International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:440 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 190 ]  
(Rev.1) 
Proposed text on multiple failure for G.mdsp     Ministry of Industry and Information Technology (MIIT)   Q9/15   2013-06-17
[ 189 ]  
 
Multilayer protocol stack of OTN interface  
Withdrawn: Duplicate of C-0226
 
China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q11/15   2013-06-17
[ 188 ]  
 
Proposal for Classified Tuning Time in NG-PON2 (G.989.2).     Nippon Telegraph and Telephone Corporation (NTT)   Q2/15   2013-06-17
[ 187 ]  
 
Proposal on initiating a new work item on transport SDN  
Withdrawn: Duplicate of C-0148
 
China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Ministry of Industry and Information Technology (MIIT) , Telecom Italia S.p.A. , ZTE Corporation   Q14/15, Q12/15   2013-06-17
[ 186 ]  
(Rev.1) 
Strategies for SDN control mode in IP and Optical coordinated networks     Ministry of Industry and Information Technology (MIIT) , China Telecom   Q14/15, Q12/15   2013-06-17
[ 185 ]  
(Rev.1-2) 
Proposal on a SDN use case of Express Lane for Elephant Flow     Ministry of Industry and Information Technology (MIIT)   Q12/15   2013-06-17
[ 184 ]  
(Rev.1) 
Consideration of the relationship between SDN control architecture and existing control plane in transport networks     Ministry of Industry and Information Technology (MIIT)   Q14/15, Q12/15   2013-06-17
[ 183 ]  
(Rev.1) 
Considerations about performance parameters of beyond 100G     Ministry of Industry and Information Technology (MIIT)   Q6/15   2013-06-17
[ 182 ]  
(Rev.1-2) 
Proposals for SMSR definition of 40G and 100G in G.698.2     Ministry of Industry and Information Technology (MIIT) , ZTE   Q6/15   2013-06-17
[ 181 ]  
(Rev.1-2) 
Revision proposals for carrier and sub-carrier definition     Ministry of Industry and Information Technology (MIIT) , ZTE   Q6/15   2013-06-17
[ 180 ]  
(Rev.1-2) 
Proposal for Phase/time traceability information of PTP clock in holdover     Ministry of Industry and Information Technology (MIIT)   Q13/15   2013-06-17
[ 179 ]  
 
The proposal for amendment of MFD calculation equation in G.650.1     Ministry of Industry and Information Technology (MIIT)   Q5/15   2013-06-17
[ 178 ]  
 
G.hn: Inter Medium Bridging     Metanoia Technologies, Inc.   Q18/15   2013-06-17
[ 177 ]  
 
Upstream inter-channel crosstalk impairment of TWDM-PON     Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG   Q2/15   2013-06-17
[ 176 ]  
(Rev.1) 
Use case and requirements for metro WDM link     Electronics and Telecommunications Research Institute (ETRI) , KT Corporation   Q6/15   2013-06-17
[ 175 ]  
(Rev.1) 
G.hn, G.vdsl, G.fast : Powerline Interference Indication and Mitigation for DSL transceivers     AT&T, Inc. , Metanoia Technologies, Inc.   Q4/15, Q18/15   2013-06-17
[ 174 ]  
(Rev.1-2) 
Eye mask for Proposed 200 GHz spaced 2.5 Gbps G.698.3 application code     Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG   Q6/15   2013-06-17
[ 173 ]  
 
G.inp: Working Text for Power Efficient Transmission     Metanoia Technologies, Inc.   Q4/15   2013-06-17
[ 172 ]  
 
G.fast: SNR Loss in Discontinuous Operation     Metanoia Technologies, Inc.   Q4/15   2013-06-17
[ 171 ]  
 
Adding the HomeGrid Forum to the list of organizations relevant to the work of Q1/15 and Q15/15     Marvell Semiconductor Inc. , Metanoia Technologies, Inc. , Sigma Designs Israel S.D.I Ltd.   Q15/15, Q1/15   2013-06-17
[ 170 ]  
 
Proposal of optical connector endface visual specification requirements for L.36     NTT Communications Corporation   Q7/15   2013-06-17
[ 169 ]  
 
B100G bit interleaving     ZTE Corporation   Q11/15   2013-06-17
[ 168 ]  
(Rev.1) 
Proposal for revision of L.25     Nippon Telegraph and Telephone Corporation (NTT)   Q17/15   2013-06-17
[ 167 ]  
(Rev.1) 
Comment on draft new recommendation L.omtl     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT)   Q8/15, Q6/15, Q17/15   2013-06-17
[ 166 ]  
(Rev.1) 
Comments on draft new recommendation L.gpsm     Nippon Telegraph and Telephone Corporation (NTT)   Q17/15   2013-06-17
[ 165 ]  
 
Proposed Rec. G.959.1 application code for long-haul 100G IrDI using APD receiver     Finisar Corporation   Q6/15   2013-06-17
[ 164 ]  
 
Ethernet PM Terminologies in G.8013/Y.1731 and G.8052     Fujitsu Limited   Q14/15, Q10/15   2013-06-17
[ 163 ]  
 
Proposed solution for SP#26 in G.8013/Y.1731 Living List     Fujitsu Limited   Q10/15   2013-06-17
[ 162 ]  
 
Usage for MI_GAL_ENABLE in PW     Fujitsu Limited   Q14/15, Q12/15, Q10/15   2013-06-17
[ 161 ]  
 
Comments and Proposed update OAM Process descriptions for draft G.8121.2     Fujitsu Limited   Q10/15   2013-06-17
[ 160 ]  
 
Proposed re-structure of Clause 8.8.3 for draft G.8121.2     Fujitsu Limited   Q10/15   2013-06-17
[ 159 ]  
 
Proposed update items to draft G.8121.1 (Clause 8 and 9)     Fujitsu Limited   Q10/15   2013-06-17
[ 158 ]  
(Rev.1) 
Proposed Definitions and Abbreviations to draft G.8121.1     Fujitsu Limited   Q10/15   2013-06-17
[ 157 ]  
 
Comments and proposed update for draft revised G.8121     Fujitsu Limited   Q10/15   2013-06-17
[ 156 ]  
 
Proposed MPLS-TP Linear protection models for Appendix in G.8121     Fujitsu Limited   Q9/15, Q10/15   2013-06-17
[ 155 ]  
 
Comments on draft G.808.2     Fujitsu Limited   Q9/15   2013-06-17
[ 154 ]  
 
Consideration on the notification of availability for ODU SMP     Fujitsu Limited   Q9/15   2013-06-17
[ 153 ]  
 
Extension to G.8273 Annex B to address the combined 'PRTC + T-GM' case     Calnex Solutions Limited , Deutsche Telekom AG   Q13/15   2013-06-16
[ 152 ]  
 
G.8260 & G.8273: Practical considerations in doing Constant Time Error measurements.     Calnex Solutions Limited   Q13/15   2013-06-16
[ 151 ]  
 
The consideration on the interface between SDN controller and transport NE     China Telecommunications Corporation   Q14/15, Q12/15   2013-06-16
[ 150 ]  
 
The consideration on the relationship between the network operating system (OS) in SDN and EMS/NMS in transport network     China Telecommunications Corporation   Q14/15, Q12/15   2013-06-16
[ 149 ]  
 
Use cases for transport SDN     China Telecommunications Corporation   Q14/15, Q12/15   2013-06-16
[ 148 ]  
 
Proposal on initiating a new work item on transport SDN     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Telecom Italia S.p.A. , ZTE Corporation   Q14/15, Q12/15   2013-06-16
[ 147 ]  
 
T-GM: types, PRTC integration and performance     A1 Telekom Austria AG , China Mobile Communications Corporation , Deutsche Telekom AG , Orange   Q13/15   2013-06-16
[ 146 ]  
 
Consideration on per-OCh monitor function for OTN beyond 100G interface     KDDI Corporation   Q11/15   2013-06-16
[ 145 ]  
 
ODU SMP Activation Time     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
[ 144 ]  
 
Improved Encoding/processing of Messages for 1-Stage ODU SMP Protocol     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
[ 143 ]  
 
Determining the Time Position of Upstream Probe Sequence     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 142 ]  
 
G.fast: On Discontinuous Operation     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 141 ]  
 
On Transition From L2.2 to Other States     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
Results:440 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-28