International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 1840 ]  
 
2011-11-22 Alcatel-Lucent Bell N.V.   G.8032 ERP as a sub-type of G.8011.5 EPLAN and of G.8011.3 EVPLAN types 1, 2, and 3     Q10/15  
[ 1839 ]  
 
2011-11-22 AimValley BV , Alcatel-Lucent Bell N.V.   Proposed modifications to draft G.8032v3     Q9/15  
[ 1838 ]  
 
2011-11-22 Alcatel-Lucent Bell N.V.   G.8021 and G.8051 updates to support MI specified in G.8031v3 as corrected and G.8032v3     Q9/15, Q14/15  
[ 1837 ]  
 
2011-11-22 Alcatel-Lucent Bell N.V.   Withdrawn - Duplicate of C-1838  
Forthcoming
 
Q9/15, Q14/15  
[ 1836 ]  
 
2011-11-22 Alcatel-Lucent Bell N.V. , Orckit Corrigent   Clarification on the meaning of "top priority local request" for CLEAR, clearance of SF(-P) (or of SD if applicable), or expiration of WTR in G.8031     Q9/15  
[ 1835 ]  
(Rev.1) 
2011-11-22 Corning Incorporated   Statistical Analysis of MPI in Bend Insensitive Fibres     Q5/15  
[ 1834 ]  
(Rev.1) 
2011-11-22 Corning Incorporated   Updated proposal for Future revision to ITU-T Recommendation G.654     Q8/15, Q5/15  
[ 1833 ]  
(Rev.1) 
2011-11-22 Corning Incorporated   Future revision to ITU-T Recommendation G.657 (bend insensitive SMF)     Q5/15  
[ 1832 ]  
(Rev.1) 
2011-11-22 United Kingdom   Proposal to reference IETF RFCs in ITU-T Recommendations     Q10/15  
[ 1831 ]  
(Rev.1) 
2011-11-22 China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Text proposal for clause 16 "Multiplexing/aggregation of Ethernet Connection signals" in new Recommendation G.8012.1     Q10/15  
[ 1830 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   Updated requirement description and proposed text for adaptive bandwidth scenario in G.808.1     Q9/15  
[ 1829 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   Proposal to add ETH CL-SNCG/I protection to G.8031     Q9/15  
[ 1828 ]  
(Rev.1) 
2011-11-22 Gemfire Europe Limited , Huawei Technologies Co. Ltd.   G.sdapp ongrid frequencies up&down on decision 2 of G.sdapp decision tree     Q6/15  
[ 1827 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   Proposal for refining the OSNR calculation with the impact of channel-dependent variation     Q6/15  
[ 1826 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   Proposal for ODB parameter values for 40G applications in G.698.2     Q6/15  
[ 1825 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   Proposal for modifying wording on Flexible Grid in revised G.694.1     Q6/15  
[ 1824 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   Proposal for modifying definition of OSNR in G.Sup39     Q6/15  
[ 1823 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   Proposal for eye mask related criteria for DQPSK time domain skew detection in G.698.2     Q6/15  
[ 1822 ]  
(Rev.1) 
2011-11-22 Italy   Considerations about PTN and PSN applications for MPLS-TP     Q9/15, Q3/15, Q14/15, Q12/15, Q10/15  
[ 1821 ]  
(Rev.2) 
2011-11-22 Italy   Considerations about collaboration between ITU-T and IETF on MPLS-TP     Q9/15, Q3/15, Q14/15, Q12/15, Q10/15  
[ 1820 ]  
(Rev.1) 
2011-11-22 Italy   Considerations for determination and approval of G.8113.1     Q10/15  
[ 1819 ]  
(Rev.1) 
2011-11-22 Alphion Corporation , Gemfire Europe Limited , Huawei Technologies Co. Ltd. , Juniper Networks   G.sdapp offgrid frequencies proposal on decision 3 of G.sdapp decision tree     Q6/15  
[ 1818 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics     Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15  
[ 1817 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd. , NEC Corporation   G.8021 editors contribution: OAM extraction process     Q9/15  
[ 1816 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd. , Infinera Corporation   ODU SMP signalling considerations     Q9/15  
[ 1815 ]  
(Rev.1) 
2011-11-22 Electronics and Telecommunications Research Institute (ETRI)   Interworking G.873.2 ODUk SRP with G.873.1 ODUk SNCP     Q9/15  
[ 1814 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd. , Infinera Corporation   Proposal of ODU Shared Mesh Protection     Q9/15  
[ 1813 ]  
(Rev.1) 
2011-11-22 Ericsson UK , Huawei Technologies Co. Ltd.   Protection Switching Interwoirking     Q9/15  
[ 1812 ]  
 
2011-11-22 Electronics and Telecommunications Research Institute (ETRI)   Withdrawn, duplicate  
Withdrawn
 
Q9/15  
[ 1811 ]  
(Rev.1) 
2011-11-22 British Telecommunications Public Ltd. Co. (BT Plc)   [G.fast] TDD Framing Parameters for G.fast     Q4/15  
[ 1810 ]  
(Rev.1) 
2011-11-22 Electronics and Telecommunications Research Institute (ETRI)   Comments on the draft G.7044     Q11/15  
[ 1809 ]  
(Rev.1) 
2011-11-22 Electronics and Telecommunications Research Institute (ETRI)   Consideration of APS communication and protection architectures for Ethernet rooted multipoint connection protection     Q9/15  
[ 1808 ]  
(Rev.1) 
2011-11-22 China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Text proposal for clause 15 "Mapping of client signals" in new Recommendation G.8012.1     Q10/15  
[ 1807 ]  
(Rev.1) 
2011-11-22 Electronics and Telecommunications Research Institute (ETRI)   A proposal of the modification for the draft G.7044     Q11/15  
[ 1806 ]  
(Rev.1) 
2011-11-22 France Télécom Orange , Telecom Italia S.p.A.   G.fast: Requirements for a FTU-O transceiver operating in VDSL2 mode     Q4/15  
[ 1805 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   Introduction of the super timeslots for ODU5     Q11/15  
[ 1804 ]  
 
2011-11-22 France   Avoiding an unsatisfactory outcome of the MPLS-TP OAM standardisation     QALL/15  
[ 1803 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   Multi-VID ETH MEP and MIP functions     Q9/15  
[ 1802 ]  
(Rev.1) 
2011-11-22 ZTE Corporation   Progress on ICCP extension for the MSP application     Q9/15  
[ 1801 ]  
(Rev.1) 
2011-11-22 China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Text proposal for Annex A "P2P, RMP, MP2MP, Hairpin Ethernet Connection Identifiers" of G.8012.1     Q10/15  
[ 1800 ]  
(Rev.1) 
2011-11-22 China Mobile Communications Corporation , China Unicom , ZTE Corporation   Propose to improve the throughput measurement defined in Y.1731     Q10/15  
[ 1799 ]  
(Rev.1) 
2011-11-22 ZTE Corporation   Comments and proposals on G.8131.1 text     Q9/15  
[ 1798 ]  
(Rev.1) 
2011-11-22 Telecom Italia S.p.A.   Assessing the use of existing optical fibre links     Q5/15, Q18/15, Q17/15  
[ 1797 ]  
(Rev.1) 
2011-11-22 China , China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation   Proposals on the conditions for dLOC and dUNP defined in G.8021     Q9/15  
[ 1796 ]  
(Rev.1) 
2011-11-22 Hitachi, Ltd.   Consideration of agenda items for p2mp protection switching     Q9/15  
[ 1795 ]  
(Rev.1) 
2011-11-22 Huawei Technologies Co. Ltd.   G.8012 - G.8012.1 relationship     Q10/15  
[ 1794 ]  
(Rev.1) 
2011-11-22 Hitachi, Ltd.   Comment on p2mp protection switching documentation     Q9/15, Q10/15  
[ 1793 ]  
(Rev.1) 
2011-11-22 Telecom Italia S.p.A.   Operator needs in the New Generation Network deployment     Q5/15, Q18/15, Q17/15  
[ 1792 ]  
(Rev.1) 
2011-11-22 Hitachi, Ltd.   Consideration of hierarchical EVPRM architecture     Q10/15  
[ 1791 ]  
(Rev.1) 
2011-11-22 Hitachi, Ltd.   Clarification of EVPRM service type description     Q10/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21