International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:59 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Questions: Q4A/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 2389 ]  
 
2012-08-29 British Telecommunications Public Ltd. Co. (BT Plc)   Implementation of L2.bis modes in ADSL2Plus     Q4A/15  
[ 2380 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   G.fast: Minimum Duration of Transmission Opportunity     Q4A/15  
[ 2377 ]  
 
2012-08-28 Sckipio Technologies S.I. Ltd.   G.fast: Per-Frame MAP     Q4A/15  
[ 2365 ]  
 
2012-08-28 Futurewei Technologies US R&D Center   Discussion on G.poc upstream transmission     Q4A/15, Q2/15, Q1/15  
[ 2356 ]  
 
2012-08-28 Sckipio Technologies S.I. Ltd.   G.fast: Dynamic BW allocation     Q4A/15  
[ 2355 ]  
 
2012-08-28 Telefon AB - LM Ericsson   G.fast: Low Complexity FFT/IFFT Scheme     Q4A/15  
[ 2354 ]  
 
2012-08-28 Telefon AB - LM Ericsson   G.fast: New cable model for wiring type B05a, CAD55     Q4A/15  
[ 2353 ]  
 
2012-08-28 Sckipio Technologies S.I. Ltd.   G.fast: Are you willing to give up 6dB of performance gain???     Q4A/15  
[ 2352 ]  
 
2012-08-28 Telefon AB - LM Ericsson   G.fast: Updated measurements and modelling of CAD55 cable     Q4A/15  
[ 2350 ]  
 
2012-08-28 Sckipio Technologies S.I. Ltd.   G.fast: On the adaptation of the G.998.4 DTU format to G.fast     Q4A/15  
[ 2348 ]  
 
2012-08-28 Alcatel-Lucent Bell N.V.   G.fast: Principle Operations Of Layered Modulation     Q4A/15  
[ 2347 ]  
 
2012-08-28 Alcatel-Lucent Bell N.V.   G.gen: VDSL: G.ploam: Corrigendum on "INPMIN-ROC"     Q4A/15  
[ 2346 ]  
 
2012-08-28 Alcatel-Lucent Bell N.V.   VDSL: Amendment of Receiver Initiated SRA following an SOS procedure     Q4A/15  
[ 2345 ]  
 
2012-08-28 Alcatel-Lucent Bell N.V.   G.gen: VDSL: G.ploam: Reporting parameter "Actual AELE-MODE"     Q4A/15  
[ 2330 ]  
 
2012-08-28 British Telecommunications Public Ltd. Co. (BT Plc)   G.FAST: On TDD frame size     Q4A/15  
[ 2329 ]  
 
2012-08-28 British Telecommunications Public Ltd. Co. (BT Plc)   G.FAST: On LDPC versus RS+TC     Q4A/15  
[ 2328 ]  
 
2012-08-28 British Telecommunications Public Ltd. Co. (BT Plc)   G.FAST: On selection of RTX scheme     Q4A/15  
[ 2326 ]  
 
2012-08-28 British Telecommunications Public Ltd. Co. (BT Plc)   G.FAST: On dynamic asymmetry ratio     Q4A/15  
[ 2325 ]  
 
2012-08-28 British Telecommunications Public Ltd. Co. (BT Plc)   G.FAST: On managing FTTdp functional elements that may have intermitted powering     Q4A/15  
[ 2318 ]  
 
2012-08-28 A1 Telekom Austria AG , France Télécom Orange , Telecom Italia S.p.A. , TeliaSonera AB   G.fast: Mandatory support of 4096 sub-carriers     Q4A/15  
[ 2317 ]  
 
2012-08-28 British Telecommunications Public Ltd. Co. (BT Plc)   Extended RAM Option for Retransmission in VDSL2     Q4A/15  
[ 2316 ]  
(Rev.1) 
2012-08-28 British Telecommunications Public Ltd. Co. (BT Plc)   G.FAST: FTTdp Power Budget     Q4A/15  
[ 2315 ]  
 
2012-08-28 British Telecommunications Public Ltd. Co. (BT Plc)   Impact of Sources of Experimental Error on KL0 Determination     Q4A/15  
[ 2309 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   G.fast: On Net Coding Gain     Q4A/15  
[ 2302 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   G.fast: First DMT Symbol After Inactivity Period     Q4A/15  
[ 2301 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   G.vector: Extending maximum duration of O-P-VECTOR 1 signal     Q4A/15  
[ 2289 ]  
 
2012-08-28 The Netherlands Organisation for Applied Scientific Research (TN   G.Fast: Proposal to solve inconsistent terminology     Q4A/15  
[ 2283 ]  
 
2012-08-28 Marvell Semiconductor Inc.   G.fast: FEC simulation results with noise     Q4A/15  
[ 2282 ]  
 
2012-08-28 Marvell Semiconductor Inc.   G.fast: LDPC decoder feasibility     Q4A/15  
[ 2250 ]  
 
2012-08-28 Futurewei Technologies US R&D Center   G.fast: On-Line Reconfiguration - Revisited     Q4A/15  
[ 2236 ]  
 
2012-08-28 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: Performance of channel estimation methods     Q4A/15  
[ 2211 ]  
 
2012-08-28 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: On the channel estimation method     Q4A/15  
[ 2210 ]  
 
2012-08-27 Sckipio Technologies S.I. Ltd.   The effect of noise on channel estimation accuracy for multiple simultaneous estimations     Q4A/15  
[ 2209 ]  
 
2012-08-27 Sckipio Technologies S.I. Ltd.   Fast channel estimation scheme - overview     Q4A/15  
[ 2208 ]  
 
2012-08-27 Sckipio Technologies S.I. Ltd.   FEC blocks mapping to TDD-Frames     Q4A/15  
[ 2207 ]  
 
2012-08-27 Sckipio Technologies S.I. Ltd.   The need for additional pilots for the first symbol in a TDD-Frame     Q4A/15  
[ 2205 ]  
 
2012-08-27 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: Proposal to define pilot tones in G.fast     Q4A/15  
[ 2204 ]  
 
2012-08-27 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: On the number of latency paths in G.fast     Q4A/15  
[ 2203 ]  
 
2012-08-27 Lantiq Beteiligungs-GmbH & Co. KG   G.vector: Comments on 2012-06-4A-048 and upstream FDPS definition     Q4A/15  
[ 2202 ]  
 
2012-08-27 Lantiq Beteiligungs-GmbH & Co. KG   G.vector: Proposal on FDPS format     Q4A/15  
[ 2201 ]  
 
2012-08-27 Lantiq Beteiligungs-GmbH & Co. KG   G.vector: Proposal to allow pilot sequence length modification     Q4A/15  
[ 2200 ]  
 
2012-08-27 Lantiq Beteiligungs-GmbH & Co. KG   G.vector: Proposed FDPS-related text corrections for G.993.5     Q4A/15  
[ 2199 ]  
 
2012-08-27 Lantiq Beteiligungs-GmbH & Co. KG   G.ploam: Proposal for a corrigendum to G.997.1 Recommendation     Q4A/15  
[ 2198 ]  
 
2012-08-27 Lantiq Beteiligungs-GmbH & Co. KG   G.vector: Proposed text change for G.993.5 Recommendation     Q4A/15  
[ 2197 ]  
 
2012-08-27 ADTRAN   G.fast: Power Optimized G.fast Transmission     Q4A/15  
[ 2136 ]  
(Rev.1-2) 
2012-08-27 ZTE Corporation   A method to facilitate dynamic resource allocation(DRA)     Q4A/15  
[ 2125 ]  
 
2012-08-27 Broadcom Corporation   G.fast: FEC resilience tests results.     Q4A/15  
[ 2124 ]  
 
2012-08-27 Broadcom Corporation   G.vector: VCE vendor and version information in O-SIGNATURE     Q4A/15  
[ 2119 ]  
(Rev.1) 
2012-08-27 Lantiq Beteiligungs-GmbH & Co. KG   G.vector: Proposed text changes to address SRA when G.998.4 is enabled     Q4A/15  
[ 2088 ]  
 
2012-08-25 Ikanos Communications   G.fast: Proposed Definitions for G.fast PMD     Q4A/15  
Results:59 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-5-6