International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:440 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 165 ]  
 
2013-06-17 Finisar Corporation   Proposed Rec. G.959.1 application code for long-haul 100G IrDI using APD receiver     Q6/15  
[ 164 ]  
 
2013-06-17 Fujitsu Limited   Ethernet PM Terminologies in G.8013/Y.1731 and G.8052     Q14/15, Q10/15  
[ 163 ]  
 
2013-06-17 Fujitsu Limited   Proposed solution for SP#26 in G.8013/Y.1731 Living List     Q10/15  
[ 162 ]  
 
2013-06-17 Fujitsu Limited   Usage for MI_GAL_ENABLE in PW     Q14/15, Q12/15, Q10/15  
[ 161 ]  
 
2013-06-17 Fujitsu Limited   Comments and Proposed update OAM Process descriptions for draft G.8121.2     Q10/15  
[ 160 ]  
 
2013-06-17 Fujitsu Limited   Proposed re-structure of Clause 8.8.3 for draft G.8121.2     Q10/15  
[ 159 ]  
 
2013-06-17 Fujitsu Limited   Proposed update items to draft G.8121.1 (Clause 8 and 9)     Q10/15  
[ 158 ]  
(Rev.1) 
2013-06-17 Fujitsu Limited   Proposed Definitions and Abbreviations to draft G.8121.1     Q10/15  
[ 157 ]  
 
2013-06-17 Fujitsu Limited   Comments and proposed update for draft revised G.8121     Q10/15  
[ 156 ]  
 
2013-06-17 Fujitsu Limited   Proposed MPLS-TP Linear protection models for Appendix in G.8121     Q9/15, Q10/15  
[ 155 ]  
 
2013-06-17 Fujitsu Limited   Comments on draft G.808.2     Q9/15  
[ 154 ]  
 
2013-06-17 Fujitsu Limited   Consideration on the notification of availability for ODU SMP     Q9/15  
[ 153 ]  
 
2013-06-16 Calnex Solutions Limited , Deutsche Telekom AG   Extension to G.8273 Annex B to address the combined 'PRTC + T-GM' case     Q13/15  
[ 152 ]  
 
2013-06-16 Calnex Solutions Limited   G.8260 & G.8273: Practical considerations in doing Constant Time Error measurements.     Q13/15  
[ 151 ]  
 
2013-06-16 China Telecommunications Corporation   The consideration on the interface between SDN controller and transport NE     Q14/15, Q12/15  
[ 150 ]  
 
2013-06-16 China Telecommunications Corporation   The consideration on the relationship between the network operating system (OS) in SDN and EMS/NMS in transport network     Q14/15, Q12/15  
[ 149 ]  
 
2013-06-16 China Telecommunications Corporation   Use cases for transport SDN     Q14/15, Q12/15  
[ 148 ]  
 
2013-06-16 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Telecom Italia S.p.A. , ZTE Corporation   Proposal on initiating a new work item on transport SDN     Q14/15, Q12/15  
[ 147 ]  
 
2013-06-16 A1 Telekom Austria AG , China Mobile Communications Corporation , Deutsche Telekom AG , Orange   T-GM: types, PRTC integration and performance     Q13/15  
[ 146 ]  
 
2013-06-16 KDDI Corporation   Consideration on per-OCh monitor function for OTN beyond 100G interface     Q11/15  
[ 145 ]  
 
2013-06-16 Huawei Technologies Co. Ltd. , Infinera Corporation   ODU SMP Activation Time     Q9/15  
[ 144 ]  
 
2013-06-16 Huawei Technologies Co. Ltd. , Infinera Corporation   Improved Encoding/processing of Messages for 1-Stage ODU SMP Protocol     Q9/15  
[ 143 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   Determining the Time Position of Upstream Probe Sequence     Q4/15  
[ 142 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   G.fast: On Discontinuous Operation     Q4/15  
[ 141 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   On Transition From L2.2 to Other States     Q4/15  
[ 140 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   Probe Sequence Modulation and Error Signal Feedback     Q4/15  
[ 139 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   On PSD Control in Vectoring     Q4/15  
[ 138 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   Asynchronous OLR for PSD Control     Q4/15  
[ 137 ]  
 
2013-06-16 ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Updated PtP WDM channel plan     Q2/15  
[ 136 ]  
 
2013-06-16 ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Figure update for Appendix VI     Q2/15  
[ 135 ]  
 
2013-06-16 ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Raman OPP for PtP WDM     Q2/15  
[ 134 ]  
 
2013-06-16 ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   PMD values for PtP WDM     Q2/15  
[ 133 ]  
 
2013-06-16 ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Eye mask parameters for PtP WDM     Q2/15  
[ 132 ]  
 
2013-06-15 AT&T, Inc.   G.bond: Shutting down some lines in a bonded group     Q4/15  
[ 131 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Full capacity in NG-PON2 using line coding     Q2/15  
[ 130 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Proposal to study AWG based WDM PON proposal in mobile front-haul application     Q2/15  
[ 129 ]  
 
2013-06-15 Alcatel-Lucent USA Inc. , Futurewei Technologies US R&D Center   On the editorial placement of NG-PON2 (TWDM) TC-layer specifications     Q2/15  
[ 128 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   On the concept of out-of-band ranging in TWDM PONs     Q2/15  
[ 127 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Impacts of line code change on G.989.2     Q2/15  
[ 126 ]  
 
2013-06-15 ZTE Corporation   Proposed approach for work on OTN beyond 100G     Q6/15, Q14/15, Q12/15, Q11/15  
[ 125 ]  
 
2013-06-15 China Telecommunications Corporation , China Unicom , ZTE Corporation   Proposed model for the OTUCn and OCh layer for OTN beyond 100G     Q6/15, Q14/15, Q12/15, Q11/15  
[ 124 ]  
 
2013-06-15 SymmetriCom, Inc.   G.8275.1: Title     Q13/15  
[ 123 ]  
 
2013-06-15 SymmetriCom, Inc.   G.8275.1: Default Parameter Values     Q13/15  
[ 122 ]  
 
2013-06-15 SymmetriCom, Inc.   G.8272: Revisions to Appendix 1 to include the case of a combined PRTC/T-GM     Q13/15  
[ 121 ]  
 
2013-06-15 SymmetriCom, Inc.   G.8263: Modification to Proposed Testing Appendix     Q13/15  
[ 120 ]  
 
2013-06-15 SymmetriCom, Inc.   G.8260: The Use of Exceptions for Network Limits using FPP     Q13/15  
[ 119 ]  
 
2013-06-15 SymmetriCom, Inc.   Percentile Average Clarification in G.8260     Q13/15  
[ 118 ]  
 
2013-06-15 SymmetriCom, Inc.   FPP and Percentile of Live Network PDV     Q13/15  
[ 117 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   G.poc draft proposal     Q2/15  
[ 116 ]  
 
2013-06-15 ADVA Optical Networking , Futurewei Technologies US R&D Center , Gemfire Europe Limited   Proposal to replace NG-PON2 channel plan in Appendix VII of G.989.2 draft     Q2/15  
Results:440 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-9-28