International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Meeting 2013-01-29 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  TD-GEN (2013-01-29) 

ITU-T SG 5

Environment and climate change

Study Period 2013

Meeting  from 2013-01-29 to 2013-02-07

held in Switzerland [Geneva]

Other Meetings : 2016-10-10  2016-04-20  2015-10-12  2014-12-08  2014-07-23  2014-05-19  2013-12-02  [ 2013-01-29 ] 

Results:192 total items.
Result page:  Previous -  1 - 2 - 3 - 4
Temporary Documents  (GEN)   Documents / Contributions
 
Number 
Received Source Title Questions
[ 42-GEN ]  
 
2013-01-18 Chairman SG5   ITU-T Study Group 5 List of Editors     QALL/5  
[ 41-GEN ]  
 
2013-01-18 TSB   Information from JTC 1/SC 39     Q19/5, Q18/5, Q17/5, Q16/5, Q15/5, Q14/5, Q13/5  
[ 40-GEN ]  
 
2013-01-18 Chairman SG5   Q 14/5 Handbook Framework     Q14/5  
[ 39-GEN ]  
 
2013-01-18 Chairman SG5   Input from IEEE UPAMD P1823 chairman on P1823 used in gotomeeting 3rd December 2012     Q13/5  
[ 38-GEN ]  
 
2013-01-18 Chairman SG5   Status Report of Question 21/5 (now Question 13/5)     Q13/5  
[ 37-GEN ]  
 
2013-01-18 Chairman SG5   Q16/5 Status Report     Q16/5  
[ 36-GEN ]  
(Rev.1) 
2013-01-18 Chairman SG5   Second draft of recommendation of architecture of DC power feeding systems (L.architecture)     Q19/5  
[ 35-GEN ]  
(Rev.1) 
2013-01-18 Rapporteur Q19/5   Work progress and status report of Question 19/5 during interim period     Q19/5  
[ 34-GEN ]  
 
2013-01-18 Liaison rapporteur IEC TC111 WG4   Final draft of IEC TR 62725 Ed.1.0     Q18/5  
[ 33-GEN ]  
 
2013-01-15 Editors   Output of ITU-T L.methodology ICT projects produced at ITU-T Q18/5 e-meetings, 3 and 19 December 2012     Q18/5  
[ 32-GEN ]  
(Rev.1-12) 
2013-01-15 TSB   Draft time plan for the meeting of Study Group 5     QALL/5  
[ 31-GEN ]  
 
2012-12-18 Chairman SG5   Q16/5 e-meeting (7 December 2012)     Q16/5  
[ 30-GEN ]  
 
2012-12-18 FG DR&NRR   Incoming LS: Liaison answer on "Request to FG DR&NRR for information on climate change adaptation and ICTs"     Q15/5, Q14/5  
[ 29-GEN ]  
(Rev.1-3) 
2012-12-11 Chairman SG5   ITU-T Study Group 5 List of Representatives     QALL/5  
[ 28-GEN ]  
 
2012-12-11 Chairman SG5   Proposed Corrigendum to K.44     Q4/5  
[ 27-GEN ]  
 
2012-12-11 Broadband Forum   Incoming LS: Liaison on Recommendation L.ref: Energy efficiency reference values for telecommunication equipment and infrastructure     Q17/5  
[ 26-GEN ]  
 
2012-12-11 CEN-CENELEC Eco-CG   Incoming LS: ToR CEN-CENELEC Ecodesign Coordination Group     Q18/5, Q17/5, Q16/5, Q13/5  
[ 25-GEN ]  
 
2012-12-11 CEN/CENELEC/ETSI CG GDC   Incoming LS: Activities of the CEN/CENELEC/ETSI Coordination Group on Green Data Centres     Q17/5  
[ 24-GEN ]  
 
2012-12-11 ITU-R WPs 5A, 5B and 5C   Incoming LS: Impact from wired telecommunication (including PLT) on radiocommunication systems     QALL/5  
[ 23-GEN ]  
 
2012-12-11 JCA-Cloud   Incoming LS: Reply to LS on JCA Cloud on Cloud Computing Standard Roadmap     Q19/5, Q18/5, Q17/5, Q16/5, Q15/5, Q14/5, Q13/5  
[ 22-GEN ]  
 
2012-12-11 JCA-Cloud   Incoming LS: Invitation to contribute to the cloud computing roadmap population     Q19/5, Q18/5, Q17/5, Q16/5, Q15/5, Q14/5, Q13/5  
[ 21-GEN ]  
 
2012-12-11 FG Smart Cable   Incoming LS: LS on FG SmartCable activities and meetings     QALL/5  
[ 20-GEN ]  
 
2012-12-11 JCA-SG&HN   Incoming LS: Activities related to smart grid     Q19/5, Q18/5, Q17/5, Q16/5, Q15/5, Q14/5, Q13/5  
[ 19-GEN ]  
 
2012-12-11 ITU-D SG1   Incoming LS: Invitation to participate in and provide input to the work of the Correspondence Group on the Elaboration of a Working Definition of the Term "ICT"     QALL/5  
[ 18-GEN ]  
 
2012-12-11 ETSI TC EE   Incoming LS: Liaison to ITU-T SG5 on ETSI standard for Earthing and bonding of 400 VDC     Q5/5, Q19/5  
[ 17-GEN ]  
 
2012-12-11 JCA-COP   Incoming LS: Liaison to ITU-T Study Groups, ITU Sectors, TSAG, CWG-COP     QALL/5  
[ 16-GEN ]  
 
2012-12-11 JCA-IoT   Incoming LS: Internet of Things Work Plan     QALL/5  
[ 15-GEN ]  
 
2012-12-11 ITU-R WP1/C   Incoming LS: Liaison statement to ITU-T SG5 on New Recommendation ITU-T K.91 (K.guide)     Q7/5  
[ 14-GEN ]  
 
2012-12-11 ITU-D Q23/1   Incoming LS: Strategies and policies concerning human exposure to electromagnetic fields     QALL/5  
[ 13-GEN ]  
 
2012-12-11 FG DR&NRR   Incoming LS: Establishment of Focus Group on Disaster Relief Systems, Network Resilience and Recovery     QALL/5  
[ 12-GEN ]  
 
2012-12-11 ITU-R WP1B   Incoming LS: Involvement of the ITU-R WP 1B in the activities on narrow-band wireless home networking (NWHN)     Q8/5  
[ 11-GEN ]  
 
2012-12-11 ITU-R WP1A   Incoming LS: Developments on coexistence of wired telecommunication (including PLT) and radiocommunication systems     QALL/5  
[ 10-GEN ]  
 
2012-12-11 JCA-IoT   Incoming LS: Liaison Statement to all ITU-T Study Groups on participation to IoT-GSI events     QALL/5  
[ 9-GEN ]  
 
2012-12-11 ITU-T SG9   Incoming LS: Reply LS to ITU-R WP6A on coexistence of wired and wireless communications systems     Q8/5  
[ 8-GEN ]  
 
2012-12-11 ITU-T SG9   Incoming LS: Reply LS to ETSI ATTM-AT3 on work of ITU-T SG5 on K.mhn     Q8/5  
[ 7-GEN ]  
 
2012-12-11 ITU-T SG9   Incoming LS: Reply LS to SG 5 on draft new Recommendation K.mhn     Q8/5  
[ 6-GEN ]  
 
2012-12-11 ITU-T SG9   Incoming LS: Reply LS to JCA-CIT on draft document on Conformance and Interoperability Testing needs     QALL/5  
[ 5-GEN ]  
 
2012-12-11 ITU-R WP6A   Incoming LS: Coexistence of wired and wireless communications systems     Q8/5  
[ 4-GEN ]  
(Rev.1) 
2012-12-06 Chairman SG5   Draft agenda and timetable for Working Party 3/5 meeting     Q19/5, Q18/5, Q17/5, Q16/5, Q15/5, Q14/5, Q13/5  
[ 3-GEN ]  
 
2012-12-06 Chairman SG5   Draft agenda and timetable for Working Party 2/5 meeting     Q9/5, Q8/5, Q7/5, Q6/5, Q11/5, Q10/5  
[ 2-GEN ]  
 
2012-12-06 Chairman SG5   Draft agenda and timetable for Working Party 1/5 meeting     Q5/5, Q4/5, Q3/5, Q2/5, Q1/5  
[ 1-GEN ]  
(Rev.1-5) 
2012-12-06 Chairman SG5   Draft agenda for Study Group 5 meeting     QALL/5  
Results:192 total items.
Result page:  Previous -  1 - 2 - 3 - 4  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-5-28