Contributions
[ Questions: 9/15 ]  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 1320 ]
|
2011-02-01 |
Fujitsu
|
Comments and proposed modification on draft G.873.2
|
Q9/15
|
|
[ 1319 ]
|
2011-02-01 |
Fujitsu
,
CIAJ
,
Hitachi
,
Mitsubishi
,
NEC
|
PCSL error control block insertion and BIP8 transparency for 100GBASE-R/ODU4
|
Q9/15, Q11/15
|
|
[ 1318 ]
|
2011-02-01 |
Fujitsu
|
Proposed updates for G.798
|
Q9/15
|
|
[ 1317 ]
|
2011-02-01 |
Fujitsu
|
Proposed updates for clause 6.5 in G.806
|
Q9/15
|
|
[ 1315 ]
|
2011-02-01 |
Hitachi
|
Comments on the Recommendation-dependency in G.8121/Y.1381
|
Q9/15
|
|
[ 1314 ]
(Rev.1) |
2011-02-01 |
Hitachi
|
Comments on the progress of G.ptneq (G.8060) standardization
|
Q9/15
|
|
[ 1312 ]
|
2011-02-01 |
Hitachi
|
Consideration of alignment of PTN Recommendations
|
Q9/15
|
|
[ 1308 ]
|
2011-02-01 |
Cisco
,
AT&T
|
Reporting of results for pro-active measurement using SLM
|
Q9/15
|
|
[ 1305 ]
|
2011-02-01 |
Cisco
,
AT&T
,
BT
,
Ericsson
,
Juniper
,
NSN
,
Qwest
,
Telenor
,
Telstra
,
Verizon
|
Procedural issues on MPLS-TP
|
Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15
|
|
[ 1303 ]
|
2011-02-01 |
Cisco
,
AT&T
,
BT
,
Ericsson
,
Juniper
,
NSN
,
Qwest
,
Telenor
,
Telstra
,
Verizon
|
Inter SDO Cooperation on MPLS-TP
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5
|
|
[ 1301 ]
|
2011-02-01 |
Verizon
,
BT
,
France Telecom Orange
,
Qwest
,
Telenor
,
Telstra
|
Operator Requirements for MPLS-TP OAM
|
Q9/15, Q14/15, Q12/15, Q10/15
|
|
[ 1300 ]
|
2011-02-01 |
Verizon
,
AT&T
|
Rationale to support Test ID in Delay Measurement in Y.1731 and G.8021
|
Q9/15, Q10/15
|
|
[ 1299 ]
|
2011-02-01 |
Cisco
,
Juniper
,
Verizon
|
Comments on content of clauses 8 and 9 of G.tpoam
|
Q9/15, Q10/15
|
|
[ 1298 ]
|
2011-02-01 |
Juniper Networks
,
Cisco
,
NSN
,
Verizon
|
MPLS-TP OAM - issues with the proposed Y.1731 based OAM solution
|
Q9/15, Q14/15, Q12/15, Q10/15
|
|
[ 1295 ]
|
2011-02-01 |
Huawei
,
Deutsche Telekom
|
Models in G.8010
|
Q9/15, Q14/15, Q12/15
|
|
[ 1294 ]
|
2011-02-01 |
Alcatel-Lucent USA
|
G.8021 and G.8031 text to configure SD-triggered linear protection switching
|
Q9/15
|
|
[ 1293 ]
|
2011-02-01 |
Alcatel-Lucent USA
|
Comments and suggestions on proposed new Appendix XI for ITU-T Rec. G.8032
|
Q9/15
|
|
[ 1290 ]
|
2011-02-01 |
Cisco
,
AT&T
|
Reporting of results for pro-active measurement using SLM
|
Q9/15
|
|
[ 1281 ]
|
2011-01-31 |
ZTE
|
Proposed texts for G.smp
|
Q9/15
|
|
[ 1280 ]
|
2011-01-31 |
ZTE
|
Automatic Protection Switching (APS) protocol for Shared Mesh Protection
|
Q9/15
|
|
[ 1273 ]
|
2011-01-31 |
Alcatel-Lucent Germany
|
Issues with TCM section monitoring and CA
|
Q9/15
|
|
[ 1271 ]
|
2011-01-31 |
Alcatel-Lucent Germany
|
Correction of mistakes in ODU connection function processes in G.798
|
Q9/15
|
|
[ 1269 ]
|
2011-01-31 |
Huawei
|
Proposed text for inclusion in Y.1731 for Frame Loss Measurement
|
Q9/15, Q10/15
|
|
[ 1257 ]
|
2011-01-31 |
ZTE
|
Propose a latency measurement model of equipment
|
Q9/15
|
|
[ 1248 ]
|
2011-01-31 |
CATR
,
China Mobile
|
PTN GACh+Y.1731 OAM interoperability test activities and result
|
Q9/15, Q14/15, Q12/15, Q10/15
|
Results:580 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):