Contributions
[ AI/Question: Q2/11 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 200 ]
|
Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_SS_Req_CDIV v.1 [3GPP Release 10] "Communication Diversion (CDIV) using IP multimedia core network subsystem. Protocol specification"
|
A1 Telekom Austria AG
|
Q2/11
|
2015-03-20 |
|
[ 199 ]
|
Proposal to start a new work item: Q.39_SI_SS_Req_HOLD v.1 [3GPP Release 10] "Communication HOLD using IP multimedia core network subsystem. Protocol specification"
|
A1 Telekom Austria AG
|
Q2/11
|
2015-03-20 |
|
[ 198 ]
|
Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_SS_Req_HOLD v.1 [3GPP Release 10] "Communication HOLD using IP multimedia core network subsystem. Protocol specification"
|
A1 Telekom Austria AG
|
Q2/11
|
2015-03-20 |
|
[ 197 ]
|
Proposal to start a new work item: Q.39_SI_SS_Req_TIP_TIR v.1 [3GPP Release 10] "TIP and TIR using IP Multimedia core network subsystem. Protocol specification
|
A1 Telekom Austria AG
|
Q2/11
|
2015-03-20 |
|
[ 196 ]
|
Proposal for Consent draft new Recommendation ITU-T Q.39_SI_SS_Req_TIP_TIR v.1 [3GPP Release 10] "TIP and TIR using IP Multimedia core network subsystem. Protocol specification"
|
A1 Telekom Austria AG
|
Q2/11
|
2015-03-20 |
|
[ 195 ]
|
Proposal to start a new work item: Q.39_SI_SS_Req_OIP_OIR v.1 [3GPP Release 10] "OIP and OIR using IP Multimedia core network subsystem. Protocol specification"
|
A1 Telekom Austria AG
|
Q2/11
|
2015-03-20 |
|
[ 194 ]
|
Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_SS_Req_OIP_OIR v.1 [3GPP Release 10] "OIP and OIR using IP Multimedia core network subsystem. Protocol specification"
|
A1 Telekom Austria AG
|
Q2/11
|
2015-03-20 |
|
[ 181 ]
(Rev.1) |
Proposal to start a new work item: Q.39_SI_BC_Req v.1 [3GPP Release 10] "IP multimedia call control protocol based on the session initiation protocol and the session description protocol. Basic call. Requirements for user side and network side (V10.18.0)"
|
A1 Telekom Austria AG
|
Q2/11, Q11/11
|
2015-03-12 |
|
[ 180 ]
(Rev.1) |
Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_BC_Req v.1 [3GPP Release 10] "IP multimedia call control protocol based on the session initiation protocol and the session description protocol. Basic call. Requirements for user side and network side (V10.18.0)"
|
A1 Telekom Austria AG
|
Q2/11, Q11/11
|
2015-03-12 |
|
[ 157 ]
|
Proposal to update Q.CDIV
|
NEC Corporation
|
Q2/11
|
2014-06-26 |
|
[ 156 ]
|
Proposals for FG-M2M deliverables in SG11
|
National Institute of Information and Communications Technology (NICT)
,
NEC Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/11, Q10/11, Q1/11
|
2014-06-26 |
|
[ 115 ]
|
Consent ITU-T Q.ProGeoSMS Protocol for Open GeoSMS
|
OGC
|
Q2/11, Q1/11
|
2014-06-19 |
|
[ 89 ]
|
Proposal to update draft Q.OIP/OIR
|
NEC Corporation
|
Q2/11
|
2013-10-25 |
|
[ 79 ]
(Rev.1) |
Proposal of initiating a new Recommendation on Signalling Architecture and requirement for IP based Short Message Service
|
Ministry of Industry and Information Technology (MIIT)
|
Q2/11, Q1/11
|
2013-10-23 |
|
[ 42 ]
(Rev.1-2) |
Proposal to Consent OGC Open GeoSMS for ITU-T Recommendation
|
Open Geospatial Consortium (OGC)
|
Q2/11, Q11/11, Q10/11
|
2013-02-12 |
|
[ 39 ]
(Rev.1) |
Proposal to advance draft ITU-T Q.WebMidCall "Signalling Requirements for Web based Mid-call Service"
|
KT Corporation
|
Q2/11
|
2013-02-12 |
|
[ 34 ]
(Rev.1) |
Proposed draft Q.OIP/OIR
|
NEC Corporation
|
Q2/11
|
2013-02-12 |
|
[ 30 ]
(Rev.1) |
Proposal to start a new work item on "Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR)" (Q.TIP/TIR)
|
A1 Telekom Austria AG
|
Q3/11, Q2/11
|
2013-02-12 |
Results:68 total items. Result page:
Previous -
1 -
2
|
Multiple Document Download: Formats and Languages to be included (when available):