Temporary Documents
(GEN)
 |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 0309 ]
|
2011-12-21 |
Director, TSB
|
Study Group Structure
|
N/A
|
|
[ 0308 ]
+Add.1 |
2011-12-21 |
Director, TSB
|
TSB Director's Report: Highlights of 2011
|
N/A
|
|
[ 0307 ]
|
2011-12-21 |
Director, TSB
|
Kaleidoscope 2011
|
N/A
|
|
[ 0306 ]
|
2011-12-20 |
Chairman, Focus Group on Cloud Computing
|
Final Report of Focus Group on Cloud Computing to TSAG
|
N/A
|
|
[ 0305 ]
|
2011-12-20 |
Director, TSB
|
Draft TSB circular on Candidates for Chairmen and Vice-Chairmen of ITU-T study groups and TSAG for 2013-2016
|
N/A
|
|
[ 0304 ]
|
2011-12-20 |
Director, TSB
|
JCA, GSI, TSR - what they are, how they interwork, and some current issues
|
N/A
|
|
[ 0303 ]
|
2011-12-19 |
Director, TSB
|
Academia: Proposed rights for academia and TSB action plan
|
N/A
|
|
[ 0302 ]
|
2011-12-14 |
ITU-T Liaison Officer to JTC 1
|
iLS-Conclusions of the second ITU-T | JTC 1 joint leadership meeting, 6 November 2011
|
N/A
|
|
[ 0301 ]
|
2011-12-13 |
Asia-Pacific Telecommunity (APT)
|
iLS-Proposal on modification of ITU-T Recommendation A.7
|
N/A
|
|
[ 0300 ]
|
2011-12-13 |
ITU-T SG16
|
iLS-LS to TSAG and ITU-T SGs on pre-defined form to document the establishment of work items towards new Recommendations
|
N/A
|
|
[ 0299 ]
|
2011-12-13 |
ITU-T SG16
|
iLS-Reply LS to TSAG, JCA-CIT and ITU-T SGs on draft document on Conformance and Interoperability Testing (CIT) needs for review and comment by the Study Groups (JCA-CIT-LS4)
|
N/A
|
|
[ 0298 ]
|
2011-12-08 |
Director, TSB
|
Interim report on consultations regarding Resolution 178
|
N/A
|
|
[ 0297 ]
|
2011-12-02 |
Convener, JCA-AHF
|
iLS-LS from JCA-AHF on Meeting report of Joint Coordination Activity on Accessibility and Human Factors (JCA-AHF)
|
N/A
|
|
[ 0296 ]
|
2011-12-02 |
ITU-T Liaison Officer to JTC 1
|
Report of the ISO/IEC JTC 1 Plenary, 7-12 November 2011
|
N/A
|
|
[ 0295 ]
|
2011-11-29 |
ITU-T SG9
|
iLS-Reply to JCA-CIT (Ref: JCA-CIT-LS 4-E) on draft document on CIT needs
|
N/A
|
|
[ 0294 ]
|
2011-11-29 |
ITU-T SG9
|
iLS-Qualification of Japan Cable Laboratories according to ITU-T A.4 and A.5
|
N/A
|
|
[ 0293 ]
|
2011-11-25 |
Director, TSB
|
Electronic Working Methods Services and Database Applications
|
N/A
|
|
[ 0292 ]
|
2011-11-23 |
Director, TSB
|
Consideration of whether a revision to ITU-T A.4 is appropriate
|
N/A
|
|
[ 0291 ]
|
2011-11-18 |
Director, TSB
|
Bridging the Standardization Gap -Achievements and Planned Activities for 2012
|
N/A
|
|
[ 0290 ]
|
2011-11-16 |
ITU-T SG12
|
iLS-Experience with Direct Document Posting (DDP)
|
N/A
|
|
[ 0289 ]
|
2011-11-16 |
ITU-T SG12
|
iLS-Extension of the lifetime of FG CarCOM
|
N/A
|
|
[ 0288 ]
|
2011-11-16 |
ITU-T SG12
|
iLS-Revised ToR and extended lifetime of Focus Group on Driver Distraction
|
N/A
|
|
[ 0287 ]
|
2011-11-16 |
ITU-T SG12
|
iLS-Reply to "Draft Handbook on Network performance testing and control monitoring for guarantee required QoS for NGN services" (Ref: COM 11 - LS 76 -E)
|
N/A
|
|
[ 0286 ]
|
2011-11-14 |
Director, TSB
|
CTO (Chief Technology Officer) Meeting 2011
|
N/A
|
|
[ 0285 ]
|
2011-11-09 |
Director, TSB
|
Draft four-year Rolling Operational Plan for the 2012 to 2015 timeframe
|
N/A
|
Results:110 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):