International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  C 

ITU-T SG 5

Environment and climate change

Study Period 2013

Results:43 total items.
Contributions  [ AI/Question: Q19/5 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 843 ]  
(Rev.1) 
Contribution on review of L.ENST1 overview of innovative energy storage for stationary equipment     Orange   Q19/5   2016-09-27
[ 842 ]  
 
Information on possible joint NWI with ETSI on multiple DCAC input ICT equipment     Orange   Q19/5   2016-09-27
[ 840 ]  
(Rev.1) 
Latest draft of L.ENST2 from joint ETSI EE/EE2 and ITU-T Q19/5 work     Orange   Q19/5   2016-09-27
[ 839 ]  
(Rev.1) 
Latest draft of L.ENST1 from joint ETSI EE/EE2 and ITU-T Q19/5 work     Orange   Q19/5   2016-09-27
[ 838 ]  
(Rev.1) 
Latest draft of L_renewable recorded from joint ETSI-ITU g2m of 27th sept     Orange   Q19/5   2016-09-27
[ 835 ]  
 
Recommendation L.ENST3supercap - Innovative energy storage technology for stationary use - Part 3: supercapacitor technology     Telecom Italia S.p.A.   Q19/5   2016-09-27
[ 830 ]  
 
Proposal of joint NWI with ETSI on Telecom site progressive migration towards 400VDC     Orange   Q19/5   2016-09-27
[ 781 ]  
(Rev.1) 
Proposal of a new recommendation on "Circuit architectures inside multiple AC or up to 400 VDC input ICT equipment"     Huawei Technologies Co., Ltd.   Q19/5   2016-09-24
[ 776 ]  
 
General considerations of Lithium ion battery for L.ENST2battery     Electronics and Telecommunications Research Institute (ETRI)   Q19/5   2016-09-23
[ 738 ]  
 
Proposal of application of LVDC (400Vdc) for Petarouter     Orange , Telecom Italia S.p.A.   Q19/5   2016-04-07
[ 731 ]  
(Rev.1) 
Proposal of activities for ITU-T SG5 next study period     Telecom Italia S.p.A.   Q19/5, Q17/5   2016-04-07
[ 700 ]  
(Rev.1) 
Proposal to L.architecture     Huawei Technologies Co., Ltd.   Q19/5   2016-04-06
[ 692 ]  
 
The first draft of L.ENST02 "Innovative Energy Storage systems technology for stationary use - Part 2 Battery"     Ministry of Industry and Information Technology (MIIT)   Q19/5   2016-04-06
[ 691 ]  
 
The first draft of L.GSNI "ICT solutions for telecom network infrastructure"     Ministry of Industry and Information Technology (MIIT)   Q19/5, Q17/5   2016-04-06
[ 650 ]  
(Rev.1) 
Orange view on self consumption of DC renewable energy and green storage     Orange   Q19/5   2015-09-29
[ 647 ]  
(Rev.1) 
Standard activity extracts from joint Q19/5 and ETSI EE2 GTM meeting report relative to L.DCmarking and L.renewable     Orange   Q19/5   2015-09-29
[ 645 ]  
(Rev.1) 
Report of the Q19/5 Rapporteur meeting between Q19/5 and ETSI EE2 (8-12 June 2015)     Orange   Q19/5   2015-09-29
[ 643 ]  
(Rev.1) 
Q19/5 rapporteurLastest L.renewable draft from joint Q19/5 and ETSI EE/EE2 work     Orange   Q19/5   2015-09-29
[ 642 ]  
(Rev.1) 
latest draft L.DCmarking     Orange   Q19/5   2015-09-29
[ 641 ]  
(Rev.1) 
NWI proposal for New alternative energy storage evaluatation TR or handbook     Orange   Q19/5   2015-09-29
[ 605 ]  
 
Proposal on AC and DC power feeding system solution in L.architecture     Ministry of Industry and Information Technology (MIIT)   Q19/5   2015-09-29
[ 589 ]  
 
Field of application for LVDC (380V) in Telecommunications sites     Telecom Italia S.p.A.   Q19/5   2015-09-28
[ 588 ]  
 
New IEC "Systems Evaluation Group 4 (SEG 4): - Low voltage direct current applications, distribution and safety for use in developed and developing economies" and ITU-T SG5- IEC SEG4 cooperation opportunities     Telecom Italia S.p.A.   Q19/5   2015-09-28
[ 552 ]  
(Rev.1) 
Colour and marking of DC cable in Republic of Korea     Korea (Rep. of)   Q19/5   2015-09-25
[ 502 ]  
 
Some standard review for proposed NWI colour/marking of DC cable for ICT power feeding     Orange   Q19/5   2014-11-25
[ 501 ]  
(Rev.1) 
New draft of L.renewable from Q19 rapporteur meeting of 15-19 sept 2014     Orange   Q19/5   2014-11-25
[ 500 ]  
 
Proposition of new work item on "Colour and marking of DC cable and connecting devices" (joint collaboration on NWI ETSI DES EE-0253)     Orange   Q19/5   2014-11-25
[ 480 ]  
(Rev.1) 
Consideration of reliability classifications in L.performance     Nippon Telegraph and Telephone Corporation (NTT)   Q19/5   2014-11-25
[ 442 ]  
 
Availability calculation for DC power feeding systems     Korea (Rep. of)   Q19/5   2014-11-25
[ 411 ]  
 
Proposal on L.performance     Ministry of Industry and Information Technology (MIIT)   Q19/5   2014-11-24
[ 289 ]  
(Rev.1) 
Contribution of Orange on Efficiency and Reliability chapter for L.performance     Orange   Q19/5   2014-05-06
[ 288 ]  
(Rev.1) 
List of possible bibliography references for L.performance and some analysis     Orange   Q19/5   2014-05-06
[ 285 ]  
(Rev.1) 
Drawings for L.renewable Q19 editors work     Orange   Q19/5   2014-05-06
[ 283 ]  
(Rev.1) 
Drawings for L.performance Q19 editors work     Orange   Q19/5   2014-05-06
[ 252 ]  
 
Reliability consideration of L.performance     Nippon Telegraph and Telephone Corporation (NTT)   Q19/5   2014-05-04
[ 251 ]  
 
Proposal on the scope of L.performance     Nippon Telegraph and Telephone Corporation (NTT)   Q19/5   2014-05-04
[ 250 ]  
 
Proposal on issues with connecting distributed power source to power feeding system and items of L.renewable     Nippon Telegraph and Telephone Corporation (NTT)   Q19/5   2014-05-04
[ 228 ]  
 
Proposal on arrangement of scopes of energy efficiency metrics related to work items in Q17     Nippon Telegraph and Telephone Corporation (NTT)   Q19/5, Q17/5   2014-05-01
[ 215 ]  
 
Comparative assessment method of 400VDC efficiency and reliability (L.performance)     Orange   Q19/5   2013-11-20
[ 180 ]  
 
Proposed modifications for L. architecture     Nippon Telegraph and Telephone Corporation (NTT)   Q19/5   2013-11-19
[ 86 ]  
 
Proposal to create a Focus Group on Smart and Sustainable Cities     Telecom Italia S.p.A. , Telefónica, S.A.   Q19/5, Q18/5, Q17/5, Q16/5, Q15/5, Q14/5, Q13/5   2013-01-18
[ 74 ]  
 
Proposal of Scope and basic system configuration for L.archtecture     Nippon Telegraph and Telephone Corporation (NTT)   Q19/5   2013-01-18
[ 6 ]  
 
Proposal on L.architecture contents     Ministry of Industry and Information Technology (MIIT)   Q19/5   2013-01-14
Results:43 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-23