Contributions
[ AI/Question: Q9/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2016 ]
|
Discussion and Proposal for Solving SMP Objectives Open Issues
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2001 ]
|
Text proposal to extend OCh_C function with flex grid capabilities
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-23 |
|
[ 1999 ]
|
Proposal to enhance text in clause 5.1/G.873.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-23 |
|
[ 1998 ]
|
Updating APS/PCC specifications in clause 15.8.2.4 of G.709, Table 7-1/G.873.1 and server to ODU (ODUkP to ODUj and OTUk[V] to ODUk) adaptation functions in G.798
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q11/15
|
2012-08-23 |
|
[ 1997 ]
|
Proposal to add ODUk APS access to OTUk[V]/ODUk_A functions
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-23 |
|
[ 1996 ]
|
Proposal for additional text describing ODU PM APS support for Client SNC/I protection in Appendix II/G.873.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-23 |
|
[ 1995 ]
|
Proposal for add I-NNI Type 3 ports to SWXC Type I and III in G.798.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-23 |
|
[ 1992 ]
(Rev.1) |
Inverse multiplexing for ODUS
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2012-08-23 |
|
[ 1991 ]
(Rev.1) |
Architecture Consideration for the extension of OTN Beyond 100G
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2012-08-23 |
|
[ 1990 ]
|
OTUk-AIS Clarifications
|
Altera Newfoundland Technology Centre (Altera NTC)
|
Q9/15, Q11/15
|
2012-08-22 |
|
[ 1989 ]
|
OTLAIS Removal from OTU AIS
|
Altera Newfoundland Technology Centre (Altera NTC)
|
Q9/15
|
2012-08-22 |
|
[ 1988 ]
|
ODUkT_TT_Sk STAT Defect Conditions
|
Altera Newfoundland Technology Centre (Altera NTC)
|
Q9/15
|
2012-08-22 |
|
[ 1978 ]
|
Comments on G.8032 Supplement
|
Ericsson Canada, Inc.
|
Q9/15
|
2012-08-22 |
|
[ 1977 ]
|
Comments on IEEE liaison on MECP
|
Ericsson Canada, Inc.
|
Q9/15
|
2012-08-22 |
|
[ 1971 ]
(Rev.1) |
Consolidation of G.873.1 and G.798 in respect to ODUk SNCP
|
Alcatel-Lucent Deutschland AG
|
Q9/15
|
2012-08-22 |
|
[ 1970 ]
(Rev.1) |
Backward compatible precise delay measurement method for OTN
|
Alcatel-Lucent Deutschland AG
|
Q9/15, Q11/15
|
2012-08-22 |
|
[ 1969 ]
|
G.873.1: Control of the Bridge for 1:N ODUk SNCP
|
Alcatel-Lucent Deutschland AG
|
Q9/15
|
2012-08-22 |
|
[ 1968 ]
|
G.873.1: Bidirectional Switching for ODUk SNCP
|
Alcatel-Lucent Deutschland AG
|
Q9/15
|
2012-08-22 |
|
[ 1967 ]
|
G.873.1: Usage of Reverse Request for bidirectional 1:n ODUk SNCP
|
Alcatel-Lucent Deutschland AG
|
Q9/15
|
2012-08-22 |
|
[ 1966 ]
|
Proposed New G.smp Appendix
|
Alcatel-Lucent Deutschland AG
|
Q9/15
|
2012-08-22 |
|
[ 1965 ]
|
Request for Response to OIF Liaison Statement (oif2012.265.02) a
|
Alcatel-Lucent USA Inc.
,
Xtera Communications, Inc.
|
Q9/15, Q14/15
|
2012-08-22 |
|
[ 1961 ]
|
Traffic Differentiation in Transport Networks
|
Ericsson UK
|
Q9/15, Q12/15
|
2012-08-16 |
|
[ 1960 ]
|
Self Configuring Networks
|
Ericsson UK
|
Q9/15
|
2012-08-16 |
|
[ 1959 ]
(Rev.1) |
Bandwidth- Load sharing
|
Ericsson UK
|
Q9/15
|
2012-08-16 |
|
[ 1957 ]
|
Examples for ODU SMP scenarios
|
Huawei Technologies Co. Ltd.
,
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2012-08-14 |
|
[ 1912 ]
|
Maintaining the common OTN functional model in draft revised G.872
|
Huawei Technologies Co. Ltd.
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1908 ]
|
Alignment of G.7044 and G.798
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1903 ]
(Rev.1) +Add.1 |
Differences between APS and PSC for MPLS-TP linear protection
|
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1901 ]
(Rev.1) |
Proposal of reconsideration for future planning of standardization for MPLS-TP related Recommendations
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1897 ]
(Rev.1) |
Consideration of approval of both MPLS-TP OAM Recommendations(G.8113.1 based on Ethernet and G.8113.2 based on MPLS)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1883 ]
|
Y.1731 extension for Throughput Measurement
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q10/15
|
2011-11-22 |
|
[ 1878 ]
(Rev.1) |
Further Consideration of the Enhancement of LMM/LMR to support proactive LM
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q10/15
|
2011-11-22 |
|
[ 1877 ]
(Rev.1) |
Another EOTN Equipment Type in G.798.1
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1876 ]
(Rev.1) |
Correction of ODUkP_TT and ODUkT_TT function in G.798
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1853 ]
(Rev.1) |
Alignment on dUNP between Y.1731 and G.8021
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15, Q14/15, Q10/15
|
2011-11-22 |
|
[ 1850 ]
(Rev.1) |
Proposed changes to G.8021 to avoid dLOC flapping
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15
|
2011-11-22 |
|
[ 1847 ]
|
China Propose to make progress on MPLS-TP OAM Standardization
|
China
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1844 ]
|
Requirements for L0/L1/L2 Multi-layer Convergence Network
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1843 ]
|
G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1839 ]
|
Proposed modifications to draft G.8032v3
|
AimValley BV
,
Alcatel-Lucent Bell N.V.
|
Q9/15
|
2011-11-22 |
|
[ 1838 ]
|
G.8021 and G.8051 updates to support MI specified in G.8031v3 as corrected and G.8032v3
|
Alcatel-Lucent Bell N.V.
|
Q9/15, Q14/15
|
2011-11-22 |
|
[ 1837 ]
|
Withdrawn - Duplicate of C-1838
Forthcoming
|
Alcatel-Lucent Bell N.V.
|
Q9/15, Q14/15
|
2011-11-22 |
|
[ 1836 ]
|
Clarification on the meaning of "top priority local request" for CLEAR, clearance of SF(-P) (or of SD if applicable), or expiration of WTR in G.8031
|
Alcatel-Lucent Bell N.V.
,
Orckit Corrigent
|
Q9/15
|
2011-11-22 |
|
[ 1830 ]
(Rev.1) |
Updated requirement description and proposed text for adaptive bandwidth scenario in G.808.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1829 ]
(Rev.1) |
Proposal to add ETH CL-SNCG/I protection to G.8031
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1822 ]
(Rev.1) |
Considerations about PTN and PSN applications for MPLS-TP
|
Italy
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1821 ]
(Rev.2) |
Considerations about collaboration between ITU-T and IETF on MPLS-TP
|
Italy
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1818 ]
(Rev.1) |
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1817 ]
(Rev.1) |
G.8021 editors contribution: OAM extraction process
|
Huawei Technologies Co. Ltd.
,
NEC Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1816 ]
(Rev.1) |
ODU SMP signalling considerations
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2011-11-22 |
Results:578 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):