International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:487 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20  - Next Next
Contributions  [ Questions: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 970 ]  
 
2010-05-19 Alcatel-Lucent Germany   Timing Transparency over OTN     Q13/15, Q11/15  
[ 969 ]  
 
2010-05-19 Huawei   New Results for Serial Digital Interface Video Client Jitter and Wander Accumulation over OTN Islands     Q13/15  
[ 967 ]  
 
2010-05-19 Huawei   Additional Simulation Results for Peak-to-Peak Phase and RMS Frequency Offset for Transport of a CPRI Client over OTN     Q13/15  
[ 966 ]  
 
2010-05-19 JDSU   Proposed jitter tolerance specifications for G.8262     Q13/15  
[ 965 ]  
 
2010-05-19 Huawei   Further Simulation Results for syncE and STM-1 Jitter and Wander Accumulation over Networks of OTN Islands     Q13/15  
[ 963 ]  
 
2010-05-19 Huawei   Fibre Channel and Infiniband Jitter Accumulation over OTN Islands     Q13/15, Q11/15  
[ 959 ]  
 
2010-05-19 Ericsson   Time and Phase Sync Interfaces (G.8271)     Q13/15  
[ 949 ]  
 
2010-05-19 Huawei   Mapping method to support timing over OTN     Q13/15, Q11/15  
[ 948 ]  
 
2010-05-19 Huawei   Implementation analysis of timing over OTN     Q13/15, Q11/15  
[ 939 ]  
 
2010-05-19 Ericsson   Time Synchronization Telecom Profiles     Q13/15  
[ 905 ]  
 
2010-05-18 Huawei   Telecom Slave - State Machine Operations     Q13/15  
[ 904 ]  
 
2010-05-18 Huawei , CATR , MII   G.827x Recommendations - High-Level Objectives     Q13/15  
[ 903 ]  
 
2010-05-18 Huawei , CATR , China Mobile Communications Corporation , MII   Pulse-Per-Second Interface     Q13/15  
[ 902 ]  
 
2010-05-18 Huawei   PTP Profile Data Set Members     Q13/15  
[ 901 ]  
 
2010-05-18 Huawei   G.8264 ESMC Processing for G.8011.x Ethernet Services Types     Q13/15, Q10/15  
[ 900 ]  
 
2010-05-18 Huawei   Comments and Editorial Remarks for G.8265.1     Q13/15, Q10/15  
[ 899 ]  
 
2010-05-18 Huawei , France Télécom   Updated Telecom Slave Model     Q13/15  
[ 898 ]  
 
2010-05-18 Huawei   Flag Fields     Q13/15  
[ 897 ]  
 
2010-05-18 Huawei , China Mobile Communications Corporation   Test Results of IEEE1588v2 hop-by-hop time synchronization using Boundary Clocks     Q13/15  
[ 896 ]  
 
2010-05-18 Huawei , China Mobile Communications Corporation   The use of SyncE and IEEE1588v2 for Time Distribution     Q13/15  
[ 895 ]  
 
2010-05-18 Huawei , BT   ESMC Transport over GPON     Q2/15, Q13/15  
[ 894 ]  
 
2010-05-18 Huawei , France Télécom   G.8264 Amendment: editorial comments regarding the use of physical methods to deliver timing in a multi-operator context     Q13/15  
[ 893 ]  
 
2010-05-18 Huawei   Usage of PTP domain number for the time-profile     Q13/15  
[ 876 ]  
 
2010-05-18 France Télécom   Issues with the Transparent Clock concept of PTPv2 in a telecom environment     Q4/15, Q2/15, Q13/15  
[ 875 ]  
 
2010-05-18 France Télécom   Architecture for phase and time distribution     Q4/15, Q2/15, Q13/15  
Results:487 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2013-5-24