International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60 - 61 - 62 - 63 - 64 - 65 - 66 - 67 - 68 - 69 - 70 - 71 - 72 - 73 - 74 - 75 - 76 - 77 - 78 - 79 - 80 - 81 - 82 - 83 - 84 - 85 - 86 - 87 - 88 - 89 - 90 - 91 - 92 - 93 - 94 - 95 - 96  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 1915 ]  
(Rev.1) 
2011-11-22 Nokia Siemens Networks GmbH & Co. KG   Proposal to remove Class A/ Class B metric classification from G.8260     Q13/15  
[ 1914 ]  
(Rev.1) 
2011-11-22 Mitsubishi Electric Corporation , OKI Electric Industry Company Ltd. (OKI)   Proposal to define G.epon managed entities in OMCI     Q2/15  
[ 1913 ]  
(Rev.1) 
2011-11-22 British Telecommunications Public Ltd. Co. (BT Plc)   [G.vdsl] Proposal to develop a VDSL2bis recommendation     Q4/15  
[ 1912 ]  
 
2011-11-22 Huawei Technologies Co. Ltd. , China Mobile Communications Corporation , China Telecommunications Corporation   Maintaining the common OTN functional model in draft revised G.872     Q9/15, Q14/15, Q12/15, Q11/15  
[ 1911 ]  
(Rev.1) 
2011-11-22 Nokia Siemens Networks GmbH & Co. KG   G.8263 holdover requirement/squelch     Q13/15  
[ 1910 ]  
(Rev.1) 
2011-11-22 British Telecommunications Public Ltd. Co. (BT Plc)   G.VDSL2: Accuracy Requirements for KL0     Q4/15  
[ 1909 ]  
(Rev.1-2) 
2011-11-22 Nokia Siemens Networks GmbH & Co. KG   PDV tolerance masks for HRM-1 and HRM-2     Q13/15  
[ 1908 ]  
 
2011-11-22 Huawei Technologies Co. Ltd.   Alignment of G.7044 and G.798     Q9/15  
[ 1907 ]  
(Rev.1) 
2011-11-22 CopperGate Communications   G.wnb: proposed updates to the G.wnb Recommendation     Q4/15  
[ 1906 ]  
(Rev.1) 
2011-11-22 Israel   G.8113.1 - Going Forward     Q10/15  
[ 1905 ]  
 
2011-11-22 Israel   Withdrawn - Duplicate of C-1906  
Withdrawn
 
Q10/15  
[ 1904 ]  
 
2011-11-22 Israel   Withdrawn - Duplicate of C-1906  
Withdrawn
 
Q10/15  
[ 1903 ]  
(Rev.1) +Add.1 
2011-11-22 Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co. Ltd.   Differences between APS and PSC for MPLS-TP linear protection     Q9/15  
[ 1902 ]  
(Rev.1) 
2011-11-22 Nippon Telegraph and Telephone Corporation (NTT)   Draft "multi-layer converged transport networks" and some discussion points     Q12/15  
[ 1901 ]  
(Rev.1) 
2011-11-22 Nippon Telegraph and Telephone Corporation (NTT)   Proposal of reconsideration for future planning of standardization for MPLS-TP related Recommendations     Q9/15, Q3/15, Q14/15, Q12/15, Q10/15  
[ 1900 ]  
 
2011-11-22 China , China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd.   Proposal for maintaining Optical Duo Binary as modulation format for 40G applications in G.698.2     Q6/15  
[ 1899 ]  
(Rev.1) 
2011-11-22 British Telecommunications Public Ltd. Co. (BT Plc)   [G.fast] BT requirements for G.fast     Q4/15  
[ 1898 ]  
(Rev.1) 
2011-11-22 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: Mechanism for managing TDD and S-TDMA framing parameters     Q4/15  
[ 1897 ]  
(Rev.1) 
2011-11-22 Nippon Telegraph and Telephone Corporation (NTT)   Consideration of approval of both MPLS-TP OAM Recommendations(G.8113.1 based on Ethernet and G.8113.2 based on MPLS)     Q9/15, Q3/15, Q14/15, Q12/15, Q10/15  
[ 1896 ]  
(Rev.1) 
2011-11-22 Lantiq Beteiligungs-GmbH & Co. KG   G.hn: Update proposal for G.hn management parameters     Q4/15  
[ 1895 ]  
 
2011-11-22 France Télécom Orange   G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented     Q13/15  
[ 1894 ]  
 
2011-11-22 France Télécom Orange   G.8271: Editorial comments on latest draft     Q13/15  
[ 1893 ]  
 
2011-11-22 France Télécom Orange   G.8263: Section 9 - PEC-S-F holdover     Q13/15  
[ 1892 ]  
 
2011-11-22 France Télécom Orange   G.8263: Section 6 - PEC-S-F slave clock noise generation     Q13/15  
[ 1891 ]  
 
2011-11-22 France Télécom Orange   G.8263: New Appendix discussing time constant values     Q13/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60 - 61 - 62 - 63 - 64 - 65 - 66 - 67 - 68 - 69 - 70 - 71 - 72 - 73 - 74 - 75 - 76 - 77 - 78 - 79 - 80 - 81 - 82 - 83 - 84 - 85 - 86 - 87 - 88 - 89 - 90 - 91 - 92 - 93 - 94 - 95 - 96  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21