Contributions
[ Source: ZTE ] [ Questions: Q13/15 ]  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 2172 ]
|
2012-08-27 |
China Mobile Communications Corporation
,
ZTE Corporation
|
Time sync architecture based on multiple PTP domains
|
Q13/15
|
|
[ 2171 ]
|
2012-08-27 |
China Mobile Communications Corporation
,
ZTE Corporation
|
Hold-off time and interactions between frequency and phase-time planes
|
Q13/15
|
|
[ 2170 ]
|
2012-08-27 |
China Mobile Communications Corporation
,
ZTE Corporation
|
A possible solution for multiple GMs and operator intervention
|
Q13/15
|
|
[ 2169 ]
|
2012-08-27 |
China Mobile Communications Corporation
,
ZTE Corporation
|
Sync OAM architecture and requirements
|
Q13/15
|
|
[ 2168 ]
|
2012-08-27 |
ZTE Corporation
|
Further analysis about BMCA of time profile
|
Q13/15
|
|
[ 2167 ]
|
2012-08-27 |
ZTE Corporation
|
The mapping between ToD and PTP
|
Q13/15
|
|
[ 2155 ]
|
2012-08-27 |
ZTE Corporation
|
Analysis of interactive mechanism between two layers
|
Q13/15
|
|
[ 1841 ]
|
2011-11-22 |
China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Proposal of RS422 1PPS time/phase as a time measurement interface
|
Q13/15
|
|
[ 1690 ]
(Rev.1) |
2011-11-21 |
ZTE Corporation
|
Proposal to study the convergence of PON and transport network in the next study period
|
Q9/15, Q3/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
|
|
[ 1689 ]
(Rev.1) |
2011-11-21 |
ZTE Corporation
|
Proposal to study the convergence of optical and packet in the next study period
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
|
[ 1676 ]
(Rev.1) |
2011-11-21 |
ZTE Corporation
|
Noises Introduced by Boundary Clocks
|
Q13/15
|
|
[ 1674 ]
(Rev.1) |
2011-11-21 |
ZTE Corporation
|
G.8265 and G.8265.1 Editorial change
|
Q13/15
|
|
[ 1673 ]
(Rev.1) |
2011-11-21 |
China Mobile Communications Corporation
,
ZTE Corporation
|
Time transient build out and time offset response
|
Q13/15
|
|
[ 1672 ]
(Rev.1) |
2011-11-21 |
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
The mixed SSM_PTP application for frequency synchronization
|
Q13/15
|
|
[ 1667 ]
(Rev.1) |
2011-11-21 |
ZTE Corporation
|
Proposal of the combination of jumping and sliding window
|
Q13/15
|
|
[ 1662 ]
(Rev.1) |
2011-11-21 |
ZTE Corporation
|
Comments on G.8260 latest draft
|
Q13/15
|
|
[ 1660 ]
(Rev.1) |
2011-11-21 |
China Mobile Communications Corporation
,
ZTE Corporation
|
Proposal of 1pps as an external interface of PEC
|
Q13/15
|
|
[ 1659 ]
(Rev.1) |
2011-11-21 |
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Proposals on the validation of the PTP master
|
Q13/15
|
|
[ 1657 ]
(Rev.1) |
2011-11-21 |
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Proposals on the factors used for the master selection of time/phase sync
|
Q13/15
|
|
[ 1655 ]
(Rev.1) |
2011-11-21 |
China
,
ZTE Corporation
|
Analysis of selection window and oscillator
|
Q13/15
|
|
[ 1654 ]
(Rev.1) |
2011-11-21 |
ZTE Corporation
|
Analysis about timestamp process of PTP event packet
|
Q13/15
|
|
[ 1620 ]
(Rev.1) |
2011-11-19 |
FiberHome Technologies Group
,
ZTE Corporation
|
Proposal on the 1588v2 over OTN by OSC
|
Q13/15, Q11/15
|
|
[ 1617 ]
|
2011-11-19 |
FiberHome Technologies Group
,
ZTE Corporation
|
Withdrawn: Duplicate of C-1620
Withdrawn
|
Q13/15, Q11/15
|
|
[ 1235 ]
|
2011-01-31 |
CMCC
,
CATR
,
ZTE
|
Proposal on maximum PTP clock number in the time reference model
|
Q13/15
|
|
[ 1234 ]
|
2011-01-31 |
CMCC
,
CATR
,
Huawei
,
ZTE
|
TOD specification
|
Q13/15
|
Results:45 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):