Contributions  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 1765 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
G.fast: Reverse powering over twisted pair
|
Q4/15
|
|
[ 1764 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
A protection switching method by re-using EqD values in GPON or XG-PON1
|
Q2/15
|
|
[ 1763 ]
(Rev.1) |
2011-11-22 |
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Consideration on the use of a new Ethertype for MPLS-TP
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
|
[ 1762 ]
(Rev.1) |
2011-11-22 |
China Unicom
,
ZTE Corporation
|
OTN SMP
|
Q9/15
|
|
[ 1761 ]
(Rev.1) |
2011-11-22 |
China Unicom
,
ZTE Corporation
|
Consideration on scope of OTN SMP
|
Q9/15
|
|
[ 1760 ]
(Rev.1) |
2011-11-22 |
China Unicom
,
ZTE Corporation
|
One service with multiple protection paths in SMP
|
Q9/15
|
|
[ 1759 ]
(Rev.1) |
2011-11-22 |
China Unicom
,
ZTE Corporation
|
Race conditions in G.smp
|
Q9/15
|
|
[ 1758 ]
(Rev.1) |
2011-11-22 |
China Unicom
,
ZTE Corporation
|
Automatic switch in G.smp
|
Q9/15
|
|
[ 1757 ]
(Rev.1) |
2011-11-22 |
China Unicom
,
ZTE Corporation
|
Consideration on the adaptation of OTU5 over multichannel parallel interfaces
|
Q11/15
|
|
[ 1756 ]
(Rev.1) |
2011-11-22 |
Japan
|
MPLS-TP OAM Recommendations - Proposed way forward
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
|
[ 1755 ]
(Rev.1) |
2011-11-22 |
Japan
|
Possible scenario and actions to allow progress on MPLS-TP
|
Q10/15
|
|
[ 1754 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
Proposal of new recommendation on multi layer converged transport network (G.mlctn)
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
|
[ 1753 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
Draft of multi layer converged network informative document
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
|
[ 1752 ]
(Rev.1) |
2011-11-22 |
JDSU Deutschland GmbH
|
JDSU Time Offset Measurement
|
Q13/15
|
|
[ 1751 ]
(Rev.1) |
2011-11-22 |
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
OKI Electric Industry Company Ltd. (OKI)
|
Draft document of G.epon
|
Q2/15
|
|
[ 1750 ]
(Rev.1) |
2011-11-22 |
Communications and Information network Association of Japan (CIA
|
Proposal for change of jitter test parameters in O.174 amd.1
|
Q15/15
|
|
[ 1749 ]
(Rev.1) |
2011-11-22 |
Communications and Information network Association of Japan (CIA
|
Proposal for Jitter measurement linearity in Appendix VII/O.172
|
Q15/15
|
|
[ 1748 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
Consideration on the node numbers and transmission distance of OTN SRP
|
Q9/15
|
|
[ 1747 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
Proposed text for the description of Extra Traffic in Draft Rec. G.873.2
|
Q9/15
|
|
[ 1746 ]
(Rev.1) |
2011-11-22 |
Electronics and Telecommunications Research Institute (ETRI)
|
Proposal of DC-DQPSK in G.sup39
|
Q6/15
|
|
[ 1745 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
Parameter Definitions of delay line interferometer of DQPSK in G.671
|
Q7/15
|
|
[ 1744 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
Requirement for communication latency, latency variation and loss as traffic engineering performance metrics in ASON
|
Q14/15, Q12/15
|
|
[ 1743 ]
(Rev.1-2) |
2011-11-22 |
China Unicom
,
ZTE Corporation
|
Considerations on beyond 100G transmission for G.Sup 39
|
Q6/15
|
|
[ 1742 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
Proposal for studying constellation in G.Sup39
|
Q6/15
|
|
[ 1741 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
Considerations on EVM in G.698.2
|
Q6/15
|
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
51 -
52 -
53 -
54 -
55 -
56 -
57 -
58 -
59 -
60 -
61 -
62 -
63 -
64 -
65 -
66 -
67 -
68 -
69 -
70 -
71 -
72 -
73 -
74 -
75 -
76 -
77 -
78 -
79 -
80 -
81 -
82 -
83 -
84 -
85 -
86 -
87 -
88 -
89 -
90 -
91 -
92 -
93 -
94 -
95 -
96
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):