International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:440 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 290 ]  
(Rev.1) 
2013-06-17 NEC Corporation   Proposal to update Figure 9-1 of G.8021     Q14/15, Q10/15  
[ 289 ]  
(Rev.1) 
2013-06-17 NEC Corporation   Proposed modification of PM terminologies in G.8021     Q10/15  
[ 288 ]  
(Rev.1) 
2013-06-17 NEC Corporation   Proposed correction of MAC DA specification in G.8013     Q9/15, Q10/15  
[ 287 ]  
(Rev.1) 
2013-06-17 NEC Corporation   Comments on the scope and some definitions of G.808.2     Q9/15  
[ 286 ]  
 
2013-06-17 Sckipio Technologies S.I. Ltd.   G.fast: TDD-frame and super-frame structure working text     Q4/15  
[ 285 ]  
 
2013-06-17 Panasonic Corporation   G.cmsr: Interfacing with G.9903     Q15/15  
[ 284 ]  
(Rev.1) 
2013-06-17 Deutsche Telekom AG   Q13/15 Synchronization Requirements Structure     Q13/15  
[ 283 ]  
 
2013-06-17 Marvell Semiconductor Inc.   G.hn: Update of G.9961 Amendment 2 to complete "Test Vectors" section     Q18/15  
[ 282 ]  
 
2013-06-17 AT&T, Inc.   WDM for Metro and Backhaul     Q6/15  
[ 281 ]  
(Rev.1) 
2013-06-17 Corning Incorporated   Proposed revisions to ITU-T Recommendation G.652     Q6/15, Q5/15, Q2/15  
[ 280 ]  
 
2013-06-17 Lantiq Beteiligungs-GmbH & Co. KG , Sckipio Technologies S.I. Ltd.   G.fast: Scrambler working text     Q4/15  
[ 279 ]  
 
2013-06-17 Telecom Italia S.p.A.   OSNR and DGD tolerance investigation for 100G DP-QPSK optical signals     Q6/15  
[ 278 ]  
 
2013-06-17 Alcatel-Lucent USA Inc.   Beyond 100G OTN relationships to IEEE Standardization Schedule     Q11/15  
[ 277 ]  
 
2013-06-17 Alcatel-Lucent USA Inc.   ODUflex hitless resizing beyond 100G     Q11/15  
[ 276 ]  
 
2013-06-17 Alcatel-Lucent USA Inc.   Multi-vendor IaDI     Q11/15  
[ 275 ]  
 
2013-06-17 Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd.   Re-arrangement times for G.8271.1 HRM topologies     Q13/15  
[ 274 ]  
 
2013-06-17 Sprint   Development of Slave Clock Specifications for Different Use Cases     Q13/15  
[ 273 ]  
 
2013-06-17 Alcatel-Lucent USA Inc.   Timing for standardization of OTN beyond 100G     Q6/15, Q11/15  
[ 272 ]  
(Rev.1) 
2013-06-17 Alcatel-Lucent USA Inc. , Sprint   Service Requirements for Manageable Synchronization Infrastructure     Q13/15  
[ 271 ]  
 
2013-06-17 Alcatel-Lucent USA Inc.   ODU SMP Signalling Options     Q9/15  
[ 270 ]  
 
2013-06-17 ZTE Corporation   Unified ONU power management     Q2/15  
[ 269 ]  
 
2013-06-17 Alcatel-Lucent USA Inc.   Availability/Outage times for ODUSMP     Q9/15  
[ 268 ]  
 
2013-06-17 ZTE Corporation   Activation in TWDM-PON system     Q2/15  
[ 267 ]  
 
2013-06-17 ZTE Corporation   Proposal for PLOAM messages for tuning function in NG-PON2 TC layer during normal operation     Q2/15  
[ 266 ]  
 
2013-06-17 China Mobile Communications Corporation , China Telecommunications Corporation , ZTE Corporation   Proposal to close the item 11 in G.987.3A2 living list with answer for "ANNEX" approach     Q2/15  
[ 265 ]  
 
2013-06-17 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.inp: Extension of ADSL L2 Link State Operation for Retransmission     Q4/15  
[ 264 ]  
 
2013-06-17 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.fast: Multi-Line PSD Mask Constraint     Q4/15  
[ 263 ]  
 
2013-06-17 China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   proposal for study on requirements for wavelength selective reflector in in-service fibre test system application     Q17/15  
[ 262 ]  
 
2013-06-17 Communication Line Products Association of Japan   Proposal to include vibration and shock test in G.976     Q8/15  
[ 261 ]  
 
2013-06-17 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.fast: Non-Linear Precoder Ordering     Q4/15  
[ 260 ]  
 
2013-06-17 OKI Electric Industry Company Ltd. (OKI)   A Communication framework for Smart Home     Q15/15  
[ 259 ]  
 
2013-06-17 Vitesse Semiconductor Corporation   G.8271.1 Appendix VI modifications for cTE classes [G.8271.1]     Q13/15  
[ 258 ]  
 
2013-06-17 Cisco Systems, Inc. , Vitesse Semiconductor Corporation   PTP Equipment Classification [G.8273.2, G.8273, G.8271.1]     Q13/15  
[ 257 ]  
 
2013-06-17 Nippon Telegraph and Telephone Corporation (NTT)   Proposed text for removed G.8032 appendices (for agreement)     Q9/15  
[ 256 ]  
 
2013-06-17 SIRTI S.p.A.   Scope and Table of Contents of the new Recommendation "Use of the global positioning system (GPS) to create a referenced network map"     Q17/15  
[ 255 ]  
 
2013-06-17 China Telecommunications Corporation , Huawei Technologies Co. Ltd.   OTUCn/ODUCn proposal after Q11/15's Feb 2013 meeting     Q11/15  
[ 254 ]  
 
2013-06-17 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd. , Infinera Corporation   N*100G flexible bit rate OTUCn proposal     Q11/15  
[ 253 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Static noise generation of G.8273.2     Q13/15  
[ 252 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Delay_Req Transmission Requirements in G.8275.1     Q13/15  
[ 251 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Proposals for G.8275.1     Q13/15  
[ 250 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Proposal for default value for offsetScaledLogVariance, for G.8275.1     Q13/15  
[ 249 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Discussion of Noise Tolerance in G.8273.2     Q13/15  
[ 248 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Proposal for Time Noise Transfer in G.8273.2     Q13/15  
[ 247 ]  
 
2013-06-17 Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG , Orange   Proposed Text for Method 3 of G.8263-Testing     Q13/15  
[ 246 ]  
 
2013-06-17 Huawei Technologies Co. Ltd.   Proposed Correction to Annex C of ITU-T Rec. O.172     Q13/15  
[ 245 ]  
 
2013-06-17 Huawei Technologies Co. Ltd.   PLL bandwidth requirement for G.8261.1 network limit test     Q13/15  
[ 244 ]  
 
2013-06-17 Huawei Technologies Co. Ltd.   Delay asymmetry test result using different traffic generation methods     Q13/15  
[ 243 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Proposals for Transient and Holdover Specifications for G.8273.2     Q13/15  
[ 242 ]  
 
2013-06-17 ADTRAN   G.fast: DRA Timing Requirements     Q4/15  
[ 241 ]  
 
2013-06-17 China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   The time noise generation of T-BC in G.8273.2     Q13/15  
Results:440 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-12-3