Contributions
[ Source: NTT ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1556 ]
(Rev.1) |
Information and proposal on MPI measurement
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2011-11-18 |
|
[ 1547 ]
(Rev.1) |
Proposal on Questions of Q5/15 for next study period
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2011-11-18 |
|
[ 1546 ]
(Rev.1) |
Comments and proposal on revision of G.657
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2011-11-18 |
|
[ 1532 ]
|
Cost estimation of type X and proposal of new N:1 PON protection scheme
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2011-11-17 |
|
[ 1449 ]
|
Further consideration of requirements for on-demand segment monitoring in MPLS-TP
|
NTT
,
Telecom Italia
|
Q12/15, Q10/15
|
2011-02-02 |
|
[ 1448 ]
|
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP
|
NTT
|
Q12/15, Q10/15
|
2011-02-02 |
|
[ 1447 ]
|
Proposal for additional delay measurement functions in MPLS-TP OAM
|
NTT
|
Q9/15, Q14/15, Q10/15
|
2011-02-02 |
|
[ 1446 ]
|
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP
|
NTT
|
Q3/15, Q13/15
|
2011-02-02 |
|
[ 1401 ]
|
Improvement of Annex E/G.709 (40GbE/100GbE transport over OTN)
|
NTT
|
Q9/15, Q11/15
|
2011-02-01 |
|
[ 1376 ]
|
Proposed text for defining "in-profile" frames in Y.1731
|
NTT
,
NEC
|
Q10/15
|
2011-02-01 |
|
[ 1375 ]
(Rev.1) |
R-APS channels with different MAC-DA and same VID for identifying Ring-ID in G.8032
|
NTT
,
NSN
|
Q9/15
|
2011-02-01 |
|
[ 1366 ]
|
Adding dFOP-TO to G.8032
|
NSN
,
NTT
|
Q9/15
|
2011-02-01 |
|
[ 1316 ]
|
Proposal for G.epon
|
NTT
,
Mitsubishi
|
Q2/15
|
2011-02-01 |
|
[ 1284 ]
|
Proposal of subjects to be discussed regarding flexible grids
|
NTT
|
Q6/15
|
2011-01-31 |
|
[ 1270 ]
|
Proposal for OMCI in EPON
|
Mitsubishi
,
Ericsson
,
Hitachi
,
NTT
|
Q2/15
|
2011-01-31 |
|
[ 1226 ]
|
Comments on draft Recommendation L.coi
|
NTT
|
Q16/15
|
2011-01-31 |
|
[ 1225 ]
|
Draft new Recommendation L.aid "Aerial infrastructure design for optical access network"
|
NTT
|
Q18/15
|
2011-01-31 |
|
[ 1224 ]
|
Draft new Recommendation L.omtl "An optical fibre cable maintenance support, monitoring and testing system for optical fibre cable networks for trunk lines"
|
NTT
|
Q17/15
|
2011-01-31 |
|
[ 1223 ]
|
Information on MPI characteristics under various deployment conditions
|
NTT
|
Q5/15
|
2011-01-31 |
|
[ 981 ]
|
Extension of Appendix I/G.806 to include waveband switching
|
NTT
|
Q9/15
|
2010-05-20 |
|
[ 955 ]
|
R-APS channels with different MAC-DA and same VID for identifying Ring-ID in G.8032
|
NTT
|
Q9/15
|
2010-05-19 |
|
[ 954 ]
|
Proposed mechanism with DNI for end-to-end service resiliency in G.8032
|
NTT
,
NEC
|
Q9/15
|
2010-05-19 |
|
[ 944 ]
|
Proposal of extending solution for temporal and hitless pass segment monitoring and sending liaison to IETF
|
NTT
|
Q12/15, Q10/15
|
2010-05-19 |
|
[ 943 ]
|
Analyses and proposals for promoting early consent of G.tpoam
|
NTT
|
Q10/15
|
2010-05-19 |
|
[ 942 ]
|
Proposal of modification of IPG specification in GFP-T rate adaptation of full duplex Gigabit Ethernet in G.7041
|
NTT
|
Q11/15
|
2010-05-19 |
|
[ 923 ]
|
Proposal for a new Supplement regarding optical interface specifications for overclocked signals
|
Deutsche Telekom
,
NTT
|
Q6/15, Q11/15
|
2010-05-18 |
|
[ 922 ]
|
Proposal to initiate a new recommendation "Configuration Management for IP home network" based on G.9971
|
NTT
|
Q4/15, Q1/15
|
2010-05-18 |
|
[ 921 ]
|
Outline of a proposed new recommendation, Configuration Management for IP home network
|
NTT
|
Q4/15, Q1/15
|
2010-05-18 |
|
[ 920 ]
|
Information of optical fibre identification technology in Japan for appendix of L.ofid
|
NTT
|
Q17/15
|
2010-05-18 |
|
[ 919 ]
|
Proposal on draft text of Appendix II of L.pon
|
NTT
|
Q18/15
|
2010-05-18 |
|
[ 918 ]
|
Proposal on draft text of modified Appendix I of G.657
|
NTT
,
CPLAJ
|
Q5/15, Q16/15
|
2010-05-18 |
|
[ 917 ]
|
Information on failure characteristics under ultra-small bending
|
NTT
|
Q5/15, Q16/15
|
2010-05-18 |
|
[ 916 ]
|
Additional information on uniformity measurement, and proposed draft text of Appendix II of G.650.1
|
NTT
|
Q5/15
|
2010-05-18 |
|
[ 915 ]
|
Comments on the proposed revisions for G.650.1
|
NTT
,
CLPAJ
|
Q5/15
|
2010-05-18 |
|
[ 888 ]
|
Proposal for OMCI transport in Ethernet PON
|
Mitsubishi
,
Ericsson
,
HItachi
,
NTT
|
Q2/15
|
2010-05-18 |
|
[ 884 ]
|
Proposal to comprehensively classify modulation/demodulation and multiplex/demultiplex schemes used in optical transmission systems
|
NTT
|
Q6/15
|
2010-05-18 |
|
[ 853 ]
|
Proposed description of optical source for optical phase sensitive modulation/demodulation schemes used for high-speed large-capacity WDM transmission
|
NTT
|
Q7/15
|
2010-05-17 |
|
[ 595 ]
|
Proposed update of OTNT work plan
|
NTT
|
Q3/15
|
2009-09-18 |
|
[ 594 ]
|
Proposal of modification of MPLS-TP OAM requirements
|
NTT
|
Q10/15
|
2009-09-18 |
|
[ 593 ]
|
Proposal of additional MPLS-TP OAM requirements
|
NTT
|
Q10/15
|
2009-09-18 |
|
[ 592 ]
|
Proposal of definition of maintenance points (MEP and MIP)
|
NTT
|
Q12/15, Q10/15
|
2009-09-18 |
|
[ 577 ]
|
OTUk (k=3, 4) multi-channel parallel transport considering FEC
|
NTT
|
Q11/15
|
2009-09-18 |
|
[ 576 ]
|
Proposal for behaviour of RPL owner receiving an NR message with higher NODE_ID in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 575 ]
|
A set of methods for flushing FDB in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 574 ]
|
Support of protection mechanism in case of multi-ring network with double failures in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 573 ]
|
Clarification of state machine in case of Clear to remote MS/FS node in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 571 ]
|
Proposal for enhancements to Interconnection Flush logic in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 570 ]
|
Guidelines for configuration of VIDs and Ring-IDs of R-APS channels in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 545 ]
|
G.hntreq reflecting C-413 "Proposal of home network remote management requirements on G.hntreq"
|
NTT
,
Mitsubishi Electric
|
Q1/15
|
2009-09-18 |
|
[ 539 ]
|
Proposal for a revision of Recommendation G.696.1 for 100G application code
|
NTT
|
Q6/15
|
2009-09-18 |
Results:110 total items. Result page:
-
1 -
2 -
3
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):