Français
Español
Home
:
ITU-T
:
SG15
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG15 C
ITU-T SG15
Max # of documents displayed/page:
Transport network structures
Study Period 2009
Results:
59
total items.
Result page:
1
-
2
-
3
-
Next
Contributions
[ Questions: Q4A/15 ]
Number
Received
Source
Title
Questions
[ 2389 ]
2012-08-29
British Telecommunications Public Ltd. Co. (BT Plc)
Implementation of L2.bis modes in ADSL2Plus
Q4A/15
[ 2380 ]
2012-08-28
Huawei Technologies Co. Ltd.
G.fast: Minimum Duration of Transmission Opportunity
Q4A/15
[ 2377 ]
2012-08-28
Sckipio Technologies S.I. Ltd.
G.fast: Per-Frame MAP
Q4A/15
[ 2365 ]
2012-08-28
Futurewei Technologies US R&D Center
Discussion on G.poc upstream transmission
Q4A/15
,
Q2/15
,
Q1/15
[ 2356 ]
2012-08-28
Sckipio Technologies S.I. Ltd.
G.fast: Dynamic BW allocation
Q4A/15
[ 2355 ]
2012-08-28
Telefon AB - LM Ericsson
G.fast: Low Complexity FFT/IFFT Scheme
Q4A/15
[ 2354 ]
2012-08-28
Telefon AB - LM Ericsson
G.fast: New cable model for wiring type B05a, CAD55
Q4A/15
[ 2353 ]
2012-08-28
Sckipio Technologies S.I. Ltd.
G.fast: Are you willing to give up 6dB of performance gain???
Q4A/15
[ 2352 ]
2012-08-28
Telefon AB - LM Ericsson
G.fast: Updated measurements and modelling of CAD55 cable
Q4A/15
[ 2350 ]
2012-08-28
Sckipio Technologies S.I. Ltd.
G.fast: On the adaptation of the G.998.4 DTU format to G.fast
Q4A/15
[ 2348 ]
2012-08-28
Alcatel-Lucent Bell N.V.
G.fast: Principle Operations Of Layered Modulation
Q4A/15
[ 2347 ]
2012-08-28
Alcatel-Lucent Bell N.V.
G.gen: VDSL: G.ploam: Corrigendum on "INPMIN-ROC"
Q4A/15
[ 2346 ]
2012-08-28
Alcatel-Lucent Bell N.V.
VDSL: Amendment of Receiver Initiated SRA following an SOS procedure
Q4A/15
[ 2345 ]
2012-08-28
Alcatel-Lucent Bell N.V.
G.gen: VDSL: G.ploam: Reporting parameter "Actual AELE-MODE"
Q4A/15
[ 2330 ]
2012-08-28
British Telecommunications Public Ltd. Co. (BT Plc)
G.FAST: On TDD frame size
Q4A/15
[ 2329 ]
2012-08-28
British Telecommunications Public Ltd. Co. (BT Plc)
G.FAST: On LDPC versus RS+TC
Q4A/15
[ 2328 ]
2012-08-28
British Telecommunications Public Ltd. Co. (BT Plc)
G.FAST: On selection of RTX scheme
Q4A/15
[ 2326 ]
2012-08-28
British Telecommunications Public Ltd. Co. (BT Plc)
G.FAST: On dynamic asymmetry ratio
Q4A/15
[ 2325 ]
2012-08-28
British Telecommunications Public Ltd. Co. (BT Plc)
G.FAST: On managing FTTdp functional elements that may have intermitted powering
Q4A/15
[ 2318 ]
2012-08-28
A1 Telekom Austria AG
,
France Télécom Orange
,
Telecom Italia S.p.A.
,
TeliaSonera AB
G.fast: Mandatory support of 4096 sub-carriers
Q4A/15
[ 2317 ]
2012-08-28
British Telecommunications Public Ltd. Co. (BT Plc)
Extended RAM Option for Retransmission in VDSL2
Q4A/15
[ 2316 ]
(Rev.1)
2012-08-28
British Telecommunications Public Ltd. Co. (BT Plc)
G.FAST: FTTdp Power Budget
Q4A/15
[ 2315 ]
2012-08-28
British Telecommunications Public Ltd. Co. (BT Plc)
Impact of Sources of Experimental Error on KL0 Determination
Q4A/15
[ 2309 ]
2012-08-28
Huawei Technologies Co. Ltd.
G.fast: On Net Coding Gain
Q4A/15
[ 2302 ]
2012-08-28
Huawei Technologies Co. Ltd.
G.fast: First DMT Symbol After Inactivity Period
Q4A/15
Results:
59
total items.
Result page:
1
-
2
-
3
-
Next
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2013-5-19