International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:200 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  [ Questions: Q11/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1277 ]  
 
2011-01-31 ZTE   Proposals to clarify the definition and usage of RP bit and add a resizing state machine to G.HAO     Q11/15  
[ 1260 ]  
 
2011-01-31 Huawei   Consideration on OTU5 (400G)     Q11/15  
[ 1258 ]  
 
2011-01-31 ZTE   Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao     Q14/15, Q12/15, Q11/15  
[ 1246 ]  
 
2011-01-31 ETRI   A proposal to fault scenario analysis of draft G.hao     Q11/15  
[ 1245 ]  
 
2011-01-31 ETRI   A proposal to session timer for draft G.hao     Q11/15  
[ 1210 ]  
 
2011-01-31 Fiberhome Technologies Group , China Academy of Telecommunication Research   The support of OSC transmition 1588V2 in OTN/G.798.1     Q9/15, Q13/15, Q11/15  
[ 1184 ]  
 
2011-01-31 PMC-Sierra   Rate Change Considerations during BWR in G.hao     Q11/15  
[ 1183 ]  
 
2011-01-31 PMC-Sierra   Clarifications to G.hao     Q11/15  
[ 1175 ]  
 
2011-01-31 Avalon Microelectronics   Considerations on 100GE PCS BIP8 Transparency     Q11/15  
[ 1098 ]  
 
2010-05-24 Deutsche Telekom   Optional metro FEC for OTU4     Q11/15  
[ 1097 ]  
 
2010-05-24 Deutsche Telekom   ODUflex resizing and multi-carrier applications     Q12/15, Q11/15  
[ 1070 ]  
 
2010-05-21 FiberHome , CATR , ZTE   1588v2 transmission by OSC over OTN     Q13/15, Q11/15  
[ 1068 ]  
 
2010-05-21 CMCC   Synchronization Requirement in OTN     Q13/15, Q11/15  
[ 1067 ]  
 
2010-05-21 Symmetricom , CATR , CMCC   GPS timing receiver characterization     Q13/15, Q11/15  
[ 1066 ]  
 
2010-05-21 CMCC , CATR , ZTE   Analysis of time synchronization performance using PTP in hybrid transport network     Q13/15, Q11/15  
[ 1036 ]  
(Rev.1) 
2010-05-20 ZTE   Consideration on Phase/Time synchronization over OTN     Q13/15, Q11/15  
[ 1019 ]  
 
2010-05-20 France Télécom   G.8251: OTN timing aspects     Q13/15, Q11/15  
[ 970 ]  
 
2010-05-19 Alcatel-Lucent Germany   Timing Transparency over OTN     Q13/15, Q11/15  
[ 963 ]  
 
2010-05-19 Huawei   Fibre Channel and Infiniband Jitter Accumulation over OTN Islands     Q13/15, Q11/15  
[ 952 ]  
 
2010-05-19 ETRI   Additional Requirement for ODUflex hitless resizing     Q11/15  
[ 951 ]  
 
2010-05-19 ETRI   Proposal Amendment to G.7041 for 40G & 100G Ethernet transport     Q11/15  
[ 950 ]  
 
2010-05-19 ETRI   Proposal Amendment to G.7041 Table V.4     Q11/15  
[ 949 ]  
 
2010-05-19 Huawei   Mapping method to support timing over OTN     Q13/15, Q11/15  
[ 948 ]  
 
2010-05-19 Huawei   Implementation analysis of timing over OTN     Q13/15, Q11/15  
[ 947 ]  
 
2010-05-19 Huawei   Consideration on OTU5 definition     Q11/15  
Results:200 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2013-5-23