International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:487 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2240 ]  
 
Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2239 ]  
 
Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2238 ]  
 
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2237 ]  
 
Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2235 ]  
 
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix   Q13/15   2012-08-28
[ 2212 ]  
 
Transparent Clocks and Issues Around Perceived Layer Violations [G.8275.1]     Aviat Networks , Calnex Solutions Limited , Juniper Networks , Sprint , Vitesse Semiconductor Corporation   Q13/15   2012-08-28
[ 2195 ]  
 
Variable temperature test regime     Rakon Limited   Q13/15   2012-08-27
[ 2194 ]  
 
G.8263 Clarification     Rakon Limited   Q13/15   2012-08-27
[ 2172 ]  
 
Time sync architecture based on multiple PTP domains     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2012-08-27
[ 2171 ]  
 
Hold-off time and interactions between frequency and phase-time planes     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2012-08-27
[ 2170 ]  
 
A possible solution for multiple GMs and operator intervention     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2012-08-27
[ 2169 ]  
 
Sync OAM architecture and requirements     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2012-08-27
[ 2168 ]  
 
Further analysis about BMCA of time profile     ZTE Corporation   Q13/15   2012-08-27
[ 2167 ]  
 
The mapping between ToD and PTP     ZTE Corporation   Q13/15   2012-08-27
[ 2155 ]  
 
Analysis of interactive mechanism between two layers     ZTE Corporation   Q13/15   2012-08-27
[ 2143 ]  
 
G.8273: Test methodology annex/appendix     Calnex Solutions Limited , Deutsche Telekom AG   Q13/15   2012-08-27
[ 2106 ]  
 
Architecture Considerations for Time Distribution     ADVA Optical Networking   Q13/15   2012-08-26
[ 2105 ]  
 
G.8261.1 Network limits     ADVA Optical Networking   Q13/15   2012-08-26
[ 2104 ]  
 
PTP Network Probe and PTP Clock Probe     ADVA Optical Networking   Q13/15   2012-08-26
[ 2103 ]  
 
Exact PTP clockclass values in application     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2102 ]  
 
Proposal on PTP multicast MAC address in 8275.1     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2101 ]  
 
Test and analysis of time synchronization using 1588v2 in 100G OTN long haul transport network     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2100 ]  
 
Coordinate mechanism for SyncE and PTP     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2095 ]  
 
PRTC Timing Signal Variation for a Particular Design     SymmetriCom, Inc.   Q13/15   2012-08-25
[ 2087 ]  
 
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     PMC-Sierra, Inc.   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-25
[ 2084 ]  
 
Testing Packet Clocks (re. G.8263) - Part 2     Anue Systems   Q13/15   2012-08-25
[ 2083 ]  
 
Normal operation of telecom-grade network elements for supporting packet-based timing     Anue Systems   Q13/15   2012-08-25
[ 2082 ]  
 
Packet Timing Monitor - Definition     Anue Systems   Q13/15   2012-08-25
[ 2081 ]  
 
Annex for G.8273 discussing performance parameters for PTP clocks     Anue Systems   Q13/15   2012-08-25
[ 2080 ]  
 
Organization of T-BC performance requirements     Anue Systems   Q13/15   2012-08-25
[ 2079 ]  
 
Time Error of PTP master ports     Anue Systems   Q13/15   2012-08-24
[ 2078 ]  
 
Time error accumulation in chains of phase/time clocks     Anue Systems   Q13/15   2012-08-24
[ 2077 ]  
 
Estimating constant time error and related measurement methods for phase/time clocks     Anue Systems   Q13/15   2012-08-24
[ 2075 ]  
 
G.8260: Definition of Partial On-path Support     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2074 ]  
 
Starting point for the development of a new PTP profile for time and phase distribution over existing deployed networks     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2073 ]  
 
G.8272: Phase/Time Holdover Capability for a PRTC     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2069 ]  
 
G.8272: Performance conditions for the PRTC     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2068 ]  
 
G.8265.1: Value of the PTP "Renewal Invited" flag     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2067 ]  
 
G.8265.1: Value of the PTP clockAccuracy Field     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2063 ]  
(Rev.1) 
G.8263: PDV Noise Tolerance Testing for the PEC-S-F     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2060 ]  
 
G.8263: PDV Distribution for Noise Tolerance of Packet Slave Clocks     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2053 ]  
(Rev.1) 
Development of a new PTP Profile for Time/Phase Distribution     AT&T, Inc. , Sprint , SymmetriCom, Inc. , Verizon Communication Corporation   Q13/15   2012-08-24
[ 2045 ]  
 
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     AT&T, Inc. , Ciena Corporation   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-24
[ 2043 ]  
 
Alternative to legacy interfaces for connecting PRTC to T-GM     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2042 ]  
 
G.8272: PRTC Support of SyncE and ESMC     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2040 ]  
 
Support of IPv6 for G.8265.1     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2039 ]  
 
Two-step clock issue with multicast transmission     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2038 ]  
 
Support of IP for G.8275.x     Cisco Systems, Inc. , Juniper Networks   Q13/15   2012-08-24
[ 2014 ]  
(Rev.1) 
Considerations on Time Sync holdover and rearrangements     Telefon AB - LM Ericsson   Q13/15   2012-08-24
[ 2004 ]  
(Rev.1) 
Considerations on Time sync Limits in G.8271.1     Calnex Solutions Limited , Telefon AB - LM Ericsson   Q13/15   2012-08-23
Results:487 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-24