International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 3 : Meeting 2013-05-27 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 3  TD (2013-05-27) 

ITU-T SG 3

Economic and policy issues

Study Period 2013

Meeting  from 2013-05-27 to 2013-05-31

held in Switzerland [Geneva]

Other Meetings : 2016-02-22  2015-03-16  2014-05-26  [ 2013-05-27 ] 

Results:43 total items.
Temporary Documents  (PLEN)  [ Questions: QALL/3 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 84-PLEN ]  
(Rev.1) 
2013-05-31 BDT   Outcomes of the ITU Regional Forum for Arab Region: IMT Systems Technology, Evolution and Implementation     QALL/3  
[ 83-PLEN ]  
 
2013-05-31 Chairman of SG3   LS/o to JCA-AHF on nomination of a representatives [to ITU-T Study Groups, TSAG and ITU-R Study Groups] in the JCA-AHF     QALL/3  
[ 82-PLEN ]  
 
2013-05-31 Chairman of SG3   LS/o on request to provide security contacts from SG17     QALL/3  
[ 81-PLEN ]  
(Rev.1) 
2013-05-31 ITU-SG3   LS/o - Response to SG2 request regarding holding back to back meetings     QALL/3  
[ 80-PLEN ]  
(Rev.1) 
2013-05-31 Chairman of Study Group 3   Chairman's Discussion Paper on Working Methods and Structure of SG3     QALL/3  
[ 77-PLEN ]  
(Rev.1) 
2013-05-30 Chairman of SG3   List of rapporteurs and ad-hoc groups PLEN     QALL/3  
[ 76-PLEN ]  
(Rev.1) 
2013-05-30 Chairman SG3   Dates for future meetings     QALL/3  
[ 75-PLEN ]  
 
2013-05-30 ITU-T SG3   LS/o to SG2 on Telecommunication Management and OAM Project Plan     QALL/3  
[ 74-PLEN ]  
 
2013-05-30 ITU-T SG3   LS/o to JCA-IoT on Internet of things workplan     QALL/3  
[ 73-PLEN ]  
 
2013-05-30 ITU-T SG3   LS/o to JCA-COP on Child online protection activity     QALL/3  
[ 72-PLEN ]  
 
2013-05-30 ITU-T SG3   LS/o to JCA-SG&HN on activities related to smart grid     QALL/3  
[ 71-PLEN ]  
 
2013-05-29 Chairman SG3   List of Orphaned/Dormant Recommendations for SG3     QALL/3  
[ 64-PLEN ]  
 
2013-05-28 ITU   Summary of Outcomes of WTPF     QALL/3  
[ 62-PLEN ]  
 
2013-05-27 TSB   Mailing Lists for SG3     QALL/3  
[ 61-PLEN ]  
 
2013-05-27 WTPF Chairman   Chairman's Report on WTPF     QALL/3  
[ 57-PLEN ]  
 
2013-05-23 Joint Coordination Activity on Accessibility and H   LS/i on nomination of JCA-AHF representatives [from JCA-AHF]     QALL/3  
[ 56-PLEN ]  
(Rev.1-2) 
2013-05-20 TSB   List of Contributions     QALL/3  
[ 48-PLEN ]  
 
2013-05-08 SG3 Chairman, SG2 Chairman   Areas for cooperation between SG2 and SG3 following WTSA-12 Resolutions     QALL/3  
[ 47-PLEN ]  
(Rev.1) 
2013-05-07 TSB   List of work items for Study Group 3     QALL/3  
[ 46-PLEN ]  
 
2013-05-02 FG-DR&NRR   LS/i on status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery [from FG-DR&NRR]     QALL/3  
[ 45-PLEN ]  
 
2013-05-01 ITU-T SG17   LS/i on request to provide security contacts [from SG17]     QALL/3  
[ 44-PLEN ]  
 
2013-05-01 ITU-T SG17   LS/i on continuation of JCA-COP with revised ToR to TSAG [from SG17]     QALL/3  
[ 43-PLEN ]  
 
2013-05-01 ITU-T SG17   LS/i on continuation of JCA-IdM with revised ToR to TSAG [from SG17]     QALL/3  
[ 42-PLEN ]  
 
2013-05-01 IETF IAB   LS/i on appointment of a new IETF Liaison Manager to the ITU-T from IETF IAB [form IETF IAB]     QALL/3  
[ 41-PLEN ]  
 
2013-05-01 ITU-T SG13   LS/i on plans for implementation of Resolution 77 and recommendations to TSAG [from SG13]     QALL/3  
[ 38-PLEN ]  
 
2013-04-25 SG3RG-AFR   Subjects for consideration     QALL/3  
[ 37-PLEN ]  
 
2013-05-16 SG3RG-AFR   Draft guidelines for annex/supplement of D.50     QALL/3  
[ 36-PLEN ]  
 
2013-04-18 TSB   WTSA-12 and WCIT-12: Significant items of relevance for the work of Study Group 3     QALL/3  
[ 32-PLEN ]  
(Rev.1) 
2013-03-25 ITU-T SG2   LS/i/r JCA-COP on its formation and invitation to nominate representatives from ITU-T study groups, to participate in the work of JCA-COP in the future (JCA-COP - LS 001 - E) [from ITU-T SG2]     QALL/3  
[ 31-PLEN ]  
 
2013-03-13 ITU-T SG2   LS/i on Telecommunication Management and OAM Project Plan [from ITU-T SG2]     QALL/3  
[ 30-PLEN ]  
 
2013-03-13 ITU-T SG2   LS/i on implementing WTSA-12 Resolution 2 Annex B (Back to back meetings of SG2 and SG3) [from ITU-T SG2]     QALL/3  
[ 29-PLEN ]  
 
2013-03-12 JCA-SG&HN   LS/i on activities related to smart grid [from JCA-SG¬HN]     QALL/3  
[ 24-PLEN ]  
 
2013-03-12 JCA-COP   LS/i to ITU-T Study Groups, ITU Sectors, TSAG, CWG-COP on creation of JCA-COP [from JCA-COP] JCA-COP     QALL/3  
[ 23-PLEN ]  
 
2013-03-12 JCA-IoT   LS/i - Internet of Things Work Plan [from JCA-IoT]     QALL/3  
[ 21-PLEN ]  
 
2013-01-11 TSB   Report of the 2013 SG3RG-AO meeting     QALL/3  
[ 20-PLEN ]  
 
2013-01-11 TSB   Report of the 2013 SG3RG-AFR meeting     QALL/3  
[ 19-PLEN ]  
 
2013-01-11 TSB   Report of the 2013 SG3RG-LAC meeting     QALL/3  
[ 18-PLEN ]  
 
2013-01-11 TSB   WCIT-12 Highlights     QALL/3  
[ 17-PLEN ]  
 
2013-01-11 TSB   WTSA-12 highlights     QALL/3  
[ 4-PLEN ]  
(Rev.1) 
2013-01-11 TSB   List of participants     QALL/3  
[ 3-PLEN ]  
 
2013-01-11 TSB   List of incoming liaison statements     QALL/3  
[ 2-PLEN ]  
 
2013-01-11 TSB   Draft timetable and room allocation     QALL/3  
[ 1-PLEN ]  
(Rev.1-2) 
2013-01-11 SG3 Chairman   Draft Agenda     QALL/3  
Results:43 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-8-25