-BCs and T-TSCs for PTP Time/Phase Profiles     Juniper Networks   Q13/15   2013-06-17
[ 296 ]  
 
Revision of network limits in G.8271.1     Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Telefon AB - LM Ericsson   Q13/15   2013-06-17
[ 295 ]  
(Rev.1) 
Mitigation of time error due to SyncE transients in G.8273.2     Telefon AB - LM Ericsson   Q13/15   2013-06-17
[ 294 ]  
 
Coexistence of different profiles in G.8275     Telefon AB - LM Ericsson   Q13/15   2013-06-17
[ 284 ]  
(Rev.1) 
Q13/15 Synchronization Requirements Structure     Deutsche Telekom AG   Q13/15   2013-06-17
[ 275 ]  
 
Re-arrangement times for G.8271.1 HRM topologies     Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 274 ]  
 
Development of Slave Clock Specifications for Different Use Cases     Sprint   Q13/15   2013-06-17
[ 272 ]  
(Rev.1) 
Service Requirements for Manageable Synchronization Infrastructure     Alcatel-Lucent USA Inc. , Sprint   Q13/15   2013-06-17
[ 259 ]  
 
G.8271.1 Appendix VI modifications for cTE classes [G.8271.1]     Vitesse Semiconductor Corporation   Q13/15   2013-06-17
[ 258 ]  
 
PTP Equipment Classification [G.8273.2, G.8273, G.8271.1]     Cisco Systems, Inc. , Vitesse Semiconductor Corporation   Q13/15   2013-06-17
[ 253 ]  
 
Static noise generation of G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 252 ]  
 
Delay_Req Transmission Requirements in G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 251 ]  
 
Proposals for G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 250 ]  
 
Proposal for default value for offsetScaledLogVariance, for G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 249 ]  
 
Discussion of Noise Tolerance in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 248 ]  
 
Proposal for Time Noise Transfer in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 247 ]  
 
Proposed Text for Method 3 of G.8263-Testing     Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG , Orange   Q13/15   2013-06-17
[ 246 ]  
 
Proposed Correction to Annex C of ITU-T Rec. O.172     Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 245 ]  
 
PLL bandwidth requirement for G.8261.1 network limit test     Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 244 ]  
 
Delay asymmetry test result using different traffic generation methods     Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 243 ]  
 
Proposals for Transient and Holdover Specifications for G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 241 ]  
 
The time noise generation of T-BC in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 240 ]  
 
Explanation of Time Selector Block in G.8273.2 Functional Model     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 239 ]  
 
Network limit and HRM hops of G.8271.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 238 ]  
 
HRM2 SyncE transients of G.8271.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 237 ]  
 
Clock Classes for G.8275.1 and T-BC/T-TSC Models     Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 212 ]  
 
The Coordination and Transformation of Time and Frequency Information of G.8273.2 T-BC Network Element     China Unicom   Q13/15   2013-06-17
[ 211 ]  
 
Relationship between networks PDV cumulative thresholds and 1pps performance in ITU-T Rec. G.8271.1     China Unicom   Q13/15   2013-06-17
[ 210 ]  
 
Propose about messaging behaviour of boundary clock in Multicast/Unicast network     China Unicom   Q13/15   2013-06-17
[ 180 ]  
(Rev.1-2) 
Proposal for Phase/time traceability information of PTP clock in holdover     Ministry of Industry and Information Technology (MIIT)   Q13/15   2013-06-17
[ 153 ]  
 
Extension to G.8273 Annex B to address the combined 'PRTC + T-GM' case     Calnex Solutions Limited , Deutsche Telekom AG   Q13/15   2013-06-16
[ 152 ]  
 
G.8260 & G.8273: Practical considerations in doing Constant Time Error measurements.     Calnex Solutions Limited   Q13/15   2013-06-16
[ 147 ]  
 
T-GM: types, PRTC integration and performance     A1 Telekom Austria AG , China Mobile Communications Corporation , Deutsche Telekom AG , Orange   Q13/15   2013-06-16
[ 124 ]  
 
G.8275.1: Title     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 123 ]  
 
G.8275.1: Default Parameter Values     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 122 ]  
 
G.8272: Revisions to Appendix 1 to include the case of a combined PRTC/T-GM     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 121 ]  
 
G.8263: Modification to Proposed Testing Appendix     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 120 ]  
 
G.8260: The Use of Exceptions for Network Limits using FPP     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 119 ]  
 
Percentile Average Clarification in G.8260     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 118 ]  
 
FPP and Percentile of Live Network PDV     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 83 ]  
 
How to handle unused PTP fields in BMCA/G.781 [G.8275.1]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 82 ]  
 
Noise Generation & Noise Transfer Text [G.8273.2]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 81 ]  
 
Adding Applicable Interfaces to PRTC [G.8272]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
Results:87 total items.
Result page:   -  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-28