Français
Español
Home
:
ITU-T
:
SG15
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG15 C
ITU-T SG15
Max # of documents displayed/page:
Transport network structures
Study Period 2009
Results:
487
total items.
Result page:
Previous
-
1
-
2
-
3
-
4
-
5
-
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
Next
Contributions
[ Questions: Q13/15 ]
Number
Received
Source
Title
Questions
[ 1569 ]
(Rev.1)
2011-11-18
Cisco Systems, Inc.
Two-step clock issue with multicast transmission
Q13/15
[ 1564 ]
(Rev.1)
2011-11-18
Telefon AB - LM Ericsson
Holdover specification in G.8263
Q13/15
[ 1563 ]
(Rev.1)
2011-11-18
Telefon AB - LM Ericsson
Discussion on Architecture and BMC algorithm for the Time Sync Telecom Profile (G.8275 and G.8275.1)
Q13/15
[ 1561 ]
(Rev.1)
2011-11-18
Telefon AB - LM Ericsson
PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1)
Q13/15
[ 1538 ]
(Rev.1)
2011-11-17
Ciena Canada
Example of changes to G.8021 to support enhanced holdover
Q13/15
[ 1535 ]
(Rev.1)
2011-11-17
Zarlink Semiconductor
Clean-up of G.8260 text
Q13/15
[ 1534 ]
(Rev.1)
2011-11-17
Zarlink Semiconductor
Harmonization of cluster & percentile selection for clock emulation metrics
Q13/15
[ 1517 ]
2011-02-02
Huawei
Specification of a Pulse per Second (1PPS) interface for Telecom
Q13/15
[ 1516 ]
2011-02-02
Huawei
Translation of an IP Multicast address to an Ethernet MAC Multicast address
Q13/15
[ 1515 ]
2011-02-02
Huawei
PTP link-local and internetwork IPv4 Multicast addresses for hop-by-hop time transfer
Q13/15
[ 1514 ]
2011-02-02
Huawei
Effect of Pdelay or Delay Request/Response Turnaround Time, and Sojourn Time, on Boundary Clock Performance
Q13/15
[ 1513 ]
2011-02-02
Huawei
G.8275.1 time-profile: ClockClass attribute discussion
Q13/15
[ 1512 ]
2011-02-02
Huawei
Minimum 1PPS requirements and additional requirements
Q13/15
[ 1511 ]
2011-02-02
Huawei
Mathematical Description of Boundary Clock Simulation Models for the Case of Frequency Distribution via syncE
Q13/15
[ 1510 ]
2011-02-02
Huawei
Comparison of Boundary Clock Simulation Models
Q13/15
[ 1509 ]
2011-02-02
Huawei
Additional external 1PPS interface point, and PTP / non-PTP interworking for GPON/DSL
Q13/15
[ 1497 ]
2011-02-02
Ciena Corporation
Architectural constructs to describe phase/time distribution
Q13/15
[ 1459 ]
2011-02-02
France Telecom
,
Tellabs
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)
Q13/15
[ 1458 ]
2011-02-02
France Telecom
Network PDV accumulation study with "end-to-end" data traffic model
Q13/15
[ 1457 ]
2011-02-02
France Telecom
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
Q13/15
[ 1456 ]
2011-02-02
France Telecom
G.8272: comments on PRTC limits proposal
Q13/15
[ 1455 ]
2011-02-02
France Telecom
G.8263: testing methodology for the PDV tolerance of a packet slave clock
Q13/15
[ 1454 ]
2011-02-02
France Telecom
G.8261.1: Hypothetical Reference Models proposal
Q13/15
[ 1453 ]
2011-02-02
France Telecom
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1
Q13/15
[ 1452 ]
2011-02-02
France Telecom
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks
Q13/15
Results:
487
total items.
Result page:
Previous
-
1
-
2
-
3
-
4
-
5
-
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
Next
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2013-5-24