International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:440 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 115 ]  
 
Multiple rate TC extension for TWDM     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 114 ]  
 
OFS Proposal for revisions to 657     OFS Fitel, LLC   Q5/15   2013-06-14
[ 113 ]  
 
OFS Proposal for revisions to 652.D     OFS Fitel, LLC   Q5/15   2013-06-14
[ 112 ]  
(Rev.1) 
OFS Proposal for a new G.654 Category     OFS Fitel, LLC   Q5/15   2013-06-14
[ 111 ]  
 
Criteria for evaluating ODU SMP protocol proposals     Tellabs Oy   Q9/15   2013-06-14
[ 110 ]  
 
OTN Sec : Security for OTN beyond 100 Gbit/s     Applied Micro Circuits Corporation (AMCC)   Q11/15   2013-06-14
[ 109 ]  
 
G.975.1 Appendix I.4 corrections     Applied Micro Circuits Corporation (AMCC)   Q8/15   2013-06-14
[ 108 ]  
 
G.fast: SOS-like Scheme as Fast OLR     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 107 ]  
 
G.fast: Transmitter Initiated Gain and Bit-Loading Adjustment     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 106 ]  
 
G.fast: Configuration of Gap Time Parameter Tg2     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 105 ]  
 
G.vdsl: Low Power Mode proposal and working text     TQ DELTA. LLC   Q4/15   2013-06-14
[ 104 ]  
(Rev.1) 
G.vector, G.hs: Potential Ghost Start Issue in G.vector     Ikanos Communications   Q4/15   2013-06-14
[ 103 ]  
 
Proposed Revisions to the Current G.mdsp Draft     Fujitsu Network Communications, Inc.   Q9/15   2013-06-14
[ 102 ]  
 
G.fast: Maximum aggregate transmit power     Deutsche Telekom AG , Swisscom SA   Q4/15   2013-06-14
[ 101 ]  
 
G.metro scope proposal     ADVA Optical Networking , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG , Italy , Nokia Siemens Networks GmbH & Co. KG , Telefon AB - LM Ericsson   Q6/15   2013-06-14
[ 100 ]  
 
G.hn: Backup security controller mechanism     Huawei Technologies Co. Ltd.   Q18/15   2013-06-14
[ 99 ]  
 
G.hn: Improving the existing domain merging procedure     Huawei Technologies Co. Ltd.   Q18/15   2013-06-14
[ 98 ]  
 
Considerations on flexible ODU and OTU overhead [SP7]     Fujitsu Limited   Q11/15   2013-06-14
[ 97 ]  
 
Comparisons between single and multi OTUCm/OCh signal approaches [SP4, SP5]     Fujitsu Limited   Q11/15   2013-06-14
[ 96 ]  
 
Considerations on B100G OTN multiplexing hierarchy [SP23]     Fujitsu Limited   Q11/15   2013-06-14
[ 95 ]  
(Rev.1) 
Consideration on B100G OTN multiplexing     Fujitsu Limited   Q11/15   2013-06-14
[ 94 ]  
 
Comments and proposal on the restructuring of G.652 & G.657 categories     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT)   Q5/15   2013-06-14
[ 93 ]  
 
Consideration on 400GE signal transmission over B100G OTN     Fujitsu Limited   Q11/15   2013-06-14
[ 92 ]  
 
Proposal for starting the procedure of the new Recommendation about micro-ducts technology and its application in the access network.     Italy   Q16/15   2013-06-14
[ 91 ]  
 
Beginning Of Life ("BOL") versus End-Of-Life ("EOL") approach in the specification of passive optical components.     Italy   Q7/15, Q2/15, Q16/15   2013-06-14
[ 90 ]  
 
Application scenarios for low-cost DWDM metro systems     Italy   Q6/15   2013-06-14
[ 89 ]  
 
Requirements for low-cost DWDM metro systems     Italy   Q6/15   2013-06-14
[ 88 ]  
 
Proposal about compatibility issues for the revision of G.65x Recommendations on optical fibres     Italy   Q5/15   2013-06-14
[ 87 ]  
 
Operational examples of 2-stage ODU SMP APS protocol     Tellabs Oy   Q9/15   2013-06-13
[ 86 ]  
 
Resource availability notifications in ODU shared mesh protection     Tellabs Oy   Q9/15   2013-06-13
[ 85 ]  
 
Proposed changes to Recommendation G.977 for 40G and 100G systems     Ciena Canada   Q8/15   2013-06-13
[ 84 ]  
 
Proposal for Update to G.977 considering 40G and 100G Coherent Systems     Ciena Canada   Q8/15   2013-06-13
[ 83 ]  
 
How to handle unused PTP fields in BMCA/G.781 [G.8275.1]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 82 ]  
 
Noise Generation & Noise Transfer Text [G.8273.2]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 81 ]  
 
Adding Applicable Interfaces to PRTC [G.8272]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 80 ]  
 
Wander Generation Variable Temperature [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 79 ]  
 
Clarification of Holdover Requirements for PEC-S [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 78 ]  
 
Using G.781 for Time Profile [G.827x]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 77 ]  
 
Compliant & Non-Compliant Networks (Re-routes, Outage, Congestion) with FPP [G.8260, G.8261.1]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 76 ]  
 
Proposal to change the approval process for G.8113.1 and G.8113.2 from TAP to AAP     Canada   Q10/15   2013-06-13
[ 75 ]  
 
Spectral excursion analysis for advanced modulation formats     Ciena Canada   Q6/15   2013-06-13
[ 74 ]  
 
Effective frequency slot characterisation     Ciena Canada   Q6/15, Q12/15   2013-06-13
[ 73 ]  
 
G.It: Discussion on accuracy of multi-component measurements     Microsemi Semiconductor Corporation   Q4/15   2013-06-13
[ 72 ]  
 
G.It: Request for revision of G.996.2 3-element capacitance measurement accuracies     Microsemi Semiconductor Corporation   Q4/15   2013-06-13
[ 71 ]  
 
G.8273.2 latest draft - editorial comments     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 70 ]  
 
G.8273 latest draft - editorial comments     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 69 ]  
 
G.8263 Holdover     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 68 ]  
(Rev.1-2) 
Proposal of SDN-based transport network standardization     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 67 ]  
(Rev.1-3) 
Proposal of research on NBI functionality of controller in SDN-based transport network     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 66 ]  
(Rev.1-2) 
The research of the functions features of the transport network controller     China Unicom , FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
Results:440 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-19