International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:39 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: CATR ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1249 ]  
 
2011-01-31 CATR , China Mobile   PTN OAM upgrade from G.8114 to G-Ach+Y.1731 in China Mobile     Q10/15  
[ 1248 ]  
 
2011-01-31 CATR , China Mobile   PTN GACh+Y.1731 OAM interoperability test activities and result     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1235 ]  
 
2011-01-31 CMCC , CATR , ZTE   Proposal on maximum PTP clock number in the time reference model     Q13/15  
[ 1234 ]  
 
2011-01-31 CMCC , CATR , Huawei , ZTE   TOD specification     Q13/15  
[ 1124 ]  
 
2011-01-28 CMCC,CT , CATR   Structure and content of the MPLS-TP Recommendations     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1123 ]  
 
2011-01-28 CMCC, CT,CATR   Associated Channel Type for G.tpoam     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1090 ]  
 
2010-05-21 CATR , Huawei   SD triggered protection switching in G.8031     Q9/15  
[ 1070 ]  
 
2010-05-21 FiberHome , CATR , ZTE   1588v2 transmission by OSC over OTN     Q13/15, Q11/15  
[ 1067 ]  
 
2010-05-21 Symmetricom , CATR , CMCC   GPS timing receiver characterization     Q13/15, Q11/15  
[ 1066 ]  
 
2010-05-21 CMCC , CATR , ZTE   Analysis of time synchronization performance using PTP in hybrid transport network     Q13/15, Q11/15  
[ 1065 ]  
 
2010-05-21 CMCC , CATR , Huawei , ZTE   Proposal of accelerating MTIE and TDEV mask study for time synchronization     Q13/15  
[ 1064 ]  
 
2010-05-21 CMCC, ZTE, CATR   Proposal of research on link asymmetry compensation for PTP     Q13/15  
[ 1062 ]  
 
2010-05-21 CATR   Requirements for practical test setup and procedures specification for Measuring Arrangement to assess the degree of unbalance about earth     Q15/15  
[ 1061 ]  
 
2010-05-21 CATR   Proposal of revising for SSM message delay description in G.8264     Q13/15  
[ 1060 ]  
 
2010-05-21 CATR , Huawei   Objectives and Requirements for G.827x Recommendations     Q13/15  
[ 1059 ]  
 
2010-05-21 CATR   Functionality proposals about MPLS-TP OAM toolsets in G.tpoam     Q10/15  
[ 1057 ]  
 
2010-05-21 CATR   Some consideration with 40G intra-office interface parameters     Q6/15  
[ 1056 ]  
 
2010-05-21 CATR , Huawei   Proposal to include PDM-BPSK into 40G modulation formats in G.sup39     Q6/15  
[ 1055 ]  
 
2010-05-21 CATR   40G application code for G.698.2     Q6/15  
[ 1048 ]  
 
2010-05-22 CATR   Proposal to include PDM-BPSK into 40G modulation formats in G.sup39     Q6/15  
[ 1041 ]  
 
2010-05-20 ZTE , CATR , CMCC   Issues about metrics of network limits for time synchronization     Q13/15  
[ 1040 ]  
 
2010-05-20 ZTE , CATR , CMCC   Field test of 1588v2 time sync based on physical layer frequency sync support     Q13/15  
[ 1037 ]  
 
2010-05-20 ZTE , CATR , CMCC   1588v2 test results with different clock mode and field network     Q13/15  
[ 904 ]  
 
2010-05-18 Huawei , CATR , MII   G.827x Recommendations - High-Level Objectives     Q13/15  
[ 903 ]  
 
2010-05-18 Huawei , CATR , China Mobile Communications Corporation , MII   Pulse-Per-Second Interface     Q13/15  
Results:39 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2013-6-18