International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:87 total items.
Result page:   -  1 - 2  - Next Next
Contributions  [ Questions: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 313 ]  
 
2013-06-18 Ixia , Symmetricom   Further discussion regarding definition of "floor" in time-transfer application     Q13/15  
[ 312 ]  
 
2013-06-18 Ixia , Symmetricom   Discussion regarding definition of "floor" in time-transfer application     Q13/15  
[ 311 ]  
 
2013-06-18 Ixia   Analysis of Cluster-width and packet-selection window interaction     Q13/15  
[ 310 ]  
 
2013-06-18 Ixia   Normal operation of telecom-grade network elements for supporting packet-based timing     Q13/15  
[ 309 ]  
 
2013-06-18 Ixia   Figures for measurement of combined (PRTC+T-GM)     Q13/15  
[ 308 ]  
 
2013-06-18 Ixia   Network Limit at Reference points C and D in G.8271.1     Q13/15  
[ 302 ]  
 
2013-06-17 Juniper Networks   G.8275.1: Clarification on the contents of Announce Messages     Q13/15  
[ 301 ]  
 
2013-06-17 Juniper Networks   G.8273.2: Packet Selection for T-BCs and T-TSCs for PTP Time/Phase Profiles     Q13/15  
[ 296 ]  
 
2013-06-17 Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Telefon AB - LM Ericsson   Revision of network limits in G.8271.1     Q13/15  
[ 295 ]  
(Rev.1) 
2013-06-17 Telefon AB - LM Ericsson   Mitigation of time error due to SyncE transients in G.8273.2     Q13/15  
[ 294 ]  
 
2013-06-17 Telefon AB - LM Ericsson   Coexistence of different profiles in G.8275     Q13/15  
[ 284 ]  
(Rev.1) 
2013-06-17 Deutsche Telekom AG   Q13/15 Synchronization Requirements Structure     Q13/15  
[ 275 ]  
 
2013-06-17 Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd.   Re-arrangement times for G.8271.1 HRM topologies     Q13/15  
[ 274 ]  
 
2013-06-17 Sprint   Development of Slave Clock Specifications for Different Use Cases     Q13/15  
[ 272 ]  
(Rev.1) 
2013-06-17 Alcatel-Lucent USA Inc. , Sprint   Service Requirements for Manageable Synchronization Infrastructure     Q13/15  
[ 259 ]  
 
2013-06-17 Vitesse Semiconductor Corporation   G.8271.1 Appendix VI modifications for cTE classes [G.8271.1]     Q13/15  
[ 258 ]  
 
2013-06-17 Cisco Systems, Inc. , Vitesse Semiconductor Corporation   PTP Equipment Classification [G.8273.2, G.8273, G.8271.1]     Q13/15  
[ 253 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Static noise generation of G.8273.2     Q13/15  
[ 252 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Delay_Req Transmission Requirements in G.8275.1     Q13/15  
[ 251 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Proposals for G.8275.1     Q13/15  
[ 250 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Proposal for default value for offsetScaledLogVariance, for G.8275.1     Q13/15  
[ 249 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Discussion of Noise Tolerance in G.8273.2     Q13/15  
[ 248 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Proposal for Time Noise Transfer in G.8273.2     Q13/15  
[ 247 ]  
 
2013-06-17 Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG , Orange   Proposed Text for Method 3 of G.8263-Testing     Q13/15  
[ 246 ]  
 
2013-06-17 Huawei Technologies Co. Ltd.   Proposed Correction to Annex C of ITU-T Rec. O.172     Q13/15  
[ 245 ]  
 
2013-06-17 Huawei Technologies Co. Ltd.   PLL bandwidth requirement for G.8261.1 network limit test     Q13/15  
[ 244 ]  
 
2013-06-17 Huawei Technologies Co. Ltd.   Delay asymmetry test result using different traffic generation methods     Q13/15  
[ 243 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Proposals for Transient and Holdover Specifications for G.8273.2     Q13/15  
[ 241 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   The time noise generation of T-BC in G.8273.2     Q13/15  
[ 240 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Explanation of Time Selector Block in G.8273.2 Functional Model     Q13/15  
[ 239 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Network limit and HRM hops of G.8271.1     Q13/15  
[ 238 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   HRM2 SyncE transients of G.8271.1     Q13/15  
[ 237 ]  
 
2013-06-17 Huawei Technologies Co. Ltd.   Clock Classes for G.8275.1 and T-BC/T-TSC Models     Q13/15  
[ 212 ]  
 
2013-06-17 China Unicom   The Coordination and Transformation of Time and Frequency Information of G.8273.2 T-BC Network Element     Q13/15  
[ 211 ]  
 
2013-06-17 China Unicom   Relationship between networks PDV cumulative thresholds and 1pps performance in ITU-T Rec. G.8271.1     Q13/15  
[ 210 ]  
 
2013-06-17 China Unicom   Propose about messaging behaviour of boundary clock in Multicast/Unicast network     Q13/15  
[ 180 ]  
(Rev.1-2) 
2013-06-17 Ministry of Industry and Information Technology (MIIT)   Proposal for Phase/time traceability information of PTP clock in holdover     Q13/15  
[ 153 ]  
 
2013-06-16 Calnex Solutions Limited , Deutsche Telekom AG   Extension to G.8273 Annex B to address the combined 'PRTC + T-GM' case     Q13/15  
[ 152 ]  
 
2013-06-16 Calnex Solutions Limited   G.8260 & G.8273: Practical considerations in doing Constant Time Error measurements.     Q13/15  
[ 147 ]  
 
2013-06-16 A1 Telekom Austria AG , China Mobile Communications Corporation , Deutsche Telekom AG , Orange   T-GM: types, PRTC integration and performance     Q13/15  
[ 124 ]  
 
2013-06-15 SymmetriCom, Inc.   G.8275.1: Title     Q13/15  
[ 123 ]  
 
2013-06-15 SymmetriCom, Inc.   G.8275.1: Default Parameter Values     Q13/15  
[ 122 ]  
 
2013-06-15 SymmetriCom, Inc.   G.8272: Revisions to Appendix 1 to include the case of a combined PRTC/T-GM     Q13/15  
[ 121 ]  
 
2013-06-15 SymmetriCom, Inc.   G.8263: Modification to Proposed Testing Appendix     Q13/15  
[ 120 ]  
 
2013-06-15 SymmetriCom, Inc.   G.8260: The Use of Exceptions for Network Limits using FPP     Q13/15  
[ 119 ]  
 
2013-06-15 SymmetriCom, Inc.   Percentile Average Clarification in G.8260     Q13/15  
[ 118 ]  
 
2013-06-15 SymmetriCom, Inc.   FPP and Percentile of Live Network PDV     Q13/15  
[ 83 ]  
 
2013-06-13 Microsemi Semiconductor Corporation   How to handle unused PTP fields in BMCA/G.781 [G.8275.1]     Q13/15  
[ 82 ]  
 
2013-06-13 Microsemi Semiconductor Corporation   Noise Generation & Noise Transfer Text [G.8273.2]     Q13/15  
[ 81 ]  
 
2013-06-13 Microsemi Semiconductor Corporation   Adding Applicable Interfaces to PRTC [G.8272]     Q13/15  
Results:87 total items.
Result page:   -  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-9-28