International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 1415 ]  
 
2011-02-01 ETRI   Proposed modification on OTM-0.mvn in G.798     Q9/15  
[ 1414 ]  
 
2011-02-01 ETRI   Proposal for addition of HO OPU mapping types in G.709     Q11/15  
[ 1413 ]  
 
2011-02-01 ETRI   Proposed modification of G.709 (12/2009) Appendix XII for inclusion in G.709 Amendment 2     Q11/15  
[ 1412 ]  
 
2011-02-01 ETRI   Addition of new Appendix/G.7041 for ODUflex(GFP) packet data throughput     Q11/15  
[ 1411 ]  
 
2011-02-01 Marvell Semiconductor   Fixes in the recommendation to deal with multicast traffic     Q4/15  
[ 1410 ]  
 
2011-02-01 Marvell Semiconductor   G.hn: Proposal for Channel Estimation bandwidth reservation     Q4/15  
[ 1409 ]  
 
2011-02-01 Marvell Semiconductor   Bandwidth allocation protocol     Q4/15  
[ 1408 ]  
 
2011-02-01 Marvell Semiconductor   Proposal for Corrigendum (Geneva meeting) - analyzing different fixes to the current approved versions of G.9960 and G.9961     Q4/15  
[ 1407 ]  
 
2011-02-01 Ministry of Communications (Israel (State of))   G.vdsl: End to End Model and Precision requirements from ToD over VDSL2     Q4/15  
[ 1406 ]  
 
2011-02-01 A.T. Communication Channels , Ericsson   OMCI Tip-Ring Test Result for POTS UNI     Q2/15  
[ 1405 ]  
 
2011-02-01 A.T. Communication Channels , Ericsson   OMCI updates for Vendor-specific Test Parameters     Q2/15  
[ 1404 ]  
 
2011-02-01 A.T. Communication Channels , Alcatel-Lucent , Ericsson   Enabling variable message length in extended message format     Q2/15  
[ 1403 ]  
 
2011-02-01 BT   G.gen: G.hn: G.vdsl: Reference Modelling for FTTdp Final Drops - For Information     Q4/15  
[ 1402 ]  
 
2011-02-01 BT   G.gen: G.hn: G.vdsl: RF Ingress above 30 MHz - For Information     Q4/15  
[ 1401 ]  
 
2011-02-01 NTT   Improvement of Annex E/G.709 (40GbE/100GbE transport over OTN)     Q9/15, Q11/15  
[ 1400 ]  
 
2011-02-01 Ericsson   Time Error Budget in the Base Stations and considerations on the rearrangements in the time synchronization network     Q13/15  
[ 1399 ]  
 
2011-02-01 Alcatel-Lucent   Specification of DPSK demodulator or delay line interferometer towards revised G.671     Q7/15  
[ 1398 ]  
 
2011-02-01 Alcatel-Lucent   Considerations on flexible grids     Q6/15  
[ 1397 ]  
 
2011-02-01 Alcatel-Lucent   Progress on standardization of P-DPSK modulation format     Q6/15  
[ 1396 ]  
 
2011-02-01 Deutsche Telekom   Relation between G.aon and G.872     Q12/15  
[ 1395 ]  
 
2011-02-01 Deutsche Telekom   WCh clients in draft G.aon     Q12/15  
[ 1394 ]  
 
2011-02-01 Deutsche Telekom   Properties of a Wavelength Channel in draft G.aon     Q12/15  
[ 1393 ]  
 
2011-02-01 BT   G.INP: VDSL2 will require retransmission upstream     Q4/15  
[ 1392 ]  
 
2011-02-01 Deutsche Telekom   BBER objectives in Recommendation G.8201     Q9/15  
[ 1391 ]  
 
2011-02-01 BT   Synchronisation Budget     Q13/15  
[ 1390 ]  
 
2011-02-01 Swisscom   G.vdsl: Operator control of transitions out of showtime (Reinit policies)     Q4/15  
[ 1389 ]  
 
2011-02-01 Huawei   Proposal to extend the text in clause 5 of G.806     Q9/15  
[ 1388 ]  
 
2011-02-01 BT   Multiple Independent Timing Domains     Q13/15  
[ 1387 ]  
 
2011-02-01 OFS-Fitel , LLC , Verizon   Withdrawn by TSB (duplicate): See C-1364, "Future revision of Rec. G.657 (bend-loss insensitive SMF)"     Q5/15  
[ 1386 ]  
 
2011-02-01 RAD Data Communications   Comments on G.8260 latest draft and WDedi107     Q13/15  
[ 1385 ]  
 
2011-02-01 Italy   Support for the consent of G.8110.1 and G.tpoam     Q12/15, Q10/15  
[ 1384 ]  
 
2011-02-01 Telecom Italia   Structure and content of the MPLS-TP Recommendations     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1383 ]  
 
2011-02-01 Telecom Italia   Supporting consent of G.tpoam and choice of Associated Channel Type     Q10/15  
[ 1382 ]  
 
2011-02-01 Ericsson   G.8032 Appendix XI     Q9/15  
[ 1381 ]  
 
2011-02-01 Alcatel-Lucent Bell N.V.   Proposed Working Text for Time-of-Day Transport in VDSL2 per Agreements Reached at the January 17-20, 2011 interim Q4/15 meeting     Q4/15  
[ 1380 ]  
 
2011-02-01 Alcatel-Lucent Bell N.V.   Time of Day transport over VDSL2 link     Q4/15  
[ 1379 ]  
 
2011-02-01 France Telecom Orange   GPLOAM: LOSS-L, LOSS-LFE and UAS     Q4/15  
[ 1378 ]  
 
2011-02-01 Alcatel-Lucent   ODUflex(GFP) Recommended Bit Rates     Q9/15, Q11/15  
[ 1377 ]  
 
2011-02-01 Huawei , China Mobile Communication Corporation   Proposed text for inclusion in G.8021 for Frame Loss Measurement     Q9/15, Q10/15  
[ 1376 ]  
 
2011-02-01 NTT , NEC   Proposed text for defining "in-profile" frames in Y.1731     Q10/15  
[ 1375 ]  
(Rev.1) 
2011-02-01 NTT , NSN   R-APS channels with different MAC-DA and same VID for identifying Ring-ID in G.8032     Q9/15  
[ 1374 ]  
 
2011-02-01 Huawei   Proposed Wavelength allocation and standard structure of G.sdapp     Q6/15  
[ 1373 ]  
 
2011-02-01 Ericsson   Comments on content of Clauses 8 and 9 of G.tpoam     Q9/15  
[ 1372 ]  
 
2011-02-01 Israel   Withdrawn: Continued cooperation with IETF on MPLS for Transport Networks     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1371 ]  
 
2011-02-01 Ciena Corporation   Definition of a flexible grid in G.694.1     Q6/15  
[ 1370 ]  
 
2011-02-01 NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon   Comments on working assumption at Berlin meeting and TD377 (wd31r1)     Q9/15, Q12/15, Q10/15  
[ 1369 ]  
 
2011-02-01 ETRI , SK Telecom   Automatic Protection Switching (APS) for packet networks in G.smp     Q9/15  
[ 1368 ]  
 
2011-02-01 ETRI   Principle of APS protocol operation for MPLS-TP linear protection switching     Q9/15  
[ 1367 ]  
 
2011-02-01 NSN   Comments on consent of G.ptneq     Q9/15  
[ 1366 ]  
 
2011-02-01 NSN , NTT   Adding dFOP-TO to G.8032     Q9/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21