International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : WP 1,2,3,4/11 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  C (2013-11-07) 

ITU-T SG 11

Protocols and test specifications

Study Period 2013

Meeting  from 2013-11-07 to 2013-11-20

held in Uganda [Kampala]

Other Meetings : 2016-06-27  2016-04-29  2016-03-24  2015-12-02  2015-04-22  2014-11-21  2014-07-09  2014-02-21  2013-11-14  2013-06-21  2013-02-25 

Results:52 total items.
Result page:   -  1 - 2  -  Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 77 ]  
(Rev.1) 
Propose to add the scenarios for BNG's event and status notification to the service platform     Ministry of Industry and Information Technology (MIIT)   Q5/11   2013-10-23
[ 76 ]  
(Rev.1) 
Proposed text about message specification on Q.nacp.Nc     Electronics and Telecommunications Research Institute (ETRI)   Q7/11   2013-10-23
[ 75 ]  
 
Proposal to update draft Q.monitor_d section 6.4 in relation to " Battery parameters"     China Telecommunications Corporation   Q13/11   2013-10-22
[ 74 ]  
 
Proposal to update draft Q.monitor_d section 6.1 in relation to "Anomalies behaviour and event paramters" of device monitoring     China Telecommunications Corporation   Q13/11   2013-10-22
[ 73 ]  
 
Proposal to update draft Q.FW-Cloud-iop including "Cloud service measurement index"     China Telecommunications Corporation , Ministry of Public Infrastructure, Industries & Commerce   Q14/11   2013-10-22
[ 72 ]  
 
Proposal to update draft Q.TR-CCI by adding SPEC and VMware as testing activities     China Telecommunications Corporation   Q14/11   2013-10-22
[ 71 ]  
(Rev.1) 
Consideration of Managed & Distributed Server based A/V Conf. Service     Electronics and Telecommunications Research Institute (ETRI)   Q9/11   2013-10-22
[ 70 ]  
(Rev.1) 
Proposal for scenario and requirements on the orchestration function based on the cloud services     Beijing University of Posts and Telecommunications , China Unicom , Huawei Technologies Co. Ltd.   Q4/11   2013-10-21
[ 69 ]  
(Rev.1) 
Proposal for modification and comments of sub-clause 9.3 of Q.Supplement-SDN     Beijing University of Posts and Telecommunications , China Unicom , Huawei Technologies Co. Ltd.   Q4/11   2013-10-21
[ 68 ]  
(Rev.1) 
Proposal for scenario and requirements on East-West interface     Beijing University of Posts and Telecommunications , China Unicom , Huawei Technologies Co. Ltd.   Q4/11   2013-10-21
[ 67 ]  
 
Consideration on signalling requirements of control policy distribution related to service/user awareness and control in Q.SBNG     China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 66 ]  
 
Consideration on signalling requirements of user information report related to service/user awareness and control in Q.SBNG     China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 65 ]  
 
Consideration on signalling requirements of service/user awareness and control in Q.SBNG     China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 64 ]  
 
Propose to add an Annex B to cover the scenarios and requirements of network services' configuration to the BNG to Q.SBNG     Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 63 ]  
 
Propose to add Annex C to cover the scenarios and requirements of BNG's event and status notification to the service platform     Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 62 ]  
 
Propose to add the scenarios and requirements for Services' configuration on BNG     China , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 61 ]  
 
Propose to add the scenarios for Service route path, service combination for the Q.SBNG     China , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 60 ]  
(Rev.1) 
Proposed signalling scenarios in Q.IPv6UIP  
The original file [C-60] was removed as it was wrongly posted. [C-60 Rev.1] provides the correct submitted contribution.
 
Huawei Technologies Co. Ltd.   Q6/11   2013-10-21
[ 59 ]  
 
Proposed signalling requirements in Q.IPv6UIP     Huawei Technologies Co. Ltd.   Q6/11   2013-10-21
[ 58 ]  
 
Propose to add the scenarios of PTN in Q.SBAN     China Mobile , Huawei   Q4/11   2013-10-15
[ 57 ]  
(Rev.1) 
Conformance test specification for the terminating identification restriction using IP multimedia core network subsystem - Part 3: User side; Test Suite Structure and Test Purposes (TSS&TP) [candidate Q.3942.3 ' in the work programme it is wrongly identified as Q.3942.4]     A1 Telekom Austria AG , Deutsche Telekom AG   Q11/11   2013-10-12
[ 56 ]  
(Rev.1) 
Conformance test specification for the terminating identification restriction using IP multimedia core network subsystem - Part 2: Network side ; Test Suite Structure and Test Purposes (TSS&TP) [candidate Q.3942.2]     A1 Telekom Austria AG , Deutsche Telekom AG   Q11/11   2013-10-12
[ 55 ]  
(Rev.1) 
"Reference load profiles and background traffic load" (Q.39zz)     A1 Telekom Austria AG   Q10/11   2013-10-10
[ 54 ]  
(Rev.1) 
Draft technical report on counterfeiting     Ukrainian National Information Systems   Q8/11   2013-10-07
[ 53 ]  
(Rev.1) 
Proposal for an IMEI Global System for combating the trade in counterfeit mobile devices     Ukrainian National Information Systems   Q8/11   2013-10-04
[ 52 ]  
(Rev.1) 
The illegal trade in ICT - problems and solutions     Ukrainian National Information Systems   Q8/11   2013-10-04
[ 51 ]  
(Rev.1) 
Proposal to define mechanisms to counter the illegal trade in ICT     Ukrainian National Information Systems   Q8/11   2013-10-04
Results:52 total items.
Result page:   -  1 - 2  -  Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25