International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:487 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1909 ]  
(Rev.1-2) 
PDV tolerance masks for HRM-1 and HRM-2     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2011-11-22
[ 1895 ]  
 
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented     France Télécom Orange   Q13/15   2011-11-22
[ 1894 ]  
 
G.8271: Editorial comments on latest draft     France Télécom Orange   Q13/15   2011-11-22
[ 1893 ]  
 
G.8263: Section 9 - PEC-S-F holdover     France Télécom Orange   Q13/15   2011-11-22
[ 1892 ]  
 
G.8263: Section 6 - PEC-S-F slave clock noise generation     France Télécom Orange   Q13/15   2011-11-22
[ 1891 ]  
 
G.8263: New Appendix discussing time constant values     France Télécom Orange   Q13/15   2011-11-22
[ 1890 ]  
 
G.8261.1: Notes on network equipments producing excessive PDV     France Télécom Orange   Q13/15   2011-11-22
[ 1889 ]  
 
G.8261.1: Editorial comments on latest draft     France Télécom Orange   Q13/15   2011-11-22
[ 1888 ]  
 
G.8260: Request for clarification about the MAFE corner point     France Télécom Orange   Q13/15   2011-11-22
[ 1887 ]  
 
G.8260: Comments on latest draft     France Télécom Orange   Q13/15   2011-11-22
[ 1886 ]  
 
Transport of CPRI interface over OTN     France Télécom Orange   Q13/15   2011-11-22
[ 1885 ]  
 
Proposal for reply to 3GPP liaison "Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization"     France Télécom Orange   Q13/15   2011-11-22
[ 1884 ]  
 
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing     Calnex Solutions Limited , France Télécom Orange   Q13/15   2011-11-22
[ 1879 ]  
 
Performance analysis of IEEE1588v2 time distribution through OTN Client signals when power restart and board reset     China Telecommunications Corporation   Q13/15   2011-11-22
[ 1841 ]  
 
Proposal of RS422 1PPS time/phase as a time measurement interface     China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q13/15   2011-11-22
[ 1780 ]  
(Rev.1) 
Consideration on PTP over OTN solution options     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2011-11-22
[ 1772 ]  
(Rev.1) 
Development of PTP time transport HRMs that encompass OTN     Alcatel-Lucent Italia S.p.A. , Huawei Technologies Co. Ltd.   Q13/15   2011-11-22
[ 1752 ]  
(Rev.1) 
JDSU Time Offset Measurement     JDSU Deutschland GmbH   Q13/15   2011-11-22
[ 1734 ]  
 
Status of Jitter/Wander Requirements and Performance for the Transport of SDI Video Clients over OTN     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1733 ]  
 
Rise time requirements of RS422 1PPS_OUT signal     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1730 ]  
 
Maximum FFO of the Output of a Second-Order PLL due to a Sinusoidal and Triangular Wave Input     France Télécom Orange , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix, Inc.   Q13/15   2011-11-21
[ 1729 ]  
 
Initial Simulation Results for Transport of Time over the HRM2b chain of Boundary Clocks     France Télécom Orange , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix, Inc.   Q13/15   2011-11-21
[ 1728 ]  
 
Detection and removal of Delay Jumps using FWPR and minMATIE     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1727 ]  
 
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2011-11-21
[ 1726 ]  
 
Criterion for Minimum Detectable Floor Delay Step using minMATIE     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1725 ]  
 
Initial Simulation Results for Transport of Time over the HRM3 chain of Boundary Clocks, with SyncE Reference Chain Rearrangements     France Télécom Orange , France Télécom Orange , Huawei Technologies Co. , Iometrix, Inc.   Q13/15   2011-11-21
[ 1723 ]  
(Rev.1) 
Request for evaluation of OTN support for CPRI     AT&T, Inc.   Q13/15   2011-11-21
[ 1708 ]  
(Rev.1) 
Security with Timing as a Managed Service     SymmetriCom, Inc.   Q13/15   2011-11-21
[ 1707 ]  
(Rev.1) 
Considerations on Packet Rate for the PEC-S-F     SymmetriCom, Inc.   Q13/15   2011-11-21
[ 1703 ]  
(Rev.1) 
PEC-S-F Output Timing Signals     SymmetriCom, Inc.   Q13/15   2011-11-21
[ 1702 ]  
(Rev.1) 
Noise Tolerance for the Packet Slave Clock (PEC-S-F)     SymmetriCom, Inc.   Q13/15   2011-11-21
[ 1701 ]  
 
Synchronization Requirement in OTN     China Mobile Communications Corporation   Q13/15, Q11/15   2011-11-21
[ 1700 ]  
(Rev.1) 
Noise Generation for the Packet Slave Clock (PEC-S-F)     SymmetriCom, Inc.   Q13/15   2011-11-21
[ 1699 ]  
 
The OAM structure and functions requirements for Packet-based synchronization network     China Mobile Communications Corporation   Q13/15   2011-11-21
[ 1696 ]  
(Rev.1) 
Testing of Packet Slave Clocks     SymmetriCom, Inc.   Q13/15   2011-11-21
[ 1695 ]  
(Rev.1) 
Measuring PRTC Accuracy     SymmetriCom, Inc.   Q13/15   2011-11-21
[ 1693 ]  
(Rev.1) 
Cesium Clock Wander Contribution to Grandmaster Clock Characterization     SymmetriCom, Inc.   Q13/15   2011-11-21
[ 1691 ]  
(Rev.1-2) 
Testing Packet Slave Clocks using Flicker Noise     SymmetriCom, Inc.   Q13/15   2011-11-21
[ 1690 ]  
(Rev.1) 
Proposal to study the convergence of PON and transport network in the next study period     ZTE Corporation   Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-11-21
[ 1689 ]  
(Rev.1) 
Proposal to study the convergence of optical and packet in the next study period     ZTE Corporation   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2011-11-21
[ 1685 ]  
(Rev.1) 
G.8273.2: Discussion on text for Sections 6 through 9.     Calnex Solutions Limited   Q13/15   2011-11-21
[ 1684 ]  
(Rev.1) 
Comments on draft G.8260, Section I.5 'PDV Metrics studying minimum floor delay packet population.'     Calnex Solutions Limited   Q13/15   2011-11-21
[ 1676 ]  
(Rev.1) 
Noises Introduced by Boundary Clocks     ZTE Corporation   Q13/15   2011-11-21
[ 1674 ]  
(Rev.1) 
G.8265 and G.8265.1 Editorial change     ZTE Corporation   Q13/15   2011-11-21
[ 1673 ]  
(Rev.1) 
Time transient build out and time offset response     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2011-11-21
[ 1672 ]  
(Rev.1) 
The mixed SSM_PTP application for frequency synchronization     China , China Mobile Communications Corporation , ZTE Corporation   Q13/15   2011-11-21
[ 1667 ]  
(Rev.1) 
Proposal of the combination of jumping and sliding window     ZTE Corporation   Q13/15   2011-11-21
[ 1662 ]  
(Rev.1) 
Comments on G.8260 latest draft     ZTE Corporation   Q13/15   2011-11-21
[ 1660 ]  
(Rev.1) 
Proposal of 1pps as an external interface of PEC     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2011-11-21
[ 1659 ]  
(Rev.1) 
Proposals on the validation of the PTP master     China , China Mobile Communications Corporation , ZTE Corporation   Q13/15   2011-11-21
Results:487 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25