Contributions
[ AI/Question: Q13/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 873 ]
|
G.8260: discussion on packet pre-selection criteria and comments on cluster and FWPR PDV metrics
|
France Télécomq
|
Q13/15
|
2010-05-18 |
|
[ 872 ]
|
G.8260: technical comments regarding WD115 (PDV metrics) from San Jose interim meeting
|
France Télécom
,
Tellabs
|
Q13/15
|
2010-05-18 |
|
[ 871 ]
|
G.8260: definition of floor delay, delay steps, and comments on Appendix I
|
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 870 ]
|
G.8260: list of requirements for PDV metrics
|
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 865 ]
|
G.8260: methodology to perform a PDV measurement
|
France Télécom, Ericsson
|
Q13/15
|
2010-05-18 |
|
[ 862 ]
(Rev.1) |
The removal of Floor Delay steps in Network PDV metrics
|
Calnex Solutions
|
Q13/15
|
2010-05-18 |
|
[ 861 ]
|
Development of a Wander requirement for 1588v2 Boundary Clocks
|
Calnex Solutions
|
Q13/15
|
2010-05-18 |
|
[ 847 ]
|
Noise transfer on the same SyncE copper port
|
Cisco
|
Q13/15
|
2010-05-17 |
|
[ 844 ]
|
G.8262 V.2 minor comments
|
Deutsche Telekom
|
Q13/15
|
2010-05-17 |
|
[ 842 ]
|
Time and Phase Sync noise budget in G.8271
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 841 ]
|
Details on Time Sync Methods in G.8271
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 840 ]
|
Time and Phase Sync Requirements Updates in G.8271
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 839 ]
|
G.8261.1 scope proposal
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 838 ]
|
Discussion on CPRI over OTN Sync Requirements
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 811 ]
|
Distributed Boundary and Transparent Clocks
|
ADTRAN
,
Calix
,
Symmetricom
|
Q4/15, Q2/15, Q13/15
|
2010-05-16 |
|
[ 809 ]
|
Support of SSM for Synchronous Ethernet in OMCI
|
ADTRAN
|
Q2/15, Q13/15
|
2010-05-16 |
|
[ 804 ]
|
SyncE Jitter tolerance values
|
Deutsche Telekom
|
Q13/15
|
2010-05-14 |
|
[ 803 ]
|
Examples of using cluster selection & metrics [G.8260, G.8261.1, G.8263]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 802 ]
|
Liaison to IEEE 802.1 about TC & 802.1Q violation [G.8275.1]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 801 ]
|
Possible 'basestation' masks [G.8261.1]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 800 ]
|
Comparison of MTIE in time and frequency domain [G.8260, G.8261.1, G.8263]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 799 ]
|
Interpolation of pre-processed metrics [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 798 ]
|
Definition of clusterTDEV [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 797 ]
|
Change definition of cluster selection [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 796 ]
|
Definition of cluster selection (augmented) [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 795 ]
|
Key performance indicators for cluster usage (e.g. FWPR) [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 794 ]
|
G.827x High Level Requirements
|
IDT
|
Q13/15
|
2010-05-14 |
|
[ 793 ]
|
Unicast Master Table
|
IDT
|
Q13/15
|
2010-05-14 |
|
[ 792 ]
|
G.8265.1 editorial comments
|
IDT
|
Q13/15
|
2010-05-14 |
|
[ 791 ]
|
G.8265.1 clause 6.2.1
|
IDT
|
Q13/15
|
2010-05-14 |
|
[ 780 ]
|
Test plan for PDV generation of a single equipment involved in IEEE1588-2008 transport
|
France Télécom
,
Cisco
|
Q13/15
|
2010-05-10 |
|
[ 779 ]
|
Proposed Primary Reference Time Clock Performance for G.8271
|
Symmetricom, LSI
|
Q13/15
|
2010-05-10 |
|
[ 775 ]
|
Support for the mixed unicast/multicast mode of operation in G.8265.1
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 774 ]
|
PDV histogram plot for G.8260 Appendix I
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 773 ]
|
Measurement configuration for PDV measurements
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 772 ]
|
Relationship of PDV metrics to PTP slave performance
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 771 ]
|
xTDEV/MAFE Definitions and Usage for G.8260 Appendix
|
Symmetricom
,
Nokia-Siemens
|
Q13/15
|
2010-05-10 |
|
[ 770 ]
|
Definition of Time Error and PDV for packet timing signals
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 769 ]
|
Definition of Packet Delay Variation (PDV) for timing applications
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 768 ]
|
Definition of "Packet Based Method" in G.8260
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 767 ]
|
The need for multiple protocol instances in PTP slaves
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 766 ]
|
Comments by John Eidson on the PTP Telecom Profile for Frequency Distribution
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 765 ]
|
Editorial changes to clause 6 of G.8265.1
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 764 ]
|
Removal of definitions in G.8265, G.8265.1 and G.8263
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 763 ]
|
Definition of the concept of "floor" as applied to packet transit delay studies
|
Symmetricom
|
Q13/15
|
2010-05-10 |
|
[ 759 ]
|
Measurement Configuration for Time Error Measurements
|
Symmetricom
,
LSI
|
Q13/15
|
2010-04-28 |
|
[ 758 ]
|
Definition of a Primary Reference Time Clock in G.8260
|
Symmetricom
,
LSI
|
Q13/15
|
2010-04-28 |
|
[ 750 ]
|
Considerations for carrying SyncE over Gigabit/s Ethernet over ODU0
|
PMC-Sierra
|
Q9/15, Q13/15, Q11/15
|
2010-04-28 |
|
[ 749 ]
|
Proposed Frequency and Time-of-Day method for OTN
|
PMC-Sierra
|
Q13/15, Q11/15
|
2010-04-28 |
|
[ 743 ]
|
Mobile LTE specification and phase/time synchronization requirements
|
Deutsche Telekom
|
Q13/15
|
2009-09-21 |
Results:487 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):