International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60 - 61 - 62 - 63 - 64 - 65 - 66 - 67 - 68 - 69 - 70 - 71 - 72 - 73 - 74 - 75 - 76 - 77 - 78 - 79 - 80 - 81 - 82 - 83 - 84 - 85 - 86 - 87 - 88 - 89 - 90 - 91 - 92 - 93 - 94 - 95 - 96  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 1615 ]  
(Rev.1) 
2011-11-19 Ciena Corporation   MSI Mismatch alarm issues connected with Auto PT enabled systems interconnecting new OTN equipment (PT=21) with old equipment (PT=20)     Q9/15, Q11/15  
[ 1614 ]  
(Rev.1) 
2011-11-19 Ciena Corporation   Protection switching at the E-NNI for multi-stage multiplexed OTN     Q9/15  
[ 1613 ]  
(Rev.1) 
2011-11-19 Ciena Corporation   Proposal to include 1+1 and 1:n bidirectional cases for the SNC/N protection subclass in Rec. G.873.1     Q9/15  
[ 1612 ]  
(Rev.1) 
2011-11-19 Ciena Corporation   G.873.1 Addition of CL-SNCG/S Protection     Q9/15  
[ 1611 ]  
(Rev.1) 
2011-11-19 Ciena Corporation   Proposed Corrections to Table 7-1 of G.873.1     Q9/15  
[ 1610 ]  
(Rev.1) 
2011-11-19 Ciena Corporation   Management of G.872 v2 (aon)     Q14/15, Q12/15  
[ 1609 ]  
(Rev.1) 
2011-11-19 Ciena Corporation   Clarification of OTN Maintenance Signalling in G.798.1     Q9/15  
[ 1608 ]  
(Rev.1) 
2011-11-19 Alcatel-Lucent USA Inc.   Considerations for ODU5     Q6/15, Q11/15  
[ 1607 ]  
(Rev.1) 
2011-11-18 Anue Systems   Study of maximum absolute time error accumulation in a chain of Boundary Clocks with time filtering and with Physical Layer frequency assist     Q13/15  
[ 1606 ]  
(Rev.1) 
2011-11-18 Anue Systems   Simulation results regarding spectrum of time-stamping granularity error     Q13/15  
[ 1605 ]  
(Rev.1) 
2011-11-18 Anue Systems   Reduction of impact of time-stamping granularity noise on time transfer error     Q13/15  
[ 1604 ]  
(Rev.1) 
2011-11-18 Anue Systems   Sliding versus jumping windows     Q13/15  
[ 1603 ]  
(Rev.1) 
2011-11-18 Anue Systems   Floor Packet Population PDV limit for two-way methods     Q13/15  
[ 1602 ]  
(Rev.1) 
2011-11-18 Anue Systems   Test Case for 150us cluster and 200s window     Q13/15  
[ 1601 ]  
(Rev.1) 
2011-11-18 Anue Systems   Observations on the framework of Floor Population Metrics for PDV Limits     Q13/15  
[ 1600 ]  
(Rev.1) 
2011-11-18 Anue Systems   Developing a graphical understanding of floor population PDV metrics     Q13/15  
[ 1599 ]  
(Rev.1) 
2011-11-18 Anue Systems   Names and formulae for floor population metrics     Q13/15  
[ 1598 ]  
(Rev.1) 
2011-11-18 Huawei Technologies Co. Ltd. , Infinera Corporation   Draft Recommendation G.smp.signalling     Q9/15  
[ 1597 ]  
 
2011-11-18 Anue Systems   Observations regarding floor population percentage measurements     Q13/15  
[ 1596 ]  
(Rev.1) 
2011-11-18 Telefon AB - LM Ericsson   PDV network limit in G.8261.1     Q13/15  
[ 1595 ]  
(Rev.1-2) 
2011-11-18 Telefon AB - LM Ericsson   Intra-site Time Sync Requirements in G.8271     Q13/15  
[ 1594 ]  
(Rev.1) 
2011-11-18 Ciena Corporation   Progress on G.8021.1     Q9/15, Q12/15  
[ 1593 ]  
(Rev.1) 
2011-11-18 Ciena Corporation   Editing of G.8010 V2     Q12/15  
[ 1592 ]  
(Rev.1) 
2011-11-18 Ciena Corporation   E-OTN work overlap among Questions     Q9/15, Q12/15, Q10/15  
[ 1591 ]  
(Rev.1-3) 
2011-11-18 Telefon AB - LM Ericsson   EEC with enhanced Holdover     Q13/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60 - 61 - 62 - 63 - 64 - 65 - 66 - 67 - 68 - 69 - 70 - 71 - 72 - 73 - 74 - 75 - 76 - 77 - 78 - 79 - 80 - 81 - 82 - 83 - 84 - 85 - 86 - 87 - 88 - 89 - 90 - 91 - 92 - 93 - 94 - 95 - 96  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21