International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:578 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Next Next
Contributions  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2149 ]  
 
Comments on ODU SMP     Fujitsu Limited   Q9/15   2012-08-27
[ 2148 ]  
 
Proposal of the architectures for MPLS-TP linear protection     Fujitsu Limited   Q9/15   2012-08-27
[ 2147 ]  
 
Comments on G.8021.1     Fujitsu Limited   Q9/15   2012-08-27
[ 2145 ]  
 
Proposal for updated Table 7-1 in G.806     Fujitsu Limited   Q9/15   2012-08-27
[ 2144 ]  
 
Proposed text for the guidance to performance measurement by ETH OAM     Fujitsu Limited , NEC Corporation   Q9/15, Q14/15, Q10/15   2012-08-27
[ 2133 ]  
 
Correction of OAM "ETH-CSF"  
Withdrawn: Incorrect document uploaded.
 
FiberHome Technologies Group   Q9/15   2012-08-27
[ 2132 ]  
 
gsmp permanent 1 to 1 smp     FiberHome Technologies Group   Q9/15   2012-08-27
[ 2131 ]  
(Rev.1-2) 
example of state machine for SMP     China Unicom , FiberHome Technologies Group , ZTE Corporation   Q9/15   2012-08-27
[ 2115 ]  
 
Consideration of the CSF function on G.8021     NEC Corporation   Q9/15   2012-08-27
[ 2114 ]  
 
Clarification of APS protocol type on G.smp m:1 architecture     NEC Corporation   Q9/15   2012-08-27
[ 2113 ]  
 
Proposed text for the network connectivity in G.Supplement for G.8032     NEC Corporation   Q9/15   2012-08-27
[ 2107 ]  
 
OAM configuration examples for G.supplement for G.8032     Nippon Telegraph and Telephone Corporation (NTT)   Q9/15   2012-08-27
[ 2099 ]  
(Rev.1-2) 
Analysis and comparison on PTN ring protection proposals     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2012-08-26
[ 2098 ]  
(Rev.1-3) 
MPLS-TP Shared-Ring protection (MSRP) mechanism for ring topology     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2012-08-26
[ 2097 ]  
(Rev.1-2) 
PTN requirements on Ring protection  
Revision 2 of this Contribution is incorrectly titled; the correct title is: PTN requirements on Ring protection
 
China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2012-08-26
[ 2096 ]  
(Rev.1-2) 
Promoting progress of G.8131.1 MPLS-TP APS Linear Protection     China Mobile Communications Corporation; China   Q9/15   2012-08-26
[ 2087 ]  
 
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     PMC-Sierra, Inc.   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-25
[ 2072 ]  
 
Update to G.8021 for retrieval of on-demand intermediate measurements     Alcatel-Lucent Italia S.p.A. , Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2070 ]  
 
G.smp Objectives     Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2012-08-24
[ 2065 ]  
 
Proposed Input for G.smp Summary Clause re Capacity Efficiency     Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2061 ]  
(Rev.1-2) 
Proposed Input for G.smp Summary Clause re Mesh Topology Definition     Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2058 ]  
 
Misalignment among G.709, G.798 and G.872     Ciena Corporation   Q9/15, Q12/15, Q11/15   2012-08-24
[ 2056 ]  
 
Generic considerations for protection resource assignments in G.smp     Alcatel-Lucent USA Inc. , Ciena Corporation   Q9/15   2012-08-24
[ 2055 ]  
 
Distributed G.8031 proposal     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2054 ]  
 
Requirements of Control Plane/Management Plane to support SMP     Ciena Corporation   Q9/15   2012-08-24
[ 2052 ]  
 
Protection Interworking editorial comments     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2051 ]  
 
Bi-directional SMP Operation and Signalling Flow Sequence     Ciena Corporation   Q9/15   2012-08-24
[ 2049 ]  
 
Comments and clarifications on G.smp     Ciena Corporation   Q9/15   2012-08-24
[ 2048 ]  
 
G.odusmp Support of Both ODUj and ODUk Restoration     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2047 ]  
 
Use of CL-SNCG/S to simplify G.873.2 configurations     Ciena Corporation   Q9/15   2012-08-24
[ 2046 ]  
 
Not used  
Withdrawn by submitter
 
N/A   Q9/15   2012-08-24
[ 2045 ]  
 
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     AT&T, Inc. , Ciena Corporation   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-24
[ 2044 ]  
 
G.odusmp with TCM APS     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2041 ]  
 
G.smp multiple failure protection pre-emption     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2037 ]  
 
ODU SMP APS protocol considerations     Tellabs Oy   Q9/15   2012-08-24
[ 2036 ]  
 
Protection Interworking - Linear Protection Generic Models     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2035 ]  
 
Alignment of APS specifications in G.873.1, G.798, and G.709     Tellabs Oy   Q9/15, Q11/15   2012-08-24
[ 2034 ]  
 
Proposed appendix to G.798.1 concerning SNC implementation considerations     Tellabs Oy   Q9/15   2012-08-24
[ 2030 ]  
 
Update to the AIS Insert process in G.8121.2     Cisco Systems, Inc.   Q9/15   2012-08-24
[ 2029 ]  
 
Update to the AIS Insert process in G.8121     Cisco Systems, Inc.   Q9/15, Q14/15   2012-08-24
[ 2028 ]  
 
Proposed Text for adding Lock Instruct functions to G.8121.2     Cisco Systems, Inc.   Q9/15, Q14/15   2012-08-24
[ 2027 ]  
 
Proposed Text for adding Lock Instruct functions to G.8121     Cisco Systems, Inc.   Q9/15, Q14/15   2012-08-24
[ 2026 ]  
 
Proposed text for G.8121 Appendix describing PHB flows     Cisco Systems, Inc.   Q9/15   2012-08-24
[ 2025 ]  
 
Updates to G.8121.2 for alignment with G.8121     Cisco Systems, Inc.   Q9/15   2012-08-24
[ 2023 ]  
 
Terminology for Performance Monitoring in G.8013/Y.1731     Cisco Systems, Inc.   Q9/15, Q14/15, Q10/15   2012-08-24
[ 2021 ]  
 
Proposal for Updating External Commands     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2020 ]  
 
ODU SMP Protocol     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2019 ]  
 
ODU SMP Application Analysis     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2018 ]  
 
Editorial Suggestions for G.smp     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2017 ]  
 
Discussion and Update for ODU SMP Node Functional Model     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
Results:578 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25