International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60 - 61 - 62 - 63 - 64 - 65 - 66 - 67 - 68 - 69 - 70 - 71 - 72 - 73 - 74 - 75 - 76 - 77 - 78 - 79 - 80 - 81 - 82 - 83 - 84 - 85 - 86 - 87 - 88 - 89 - 90 - 91 - 92 - 93 - 94 - 95 - 96  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 1940 ]  
 
2012-06-04 N/A   Not used  
No document uploaded
 
N/A  
[ 1939 ]  
 
2012-01-06 N/A   Not used  
Withdrawn by submitter
 
N/A  
[ 1938 ]  
 
2011-11-24 Alcatel-Lucent Bell N.V.   G.fast: Multi-layer TCAM     Q4/15  
[ 1937 ]  
 
2011-11-23 Deutsche Telekom AG   Mapping of G.798 atomic functions to G.874.1 object classes     Q14/15  
[ 1936 ]  
 
2011-11-23 Lantiq Beteiligungs-GmbH & Co. KG   G.hnem: Proposal for subcarrier spacing of coexistence preamble symbols     Q4/15  
[ 1935 ]  
 
2011-11-23 Alcatel-Lucent Bell N.V.   G.vector: Editorial fix in G.993.5 Figure 7-4 and 7-5.     Q4/15  
[ 1934 ]  
 
2011-11-23 Alcatel-Lucent Bell N.V.   G.gen: G.vdsl: G.vector: VDSL2 Dynamic Virtual Noise     Q4/15  
[ 1933 ]  
 
2011-11-23 Alcatel-Lucent Bell N.V.   G.ploam: MIB parameters to support the ATTNDR improved calculation method     Q4/15  
[ 1932 ]  
 
2011-11-23 Alcatel-Lucent Bell N.V.   G.vdsl: ATTNDR improved calculation method: proposed text changes     Q4/15  
[ 1931 ]  
 
2011-11-23 Alcatel-Lucent Bell N.V.   G.fast: TDMA performance in practical topologies     Q4/15  
[ 1930 ]  
 
2011-11-23 Alcatel-Lucent Bell N.V.   G.fast: TCAM: regain the capacity lost in the noise margin     Q4/15  
[ 1929 ]  
 
2011-11-23 Electronics and Telecommunications Research Institute (ETRI) , KT Corporation , LG-Ericsson   Freq Grid and Index contrast for OD/OM filters     Q6/15  
[ 1928 ]  
 
2011-11-23 Deutsche Telekom AG   Measurement Methods for Phase/Time Clocks     Q13/15  
[ 1927 ]  
 
2011-11-23 Deutsche Telekom AG   PTP and SyncE over OTN-ODU0     Q13/15  
[ 1926 ]  
 
2011-11-23 Deutsche Telekom AG   G.8271: Minor editorial improvements     Q13/15  
[ 1925 ]  
 
2011-11-23 Deutsche Telekom AG , France Télécom Orange   G.8271 1pps interface performance specification     Q13/15  
[ 1924 ]  
 
2011-11-22 Tellabs Oy , France Télécom Orange   Additional Simulation Results of Packet Slave Clock Frequency Based Upon 2nd Order PLL     Q13/15  
[ 1923 ]  
(Rev.1) 
2011-11-22 Lantiq Beteiligungs-GmbH & Co. KG   G.hnem: Proposal for text fixes in G.9956     Q4/15  
[ 1922 ]  
(Rev.1) 
2011-11-22 Lantiq Beteiligungs-GmbH & Co. KG   G.hnem: Number of PFH symbols for regions other than Europe and North America     Q4/15  
[ 1921 ]  
 
2011-11-22 British Telecommunications Public Ltd. Co. (BT Plc)   [G.ADSL] Low Power ADSL2 (and ADSL2plus)     Q4/15  
[ 1920 ]  
(Rev.1) 
2011-11-22 Lantiq Beteiligungs-GmbH & Co. KG   G.hnem: On the maximum number of payload repetitions in G.9955     Q4/15  
[ 1919 ]  
(Rev.1) 
2011-11-22 Lantiq Beteiligungs-GmbH & Co. KG   G.hnem: Proposal to update the text describing the interleaver     Q4/15  
[ 1918 ]  
(Rev.1) 
2011-11-22 Lantiq Beteiligungs-GmbH & Co. KG   G.hnem: Text changes to accommodate 1-bit BAT     Q4/15  
[ 1917 ]  
(Rev.1) 
2011-11-22 Lantiq Beteiligungs-GmbH & Co. KG   G.hnem: Proposal to update the text for Annex E of G.9955     Q4/15  
[ 1916 ]  
(Rev.1) 
2011-11-22 Nokia Siemens Networks GmbH & Co. KG   Parameter proposals for PTP time profile     Q13/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60 - 61 - 62 - 63 - 64 - 65 - 66 - 67 - 68 - 69 - 70 - 71 - 72 - 73 - 74 - 75 - 76 - 77 - 78 - 79 - 80 - 81 - 82 - 83 - 84 - 85 - 86 - 87 - 88 - 89 - 90 - 91 - 92 - 93 - 94 - 95 - 96  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21