International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : TSB : Circulars  Recently posted -  Search Meeting Documents
   
ITU-T TSB  CIR 

ITU-T TSB

Telecommunication Standardization Sector

Study Period 2009

Results:27 total items.
Circulars  [ Destination: T09-SG15 ] 
 
Number 
Title Source Destination Date
[ 314 ]  
 
Approval of revised Recommendation ITU-T G.8121/Y.1381, ITU-T G.9956 (2011) Cor.1, and ITU T G.9961 (2010) Amd.1     SG 15   SG15   2012-10-04
[ 294 ]  
 
Tutorial for Rapporteurs and Editors, Geneva, 6 and 7 September 2012     TSB   SG02, SG03, SG05, SG09, SG11, SG13, SG15   2012-06-20
[ 289 ]  
 
Meeting of Study Group 15 with a view to approving draft Amendment 1 to Recommendation ITU-T G.9955 (2011) in accordance with the provisions of Resolution 1, Section 9, of WTSA (Johannesburg, 2008); Geneva, 21 September 2012     SG 15   SG15   2012-06-06
[ 281 ]  
 
Creation of a new Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR); First meeting of the FG-DR&NRR, Geneva, Switzerland, 25-27 June 2012     TSB   SG02, SG05, SG13, SG15, SG17, TSAG   2012-05-10
[ 274 ]  
 
Deletion of Recommendations ITU-T L.15, L.42, L.52 and L.65     SG 15   SG15   2012-03-30
[ 257 ]  
 
Non-approval of new Recommendation ITU-T G.8113.2/Y.1372.2     SG 15   SG15   2012-02-01
[ 256 ]  
 
Non-approval of new Recommendations ITU-T G.8113.1 and ITU-T G.9980     SG 15   SG15   2012-02-01
[ 249 ]  
 
Approval of new Recommendation ITU-T G.9963; revised Recommendations ITU-T G.993.2, ITU-T G.8110.1/Y.1370.1 and ITU-T G.9960; and ITU-T G.993.5 Amd.1, ITU-T G.994.1 Amd.8, ITU-T G.997.1 Amd.4, ITU-T G.998.4 Cor.3 and ITU-T G.9961 Cor.1     SG 15   SG15   2012-01-17
[ 248 ]  
 
Approval of new Recommendations ITU-T G.9955 and ITU-T G.9964     SG 15   SG15   2012-01-17
[ 246 ]  
 
Proposed deletion of Recommendations ITU-T L.15, L.42, L.52 and L.65, agreed to by ITU-T Study Group 15 at its meeting on 16 December 2011     SG 15   SG15   2011-12-23
[ 245 ]  
 
Deletion of Recommendation ITU-T G.995.1     SG 15   SG15   2011-12-23
[ 232 ]  
 
Proposed deletion of Recommendation ITU-T G.995.1, agreed to by Study Group 15 at its meeting on 16 September 2011     SG15   SG15   2011-09-21
[ 231 ]  
+Corr.1 
Meeting of Study Group 15 with a view to approving draft new Recommendations ITU-T G.9964 in accordance with the provisions of Resolution 1, Section 9, of WTSA (Johannesburg, 2008), Geneva, 16 December 2011  
The corrigendum applies to the English version only
 
SG 15   SG15   2011-09-16
[ 216 ]  
 
ITU Tutorial on Optical Fibres, Cables and Systems Recommendations (Mexico City, Mexico, 19-30 September 2011)     TSB   SG15   2011-08-03
[ 206 ]  
 
Deletion of Recommendation ITU-T L.16     SG 15   SG15   2011-07-13
[ 203 ]  
 
Meeting of Study Group 15 with a view to approving draft new Recommendations ITU-T G.9980, G.9955 and G.8113.1 in accordance with the provisions of Resolution 1, Section 9, of WTSA (Johannesburg, 2008), Geneva, 16 December 2011     SG 15   SG15   2011-06-23
[ 180 ]  
 
Proposed deletion of Recommendation ITU-T L.16, agreed to by Study Group 15 at its meeting on 25 February 2011     SG 15   SG15   2011-04-08
[ 173 ]  
 
Questionnaire on "Use of the global positioning system (GPS) to create a referenced network map"     SG 15   SG15   2011-05-12
[ 142 ]  
 
Questionnaire on "Technical considerations on protecting outside plant facilities from natural disasters"     SG 15   SG15   2010-09-30
[ 124 ]  
 
Approval of new Recommendations ITU-T G.998.4, ITU-T G.9961 and ITU-T G.9972, and of Amendment 1 and Corrigendum 1 to Recommendation ITU-T G.9960, and of Amendment 1 to Recommendation ITU-T G.9971     SG 15   SG15   2010-07-01
[ 99 ]  
 
Joint ITU-T/IEEE workshop on the future of Ethernet transport, Geneva, 28 May 2010     TSB   SG15   2010-03-26
[ 86 ]  
 
Questionnaire on "Optical cabling shared with multiple operators in buildings"     SG 15   SG15   2010-01-26
[ 85 ]  
+Corr.1 
Questionnaire on optical fibre identification technologies     SG 15   SG15   2010-01-26
[ 84 ]  
+Corr.1 
Questionnaire on cable ships and submersible equipments  
The corrigendum applies to the English version only
 
SG 15   SG15   2010-01-26
[ 66 ]  
 
Approval of new Recommendations ITU-T G.996.2(2009) Amd.1, G.999.1, G.9960     SG 15   SG15   2009-10-30
[ 15 ]  
+Corr.1 
Questionnaire on Optical fibre cables for drop applications  
The corrigendum applies to the Spanish version only.
 
SG 15   SG15   2009-01-22
[ 2 ]  
 
ITU-T Study Group 6 disbanded at WTSA-08 and its work reallocated to SG 15 and SG 5     SG 15   SG05, SG15   2008-11-11
Results:27 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-19